GAIL Gas Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

GAIL Gas Limited Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date8 Mar 2024
Closing Date27 Mar 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of PE100, SDR11 line pipes of all sizes including, proper stacking, identification,and supply of accessories of all sizes & thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 32 mm), Warning Mat etc. Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of-Use / route, laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storeage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumables, equipments, labour and other inputs. In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store. -Laying of all PE pipe (PE 100 SDR11), Including supply of HDPE casing pipe (in case of HDD (with case).Moling(with case) , Couplers, End caps etc. (Ref. cl. 4.3 of Particular job specification). -Survey of under ground utilities, execution of the work as per specification, including excavation of pits moling with the hole size not exceeding 20% of the pipe dia, jointing and insertion of carrier pipe with casing, testing & commissioning and restoration of the pits to original condition, submission of As-Built Graph as per specifications and the instruction of Engineer-in-charge. -Casing details is as given below:- 1. For 20/32 mm PE pipe (in 75 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0). 2. For 63 mm PE pipe (in 125 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0). 3. For 90 mm pipe (in 180 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0). 4. For 125 mm pipe (in 250 mm dia. HDPE Casing Pipe, PE63/80 PN 6.0).

-

-

-

... More
Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawings.

-

-

-

... More
Specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works:

-

-

-

... More
Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details and submit same to Owner for review / approval.

-

-

-

... More
Carrying out preliminary activities such as preperation of drawings wherever required for crossing etc.

-

-

-

... More
Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.

-

-

-

... More
Stacking and installation of construction markers, clearing, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities, grading of work area.

-

-

-

... More
Barricading the work area as per local authorities norms & to the satisfaction of Owner/ Eingineer -in- charge, installation of safety signs.

-

-

-

... More
Barricading the pipeline construction area prior to execution of the works as per drawing no. MEC/23QH/05/25/M/000/011 & MEC/23QH/05/25/M/000/10 enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.

-

-

-

... More
Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata (Rock Cutting to be paid separately as per SOR no 1.120) and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher]. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)

-

-

-

... More
Uncoiling / stringing & aligning of PE pipes, clamping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification.

-

-

-

... More
Installation / lowering the pipeline in trench to required depth as per PJS, Technical Specification & drawings, supply & placement of HDPE Yellow colour warning mat (refer PJS item.- 4.2) over the pipeline along the complete route as per standard drawings, data sheets & technical specifications, padding around pipeline including supply of suitable padding material duly approved by EIC, backfilling to its original condition with excavated earth / borrowed select soil/sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles / slabs / curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities.

-

-

-

... More
The scope of work against this item also include Electro-fusion jointing of valves, fittings wherever required and as directed by Engineer-in-charge.

-

-

-

... More
The scope of work against laying of 20/32 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)),(H=300mm & will be as per site condition) ), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply).

-

-

-

... More
Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge.

-

-

-

... More
Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge.

-

-

-

... More
Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work) .

-

-

-

... More
Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise and obtaining "no objection certificate" from Owner/ MECON.

-

-

-

... More
Preparation and submission of Daily progress report, Laying Graphs / PE line cards on daily basis.

-

-

-

... More
On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.

-

-

-

... More
In case, the minimum required depth is not possible due to site condition, necessary mitigation measures (for minimum top cover of 600mm) shall be required to be taken by contractor in consultation with EIC as per PNGRB Guidelines. No additional payment shall be admissible against the same. However required top cover can further be reduce till 375mm and payment against the same shall be made according to SOR item no. 1.3 or 1.4 (whichever is applicable).

-

-

-

... More
Submission of all documents required for contract closure in numbers as mentioned in contract.

-

-

-

... More
Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.

-

-

-

... More
20 mm PE 100 pipe Service line laying upto 4 M length

13157

-

-

... More
20 mm PE 100 pipe

2769

-

-

... More
32 mm PE 100 pipe

2181

-

-

... More
NOTE :

-

-

-

... More
i) The lengths of pipelines are tentative.

