GAIL Gas Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
GAIL Gas Limited Tender
Civil And Construction
Energy, Oil and Gas
Transportation and Logistics
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date23 Dec 2024
Closing Date21 Jan 2025
Tender AmountRefer Documents
Costs
EMD
₹ 14,14,628Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GAILG_220907_1Bid Award Id
ViewTender No
GAIL GAS/NOIDA/4834/NKG/24-25/86Tender Authority
GAIL Gas Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
2) 2 Nos. LNG UNLOADING PUMP HAVING CAPACITY OF 350 LPM VERTICAL CANNED TYPE FOR LNG UNLOADING FROM TANKER
NOTE:-
1) supply & Assembly of all pressurized pipeline & piping required for liquid,gas,vent,Nitrogen purging & instruments line as per OEM & other std. engineering specification.
2) FLP Electric Motor with VFD driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram.
3) unloading skid with 2 nos. of LNG unloading pump which will unload LNG from road tanker to storage tank with minimum 350 LPM flow and approx. 8 – 10 bar (g) differential pressure of LNG (or as required).
4) The unloading skid shall have centrifugal pump suitable for LNG service and shall have a return line for tanker. 5) supply of SS LNG unloading hoses including with vapour return line hose at LNG tanker unloading bay for connection of LNG tanker to unloading pump skid having design temperature range from -196°C up to +80°C
-
-
-
... More
3) 1 NOS. LNG DISPENSING PUMP HAVING CAPACITY OF 150 LPM (VERTICAL CANNED TYPE) ALONG WITH INTERCONNECTION ARRANGEMENT FOR FUTURE 2ND LNG DISPENSING PUMP.
NOTE:-
1) supply & Assembly of all pressurized pipeline & piping required for liquid,gas,vent,Nitrogen purging & instruments line as per OEM & other std. engineering specification.
2) FLP Electric Motor with VFD driven LNG PUMPS along with all necessary accessories as specified in data sheet, system design basis and process flow diagram.
3) 1 nos. LNG dispensing pump at present scope along with interconnection piping arrangment for future 2nd LNG dispensing pump having capacity 150 LPM flow and approx. 12 – 17 bar (g) differential pressure of LNG (or as required).
4) The unloading skid shall have centrifugal pump suitable for LNG service and shall have a return line for tanker.
-
-
-
... More
4) 1 NO. SATURATED VERTICAL FORCED DRAFT TYPE (WITH AIR COOLED MEDIA) VAPORIZER HAVING CAPACITY OF 4000 kg/Hr.
NOTE:-
1) In order to increase the temperature of the cold LNG to saturated temperature before LNG dispenser, along with VFD motor driven FD fan and all necessary accessories.
2) Vaporiser should be designed as per ASME SEC-VIII Div. / PED/NFPA-59A/ other inetrnational code.
2) The vaporiser material and design comply as per ASME Boiler and Pressure Vessel Code.
3) Actual flow rate of vaporiser based on ambient & operation hour and same should be decided by OEM for maintaing the required flow capacity.
4) OEM should suitably size of vaporiser based on required flow rate of 150 LPM including with contineous operating correction factors,fluid & other climate correction factor etc.
-
-
-
... More
5) 1 NOS. LNG DISPENSER HAVING CAPACITY OF 150 LPM ALONG WITH INTERCONNECTION ARRANGEMENT FOR FUTURE 2ND LNG DISPENSER.
NOTE:-
1) LNG dispener equiped with VFD driven LNG pumps, nozzle(s) for fuelling LNG with or without vapour return/recovery hose(s) for fuelling LNG , hose(s) for vapour recovery when not integrated with the fuelling hose , dummy receptacle or parking dock for the nozzle, breakaway device(s) when not in use, flow meter(s) for fuelling & vapour return line, temperature and pressure sensors and transmitters,F&G devices, desnisty meter etc. along with pipe work and control valves, including thermal and pressure relief valves, electrical and pneumatic power supply, dispenser cabinet with display monitors for price & qty. , start,stop & ESD push button for the LNG dispenser unit.