-

-

-

... More
ii) For restoration of asphalt / concrete roads, the item for construction of asphalt top / concrete top / Tiles/Stone slab/Paver Blocks/Curb Stones shall be paid separately as per the rates quoted for the same elsewhere in the SOR.

-

-

-

... More
iii) In case, contractor prefers to lay the pipeline through HDD method in place of method as per SOR item- 1.1, contractor shall be required to lay the pipe upto a depth not more than 1.4 m. The payment shall however be made as per SOR item No.- 1.1 only.

-

-

-

... More
iv) In case quantity increases beyond 4 meter (against SOR item no 1.1.a) payment towards additional length shall be paid as per SOR item no. 1.1.b.

-

-

-

... More
v) For PE laying through casing pipe ,payment for length of PE pipe will be done as per casing pipe length.

-

-

-

... More
vi) Payment for items above under pipeline laying in all type of rocky strata shall be made only whereever hard rock is existing and supply and installationj of padding materails(i.e. sand/soft soil)shall be done as per the direction of EIC.Bidders to quote accordingly.

-

-

-

... More
Restoration

-

-

-

... More
Restoration of the roads, pavements, channels, footpaths, tiles, stones etc. to original condition including supply of the approved quality material required, as per local authorities norms, obtaining NOC from concerned local authorities / land owners / third party inspection agencies (if any) designated by owner and to the satisfaction of Engineer-in-charge.

-

-

-

... More
Asphalting

608

-

-

... More
Cement Concrete

608

-

-

... More
Tiles / Paver / Blocks / Curb Stones, Red sand stone

1519

-

-

... More
Brick Soling / Channels, etc.

912

-

-

... More
Providing, hoisting and placing of 75 mm thick precast reinforced cement concrete slab of M-20 grade over pipeline as mechanical protection including the cost of required centering, shuttering, reinforcement complete as per tender drawing and direction of the EIC. Note:- Size (Length x Width) of the precast slab will be decided as per site condition and as per instruction of EIC. Precast slab will be placed in multiple number and various location as per site condition and as per instruction of EIC.

3

-

-

... More
Pipe laying inside Private Property i.e Multistory buildings / apartments with no movement of Heavy Vehicles, surrounded with Boundary wall where pipe top cover could not be achieved 600 mm.

-

-

-

... More
Minimum pipe top cover of 375 mm is required and the line pressure shall not exceed 110mbar.

-

-

-

... More
Necessary mitigation measures such as RCC slab (150mm thick and 300mm width) at the top, the RCC slab of the roof of basement shall be treated as bottom. There shall be sand filling across three sides of the line pipe of 100mm each shall be required to be taken by contractor in consultation with EIC as per latest PNGRB Guidelines. No additional payment shall be admissible against the same.

-

-

-

... More
Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of 20mm, 32mm & 63mm PE pipe (PE 100 SDR11) including proper stacking, identification,and supply of accessories of below mentioned sizes & all thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 63 mm), Warning Mat etc. Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of-Use / route , laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumables,equipments, labour and other inputs. In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store.

-

-

-

... More
Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawing.

-

-

-

... More
Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details, and submit same to Owner for review / approval.

-

-

-

... More
Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.

-

-

-

... More
Barricading the pipeline construction area prior to execution of the works as per drawing no. MEC/23QH/05/25/M/000/011 & MEC/23QH/05/25/M/000/10 enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.

-

-

-

... More
Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata (Rock Cutting to be paid separately as per SOR no 1.120) and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher]. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)

-

-

-

... More
Uncoiling / stringing & aligning of PE pipes, clamping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification.

-

-

-

... More
Installation / lowering the pipeline in trench to required depth, supply & placement of HDPE Yellow colour warning mat (refer PJS item.- 4.2) over the pipeline along the complete route as per drawing no. MEC/U999/05/11/C/ and backfilling to its original condition with excavated earth / borrowed select soil / sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles / slabs / curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities.

-

-

-

... More
The scope of work against laying of 20/32 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)),(H=300mm & will be as per site condition) ), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply).

-

-

-

... More
Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge.

-

-

-

... More
Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge.

-

-

-

... More
Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work) .

-

-

-

... More
Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise and obtaining "no objection certificate" from Owner/ Consultant.

-

-

-

... More
On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.

-

-

-

... More
Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.

-

-

-

... More
20 mm PE 100 pipe / 32 mm PE 100 pipe

43

-

-

... More
Pipe laying inside Private Property i.e Multistory buildings / apartments with no movement of Heavy Vehicles, surrounded with Boundary wall where pipe top cover could not be achieved 600 mm.

-

-

-

... More
Minimum pipe top cover of 375 mm is required and the line pressure shall not exceed 110mbar.

-

-

-

... More
Necessary mitigation measures such as RCC slab (150mm thick and 300mm width) at the top and RCC slab (100mm thick and 300mm width) at bottom. There shall be sand filling across three sides of the line pipe of 100mm each shall be required to be taken by contractor in consultation with EIC as per latest PNGRB Guidelines. No additional payment shall be admissible against the same.

-

-

-

... More
Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of 20mm, 32mm & 63mm PE pipe (PE 100 SDR11) including proper stacking, identification,and supply of accessories of below mentioned sizes & all thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 63 mm), Warning Mat etc. Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of-Use / route , laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumables,equipments, labour and other inputs. In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store.

-

-

-

... More
Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawing.

-

-

-

... More
Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details, and submit same to Owner for review / approval.

-

-

-

... More
Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.

-

-

-

... More
Barricading the pipeline construction area prior to execution of the works as per drawing no. MEC/23QH/05/25/M/000/011 & MEC/23QH/05/25/M/000/10 enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.

-

-

-

... More
Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata (Rock Cutting to be paid separately as per SOR no 1.120) and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher]. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)

-

-

-

... More
Uncoiling / stringing & aligning of PE pipes, clamping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification.

-

-

-

... More
Installation / lowering the pipeline in trench to required depth, supply & placement of HDPE Yellow colour warning mat (refer PJS item.- 4.2) over the pipeline along the complete route as per drawing no. MEC/U999/05/11/C/ and backfilling to its original condition with excavated earth / borrowed select soil / sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles / slabs / curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities.

-

-

-

... More
The scope of work against laying of 20/32 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)),(H=300mm & will be as per site condition) ), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply).

-

-

-

... More
Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge.

-

-

-

... More
Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge.

-

-

-

... More
Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work) .

-

-

-

... More
Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise and obtaining "no objection certificate" from Owner/ Consultant.

-

-

-

... More
On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.

-

-

-

... More
Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.

-

-

-

... More
20 mm PE 100 pipe / 32 mm PE 100 pipe

43

-

-

... More
Supply of GI/ MS/ Concrete Sleeves (wherever required as a Special Case as per instructions of the Engineer-in-charge)

-

-

-

... More
Supply, installation of sleeve, insertion of pipe, sealing the annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge. GI/MS Pipes shall be Heavy (C-Class) as per IS-1239

-

-

-

... More
GI Sleeves /Concrete Sleeves

-

-

-

... More
2 1/2” NB, 1’ Length

1

-

-

... More
4” NB, 1’ Length

1

-

-

... More
MS Enamel Coated

-

-

-

... More
4” NB, 3’ Length

1

-

-

... More
Concrete Sleeve (NP-2 Class)

-

-

-

... More
4” NB, 3’ Length

1

-

-

... More
6” NB, 3’ Length

1

-

-

... More
The decision regarding use of type of sleeves to be used at various locations shall be made by Engineer In-Charge / Owner

-

-

-

... More
Fabrication & Installation of Markers

-

-

-

... More
Warning Plate Markers

-

-

-

... More
Supply, fabrication and installation of plate markers, including application of approved color and quality of primer and paint, stencil letter cutting of lettering, numbers, direction, etc. as per the attached drawing in technical volume to be installed near regulator.