2) LNG Driver choice of cold or saturated LNG fuelling , Earthing connection, Compatible with all truck brand etc
-
-
-
... More
6) 2 NOS. (1W + 1S) LNG CORIOLIS MASS FLOW METER AT UNLOADING BAY HAVING FLOW CAPACITY 10000 kg/Hr. NOTE:-
1) Mass flow meter should conifrms to SIL 2/3; CT: OIML R117, R137, MI-005, MI-002; API, AGA & other Statutory approvals. 2) Mass flow Meter shall be W & M /MID/ OIML 117 approved for custody Transfer Metering.
3) RS485 interface communicate with MODBUS RTU protocol.
4) Control the solenoid valves on the pipe of liquid, vapor, liquid collection and nitrogen. The valves could be controlled automatically during the loading process.
5) Operating flow capacity upto 10000 kg/hr for meter each unit.
6) Vendor should suitable consider Mass flow meter range capacity based on operating flow considered as mentioned in PFD.
7) It includes All other instruments & control systems cables, Explosion proof JB, ESD system along with other communication cables,glands,software & RS485 modbus/profibus/TCP communication protocol and other dignosis tool
-
-
-
... More
7) 1 NO. LNG CORIOLIS MASS FLOW METER AT LNG DISPENSING LINE HAVING FLOW CAPACITY 4000 kg/Hr. NOTE:-
1) Mass flow meter should conifrms to SIL 2/3; CT: OIML R117, R137, MI-005, MI-002; API, AGA & other Statutory approvals.
2) Mass flow Meter shall be W & M /MID/ OIML 117 approved for custody Transfer Metering.
3) RS485 interface communicate with MODBUS RTU protocol.
4) Control the solenoid valves on the pipe of liquid, vapor, liquid collection and nitrogen. The valves could be controlled automatically during the loading process.
5) Operating mass flow capacity of LNG upto 11400 kg/hr for meter each unit and 1800 kg/Hr. for vapour Return line.
6) Vendor should suitable consider Mass flow meter range capacity based on operating flow considered as mentioned in PFD.
7) It includes All other instruments & control systems cables, Explosion proof JB, ESD system along with other communication cables,glands,software & RS485 modbus/profibus/TCP communication protocol and other dignosis tool
-
-
-
... More
8) 1 NO. CORIOLIS MASS FLOW METER AT GAS ENGINE DRIVEN GENERATOR HAVING CAPACITY 100KVA FOR METERING OF NATURAL GAS CONSUMPTION.
1) Mass flow meter should conifrms to SIL 2/3; CT: OIML R117, R137, MI-005, MI-002; API, AGA & other Statutory approvals.
2) Mass flow Meter shall be W & M /MID/ OIML 117 approved for custody Transfer Metering.
3) RS485 interface communicate with MODBUS RTU protocol.
4) Control the solenoid valves on the pipe of liquid, vapor, liquid collection and nitrogen. The valves could be controlled automatically during the loading process.
5) Operating mass flow capacity of NG Max. upto 75 kg/hr, however based on Engine load fuel consumption may varies based operation, Accordingly vendor should select the range of mass flow meter.
6) Vendor should suitable consider Mass flow meter range capacity based on operating flow considered as mentioned in PFD.
7) It includes All other instruments & control systems cables, Explosion proof JB, ESD system along with other communication cables,glands,software & RS485 modbus/profibus/TCP communication protocol and other dignosis tool
-
-
-
... More
9) UTILITY, PLC,SCADA,HMI, F&G DEVICE ALONG ASSIOCIATED ELECTRICAL & INSTRUMENTATION CONTROL SYSTEM INTEGRATION 1 No. compressor for utility air requirements with Air dryer and Built in air reciever of suitable capacity for catering utility air requirements in instrumentation systems along with associated automation PLC & SCADA system and supply of associated valves, fittings, double-walled vacuum jacketed pipe in line with scope of work, PJS, Datasheets & Specification attached with tender document. All work shall be in line with applicable Indian regulations and codes.