17000

-

-

... More
Excavation of Hard rock/surface

-

-

-

... More
Excavation of trench or pits, wherever hard rock presence is exceeding 1.5 m in any direction of the trench and excavation of trench or pits in Malba/Multiple layers of asphalt/ brick / PCC/RCC etc and removable only by pneumatic chisel / drill as per the specifications and direction of EIC. The rates are payable over and above the Laying rates as per relevant SOR no. 1.1

-

-

-

... More
Cutting of PCC/RCC surface with thickness more than 12" or Continuous asphalt multi-layer/ Malba/ Brick / Boulders more than 24".(Malba shall be considered as a strata where soil is in mixed form of debris/building rubbish or discarded pieces of bricks/stones )

2

-

-

... More
Rock Cutting encountered while excavation of trenches for item 1.1 of SOR, not exceeding 1.5 meter in width, and lift upto 1.5 meter, including getting out the excavated soil and disposal of excavated soil as directed within a lead of 50 meter. In case of rocky soil, the bedding shall be done with approved/ good quality packing sand, subject to the approval of the EIC, the size distribution of the sand / shall be the same as per soil. The packing sand shall be placed to a minimum thickness of 150mm around the pipe in case of rocky terrain.

1

-

-

... More
Demolition of PCC work below plinth level

-

-

-

... More
Demolishing plain cement concrete (PCC) work (taking all necessary safety precautions) for all depths below plinth level including supply of all tools & tackles, necessary scaffolding, propping, underpinning, etc. , disposal of unserviceable material outside the boundary limits keeping the owner indemnified of any liabilities from statutory/ local bodies, all complete work as specified and directed

1

-

-

... More
Core Cutting of RCC structure/Brick Wall

8

-

-

... More
PNG Connection to Domestic Consumers

-

-

-

... More
Installation of GI Service Pipe

-

-

-

... More
Supply, loading, storing, unloading and installation of GI pipes, including supply of GI fittings/accessories including Anaconda, Fittings of all sizes & thickness like Elbows, Hex Nipple,Tees, unions, sockets, reducers, GI plugs,Sleeves etc., installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication with supply of all materials, consumables, labour and other incidental works. The scope of work excludes installation of Regulators (1/6 bar to 21 m bar with HEX nipple on inlet and outlet side of regulator) which shall be provided as free issue item. Carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings specifications.

-

-

-

... More
Scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works: Preparation and approval of schedules, execution procedures, sketches.

-

-

-

... More
Finalisation of optimum route with consent of customer, from transition fitting to cooking oven/ appliance.

-

-

-

... More
Making temporay but stable platforms/ scaffolding/ rope ladders and all other safety measures including safety belts wherever required.

-

-

-

... More
Installation of GI Pipes, Fittings, including NPT threading, painting as specified.

-

-

-

... More
Drillings of holes through walls (Brick, RCC), Granite, Marble, Glass Cutting with proper heavy duty hammer drill machine tools and tackeles, using proper sealent /grout materialed colors to match the original replacement of damages during drillling, restoring the area to original condition.

-

-

-

... More
Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through tiles/ wood/ marble/ Granite etc. jointing of PE to above Ground service GI pipes, testing, purging with Nitrogen and commissioning of the complete installation as per specification.

-

-

-

... More
Painting of entire length of pipe along with fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to origin.

-

-

-

... More
All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge.

-

-

-

... More
Handing over the completed works to CLIENT for operation/ use, reconciliation of material area wise and obtaining "no objection certificate" from CLIENT / PMC.

-

-

-

... More
Any other activity not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule time.

-

-

-

... More
all the entry of GI related work right from Registration till Gas charging/commission is to be mapped with GAIL GAS Shahaj app including uploading the documents which will be also used for certifying the measurement by PMC /GAIL GAS and keep track of activity of all the contractors , the entry of all the activity on day to day basis is also in the scope of bidder.