Scope shall also include Design, engineering, supply of Instrumentation System Comprising of field instruments (including Gas Detectors and Temperature elements for the leakage detection purpose), cables, JB, cable tray, HMI, PLC system (including provision for future LNG dispensing pump & future LNG dispenser), automation, safety interlocks, integration, erection material, etc. complete in all respects to make the complete integrated system and satisfy all applicable codes and statutory norms in india and as per drg., specification, etc. available in tender document. Scope shall also include Design , engineering, supply, installation, testing and commissioning of Electrical systems to make the electrical works complete in all respects as detailed in Process Flow Diagram, SOR, PJS / Scope of work and to satisfy all applicable codes and statutory norms in India and and as per the tender specifications.
Note 1.: Bidder shall visit the site to assess the quantum of work & Site feasibility before bidding and quote accordingly.
Note 2.: Fire fighting facility is excluded from the scope of the present tender. However, integration with fire water pumps and fire alarm system to be considered by the bidder.
Note 3: Civil works, architectural works and structural works are excluded from the scope of the present tender. However, Vendor shall furnish the detailed construction drawings of foundations of their vessels/ equipment/ supports etc to be submitted to CLIENT/PMC for review and approval which shall be constructed by the contractor through other tender.
Note 4: Installation of distribution piping for future dispenser ( Bidder to note that only one dispenser is in present scope of supply, future dispenser is not in scope of supply ) along with control (PLC & SCADA etc) and safety systems (integration with fire water pumps and fire alarm system etc.) are included in present scope of work of bidder. Note 5: Installation of distribution piping for future dispensing pump ( Bidder to note that only one dispensing pump is in present scope of supply, future dispensing pump is not in present scope of supply ) along with control (PLC & SCADA etc) and safety systems (integration with fire water pumps and fire alarm system etc.) are included in present scope of work of bidder.
-
-
-
... More
ERECTION, TESTING & COMMISSIONING OF LNG STORAGE FACILITY ALONG WITH LNG DISPENSING FACILITY AT KOSIKALAN
-
-
-
... More
ERECTION, TESTING & COMMISSIONING OF LNG STORAGE FACILITY ALONG WITH LNG DISPENSING FACILITY AT KOSIKALAN
The scope of work consist of erection/ installation of all equipment ( including installation of equipment interconnecting piping and other accessaries ) as defined under tender document. Scope also include design, engineering, procurement of materials required for fabrication, erection and carrying out site work for all mechanical, piping, electrical, instrumentation, automation, safety interlocks, PLC based control system, PLC & SCADA system etc. to complete the work in all respects including testing (as required), pre-commissioning and commissioning of the complete system.
1
-
-
... More
Notes: a. Liquid Nitrogen, etc. required for pre-commissioning of cryogenic equipment is also included in the scope and quoted price.
b. Transportation of LNG from Dahej plant for first filling of storage tanks required for commissioning is also included in the scope and quoted price. However LNG molecules for first filling shall be issued free by GAIL GAS. ( Reimbursement for LNG consumed during commissioning to be paid by bidder)
c. Providing technical and liaisoning assistance to GAIL GAS LTD / EPMC for obtaining statutory approvals shall also be included in the scope and quoted price.
d. Bidder to include the start-up and commissioning spares for complete system in the quoted price. However, list of spares (start up and commissioning) to be submitted at the offer stage. Minimum 200% spares gaskets and 50 % spare fasteners (at least 1 no. of each size) to be supplied as commissioning & start-up spares.
e. Comprehensive operation and maintenance of the complete system including all spare parts and consumables for 1 years are in the scope of vendor. However, Comprehensive operation and maintenance Service may be extendable for another 2 years as per owner’s requirement (at sole discretion of owner) at the rates quoted by the vendor (i.e. two years comprehensive operation and maintenance inclusive of all manpower, spare parts charges, and consumables) with 5% annual escalation, at same terms & conditions. However, manpower required for money collection, billing, etc. for LNG dispensing are not in the vendor scope.
f. Civil, structural and Architectural works are excluded from the supplier's scope. However, Vendor shall furnish the detailed construction drawings of foundations of their vessels/ equipment/ supports etc to be submitted to CLIENT/PMC for review and approval which shall be constructed by the contractor through other tender.
g. Fire-fighting facility is excluded from the scope of the present tender. However, integration with fire water pumps and fire alarm system to be considered by the bidder.
h. Bidder has to quote against each & every SOR Item . No SOR Item can be left blank and/ or clubbed with any other SOR Item.
-
-
-
... More
ELECTRICAL WORKS FOR LNG STORAGE FACILITY ALONG WITH LNG DISPENSING FACILITY AT KOSIKALAN
-
-
-
... More
Supply , Erection, testing & Commissioning
-
-
-
... More
415 V LT PMCC Panel
-
-
-
... More
Design, engineering, manufacture, shop testing, Supply , Erection, testing & Commissioning, packing and forwarding, transportation, delivery at storage and from storage to site of PMCC Panel having feeder for VFD Board, LDBs,UPS, Jockey pumps & main Pumps etc. including spare feeders, as per P&ID & Flow diagram, shall be complete in all respect to commission the project :
1
-
-
... More
415 V VFD Board
-
-
-
... More
Design, engineering, manufacture, shop testing, Supply , Erection, testing & Commissioning, packing and forwarding, transportation, delivery at storage and from storage to site of VFD Board including spare feeders, as per P&ID & Flow diagram, shall be complete in all respect to commission the project :
1
-
-
... More
LIGHTING DISTRIBUTION BOARD (LDB)
-
-
-
... More
Design, engineering, manufacture, shop testing,Supply , Erection, testing & Commissioning of Surface/Recess mounted FLP Main Lighting Panel (MLDB-101) as per site rquirement
2
-
-
... More
UPS SYSTEM
-
-
-
... More
Design, engineering, manufacture, shop testing, Supply , Erection, testing & Commissioning, packing and forwarding, transportation, delivery at storage and from storage to site of following :
-
-
-
... More
3KVA, 230 V Single phase, 50 Hz, single industrial type, UPS system suitable for input Power supply voltage of 320V-460V-TPN with healthy single-Phase Selection, Output 230V +/-1%, AC with Bypass supply, Battery Bank, ACDB (Incomer 32A DP MCB & Outgoing 10 Nos. 6A to 10A DP MCB) and 2.0 hrs. Battery backup (VRLA, 12V) and battery capacity shall not be less than 13.0 KVAh (where KVAH = battery AH x 12 V x No. of Batteries). As per enclosed Specification, Block diagram & Data sheet and shall be complete in all respect. Including All interconnecting cables among UPS, Rectifier, battery stand, ACDB etc (30 mtr shall be considered between battery bank and UPS panel, 30 mtr cable shall be considered between ACDB and UPS panel.
1
-
-
... More
Electrical Power and Control Cables
-
-
-
... More
Supply , Erection, testing & Commissioning of XLPE/PVC insulated, PVC extruded sheathed, FRLS Electrical Power and Control Cables (conforming to IS:7098, 1554, 10810 and specification).
-
-
-
... More
Aluminium Conductor armoured HT,LT, Control & Communication cables as per P&ID, Flow diagram and site requirement along with Cable Glands(double compression), lugs, cable tie etc.
1
-
-
... More
Earthing and Lightning Protection
-
-
-
... More
Design, engineering, manufacture, shop testing, Supply , Erection, testing & Commissioning, packing and forwarding, transportation, delivery at storage and from storage to site of complete earthing and lightning protection system, earth electrodes/ pit, earth main ring, earthing of electrical equipments, instrument panels, field instruments, process equipments and pipes/ flanges including marking, jumpers all associated civil work with all material and labour as per specification & IS-3043 and drawings approved by the Owner/Consultants.
-
-
-
... More
Earth Pits- Copper plate Electrode with 6 mm thick chequered plate cover/SFRC(Size 600 x 550mm)
2
-
-
... More
GI Strip (50X6) mm
500
-
-
... More
GI Strip (25X3) mm
1200
-
-
... More
Copper Strip (25X3) mm
100
-
-
... More
No. 8 SWG Solid GI Wire
100
-
-
... More
Cu lightning rod 25 mm dia. 1800 mm long including Supply , Erection, testing & Commissioning of all hardware bare copper rope labour, test box, isolator, etc. complete as per approved drawings, specifications and directions of Engineer-In-Charge.
1
-
-
... More
Advanced Maintenance Free environment friendly Earthing system consisting of 1 no. of 3mtr length, 25 mm dia UL certified earth electrode made of high tensile low carbon steel circular rods, molecularly bonded copper on outer surface (minimum copper bonding thickness-250 microns) with GI/Cu terminals to connect incoming strips, Chamber etc including Ground enhancing chemical backfill compound for earthpit, this compound shall be odourless and an inert substance. It shall be environment friendly and doesnot attack the soil or corrode the metal electrodes ,complete in all respect (Environment freindly backfill compound duly certified as per ANSI/NSF standard 60/Toxic content certificate as safe for use near potable ground water resources.
12
-
-
... More
OUTDOOR LIGHTING
-
-
-
... More
Design, engineering, shop testing, Supply , Erection, testing & Commissioning, packing and forwarding, transportation, delivery at storage and from storage to site lighting fixtures complete with mounting bracket, flame proof/non flame proof, control gear box as per the type of fixture, lamps etc. including civil work with pipe inserts for cables and connecting work, with all material and labour as per specifications, drawings and instruction of Engineer-in-charge. Work to be completed in all respects.
-
-
-
... More
Flame proof integral/ Non integral well glass type fixture with 72W LED lamp with flame proof control gear box/JBs(four way) and shall be suitable to fit on building/ structure roof/pole (Make CGL model no.FWL 1212IH/B 72W or equivalent) .
20
-
-
... More
Street lighting pole 6mtr high GI octagonal pole complete with bracket, GI clamps for fixing flame proof control gear box as per standard drawing (GGL/SD/05/E9/77/04) & specification (GGL/TS/05/E9/077B).( Make shall be from approved venor list)
27
-
-
... More
Flame proof non integral flood lighting type fixture with 150W LED lamp and shall be suitable to fit on building/ structure/pole with ON/OFF switch on controlgear . ( Make CGL or equivalent) .
6
-
-
... More
Non Flame proof non integral flood lighting type fixture with 150W LED lamp and shall be suitable to fit on building/ structure/pole and shall be suitable for movement in vertical and horizontal direction (search light, Make CGL or equivalent ) .
1
-
-
... More
Air Conditioners
-
-
-
... More
Design, engineering, shop testing, Supply , Erection, testing & Commissioning, packing and forwarding, transportation, delivery at storage and from storage to site latest model (5 stars BEE certified ,Inverter AC) 2.0 T split AC complete with remote, MS Stand for outdoor unit etc.
1
-
-
... More
Supply , Erection, testing & Commissioning of Flame Proof Welding Socket including structure,Civil Foundation and hardware etc complete in all respect.
-
-
-
... More
Flame proof type 63 Amp. Welding socket
1
-
-
... More
UPVC Pipe
-
-
-
... More
Supply , Erection, testing & Commissioning of following sizes of UPVC Pipe
-
-
-
... More
100 mm NB
200
-
-
... More
200 mm NB
50
-
-
... More
Cable Tray
-
-
-
... More
Supply , Erection, testing & Commissioning of following Hot Dip Galvanized Ladder/Perforated Type cable trays (as per IS 2629) including tray cover, bends, tee, crosses, horizontal and vertical splices , structural support(suitable for three/four tier),hardware,civil work etc,complete in all respect.
-
-
-
... More
Perforated type, made from 50mm height and 2.5 mm thick sheet steel & galvanized (86 microns) of following sizes.
-
-
-
... More
150mm wide
200
-
-
... More
300mm wide
50
-
-
... More
Erection Material
-
-
-
... More
Supply , Erection, testing & Commissioning of MS base frame support for switch gear and bracket for misc.electrical equipment,cable and cable tray support out of roled MS section,pipes,plates etc including welding, bolting,reveting,Supply , Erection, testing & Commissioning of necessary anchor bolts and grouting etc Supply , Erection, testing & Commissioning of paints applying one coat of anti rust primer two finish coats of approved synthetic enamel paints including bracking walls, floors etc for structure as required including Supply , Erection, testing & Commissioning of all GI hardware materials including all labour and materials complete as required and the direction of Engineer-in-charge
1
-
-
... More
Safety Items
-
-
-
... More
Supply , Erection, testing & Commissioning of the following including the Supply , Erection, testing & Commissioning of necessary clamp, bolts, rawl plugs etc. breaking and making good of walls,
-
-
-
... More
Shock hazard charts complete with frame and glass
1
-
-
... More
First Aid Boxes
1
-
-
... More
Carbon-di-oxide(CO2) type fire extinguisher 4.5 Kg capacity Complete with gunmetal valve conforming to IS : 3224 With ISI mark , Discharge horn with bend & wall fixing Bracket, stand etc With Mfg. Test certificate.
4
-
-
... More
Caution boards including Supply , Erection, testing & Commissioning of necessary clamps, bolts and other hardware.
2
-
-
... More
As built Single Line Diagram complete with frame and glass including hardware etc.
1
-
-
... More
Insulating Mats
-
-
-
... More
Supply , Erection, testing & Commissioning of Insulating Mats (as per IS:15652 - 2006) of 1000mm width, for maintenance of electrical equipment in substation/PMCC/MCC as required
-
-
-
... More
3.3 KV grade of 2.5 mm thick
10
-
-
... More
11/0.415 kV, 250 KVA Transformer: Design Engineering, Manufacturing, assembly, inspection, testing, packing and Supply of 415V AC power supply requirements, Including Installation, Testing & commissioning of transformer with all required transformer protection requirements as Engineering & local distribution power supply authority.
1
-
-
... More
POLE Structure Subtation : Design Engineering, Manufacturing, assembly, inspection, testing, packing and Supply of Two pole subtation requirements, Including Installation, Testing & commissioning Including RCC pole 9 meter (As per SEB Std. 2 nos), HT Metering Set with, CT*& PT SET, , Disk & Pin insulators sets, Lightning arrestor set, AB switchesset, DO fuse set, stay set, rms, MS clamps,nut- bolt, supporting chanels & steel structures, 400 A MCCB With box , Connection ACSR Conductor & 3.5 C X 120 sqmm, XLPE Cable, earthing strip with Earthing Electrode set for neutral & body earthing 4 nos, Guard wires , danger boards, anti climbing steel set,
1
-
-
... More
Telephone & LAN
-
-
-
... More
Supply, Erection, Testing and Commissioning of following items at site as per specification :
-
-
-
... More
Telephone sockets (Piano reed Type) in recess PVC conduit including PVC conduit,telephone socket,cable,accessories etc as required.
5
-
-
... More
LAN sockets in recess PVC conduit including PVC conduit,telephone socket,cable,accessories etc as required.
5
-
-
... More
Four pairs,0.61mm, Telephone Cable/Wire, including accessories etc as required.
125
-
-
... More
UTP cable (CAT 6), Make : D Link/Amp/Lucent
125
-
-
... More
Main Distribution Frame - 12 pair
1
-
-
... More
LAN switch with single incomer and min 10-port out going complete in all respect.
1
-
-
... More
Supply & Construction of Cable Pit of all side brick wall (230mm th) with SFRC cover of Size
-
-
-
... More
500 mm X500 mm (of inside clearance) X 600 (Depth)
20
-
-
... More
750 mm X 750 mm (of inside clearance) X 800 mm (Depth)
20
-
-
... More
1000 mm X1000 mm (of inside clearance) X 1000 mm (Depth)
4
-
-
... More
Note A
1) The quantity given above against individual items are tentative and shall not be considered to be binding.
2) All the items required to complete the work shall be the scope of Supply , Erection, testing & Commissioning of contract only
3) Supply , Erection, testing & Commissioning means Supply , Erection, testing & Commissioning of items including all erection accessories as defined above.
-
-
-
... More
NOTE B
i) The bidder must indicate currency(ies) against each item quoted of the SOR
ii) The total amount shall also be given by the bidder in the quoted currency(ies)
-
-
-
... More
All works relating to statutory approvals of the installation from competent authority like Electrical Inspectorate, CEA, DGMS, SEB,PESO etc. including carrying out of all required modifications in design / Manufacturer / Installation to meet the requirement of Indian Electricity rules,PESO and other statutory regulations in force, carrying out necessary paper work and liasion with the authorities to obtain all necessary clearances for Loading,Transportation,Unloading,Erection,Commissioining and charging of installation as per relevant national standards. However the official fees towards the approvals shall be reimbursed by GAIL GAS on the recommendation of PMC/EIC/GAIL GAS rep/GAIL GAS GA Incharge..
1
-
-
... More
GROUP-B COMPREHENSIVE OPERATION AND MAINTENANCE SERVICE FOR LNG STORAGE FACILITY ALONG WITH LNG DISPENSING FACILITY AT KOSIKALAN WILL BE FOR A PERIOD OF ONE YEAR. HOWEVER, COMPREHENSIVE OPERATION AND MAINTENANCE SERVICE MAY BE EXTENDABLE FOR ANOTHER 2 YEARS AS PER OWNER’S REQUIREMENT (AT SOLE DISCRETION OF OWNER) AT THE RATES QUOTED BY THE VENDOR UNDER SL. NO. 74- 81 (I.E. TWO YEARS COMPREHENSIVE OPERATION AND MAINTENANCE INCLUSIVE OF ALL MANPOWER, SPARE PARTS CHARGES AND CONSUMABLES) WITH 5% ANNUAL ESCALATION AT SAME TERMS AND CONDITIONS. STAMPING ARRANGEMENTS FOR THE DISPENSER
-
-
-
... More
Operation and maintenance of LNG STORAGE FACILITY ALONG WITH LNG DISPENSING FACILITY AT KOSIKALAN for PREVIOUS LINE ITEM
-
-
-
... More
Providing manpower consisting of 1 No. Engineer per day (operation + maintenance) (General Shift of 8 hrs) for a minimum period of 1 year from commissioning for continuous normal operations and maintenance at KOSIKALAN. Rate to include lodging, fooding, transportation, salaries, allowances, medical, insurance and all other incidental charges etc. Rate to be valid for extension for another year.
-
-
-
... More
Operation and maintenance of LNG STORAGE FACILITY ALONG WITH LNG DISPENSING FACILITY AT KOSIKALAN Lumpsum per shift (1 engineer x 1 shifts for one year)
365
-
-
... More
Providing manpower consisting of 6 Technicians (operation + maintenance) (2 Technicians in 8 hrs shift each) for a minimum period of 1 year from commissioning for continuous normal operations and maintenance at KOSIKALAN. Rate to include lodging, fooding, transportation, salaries, allowances, medical, insurance and all other incidental charges etc. Rate to be valid for extension for another year.
-
-
-
... More
Operation and maintenance of LNG STORAGE FACILITY ALONG WITH LNG DISPENSING FACILITY AT KOSIKALAN. (2 Technician x 3 shifts per day for one year) Rates to quted for per Shift/technician.
2190
-
-
... More
Comprehensive maintenance charges (excluding manpower) of the entire system (LNG STORAGE FACILITY ALONG WITH LNG DISPENSING FACILITY AT KOSIKALAN) including all spare parts and consumables for below mentioned years are in the scope of vendor.
-
-
-
... More
For 1st year
1
-
-
... More
Stamping arrangements for the dispenser
-
-
-
... More
Stamping & necessary certification for the dispenser from concerned Weights & Measures Authority is included in AMC of bidder. Renewal of Validation of this certificate annually is also included in bidders scope of work.
1
-
-
... More
TRAINING OF 5 Nos. OWNER'S EMPLOYEES FOR OPERATION AND MAINTENANCE OF THE SYSTEM
-
-
-
... More
Bidder shall provide detailed training to owner's employees/client's personnels for the all new installation to enable them to operate the system effectively for 7 days.
1
-
-