-

-

-

... More
½” All floors (Including connectivity from TF to regulator)- with supply of GI Pipes by Contractor

20314

-

-

... More
½” All floors (Including connectivity from TF to regulator)- with supply of GI Pipes by Owner on Free Issue Basis.

182820

-

-

... More
¾” All Floors (Including Installtion of Risers)- with supply of GI Pipes by Contractor

87

-

-

... More
¾” All Floors (Including Installtion of Risers) with supply of GI Pipes by Owner on Free Issue Basis

765

-

-

... More
1" Dia All Floors (For Riser Installtions & For Commercial Connections)- with supply of GI Pipes by Contractor

6

-

-

... More
1" Dia All Floors (For Riser Installtions & For Commercial Connections)- with supply of GI Pipes by Owner on Free Issue Basis

21

-

-

... More
Note:-

-

-

-

... More
i) Refer Particular Job Specification for supply items.

-

-

-

... More
ii) The quantity measurement shall be from the outlet of the Transition Fitting (TF) upto the Meter. All intermediate GI fittings (excluding Flexible hose/Anaconda, valves and regulator) shall be considered while measuring length of GI Pipes.

-

-

-

... More
iii) Supply and installation of isolation Ball Valves shall be paid as a separate SOR Item.

-

-

-

... More
iv) In case of SOR items b, d & f above (under SOR item No.- 7.1.1), owner shall supply Plain or Powder Coated GI Pipes (as free issue) remaining scope of supplies of fittings etc. including all associated works shall be as per item nos.-a, c & e (under SOR item No.- 7.1.1)

-

-

-

... More
Supply, Installation, Testing & Commissioning of Copper Service Pipes /Multi Layer Composite (MLC) Pipes

-

-

-

... More
Supply and installation of copper tubing as per MECON TS and associated fittings including brass fittings at the outlet of the meter and at the entry of appliance valve as per satisfaction of EIC. The copper tube and fittings shall be procured from approved vendors who have supplied these items for similar application earlier and with prior approved of Client / Consultant.

-

-

-

... More
Copper tube shall be installed from the downstream of meter upto the isolation valve before the customers' appliance as per requirement and to the satisfaction of EIC. The Contractor to provide all equipment, tools and material necessary to execute the work in an efficient manner by cutting, cleaning, flux application, soldering and lacquering. The work includes supply of all tools, tackles and consumables including clamps for fixing the tubes.

-

-

-

... More
12.0 mm OD x 0.6 mm wall thickness

16150

-

-

... More
Supply and installation of MLC Pipe as per ISO17484-1 latest standard and installation of Appliance Ball valves as per technical specification alogwith associated acessories/fittings including brass fittings at the outlet of the meter and at the entry of appliance valve as per satisfaction and instruction of EIC. The MLC Pipe and fittings shall be procured from approved vendors or from those vendors, who have supplied these items for similar application earlier and with prior approved of Owner / PMC.

-

-

-

... More
MLC Pipe shall be installed from the downstream of meter upto the isolation/ appliance valve before the customer's appliance as per requirement and to the satisfaction of EIC. The Contractor to provide all equipment, tools & tackles and asoociated material required necessary to execute the work in an efficient manner by cutting, cleaning, Bending, Fixing with clamp etc. The work includes supply of all tools, tackles and consumables including clamps for fixing the MLC pipe and restoration of the work area to the satisfaction of the customer.

-

-

-

... More
16.0 mm OD

850

-

-

... More
Note:

-

-

-

... More
i) Supply and installation of Appliance Ball Valves shall be paid as a separate SOR Item.

-

-

-

... More
ii) SOR item No.7.2.A & 7.2.B shall be carried out including supply of materials, only after getting instruction / approval from EIC.

-

-

-

... More
Installation of Meter, Flexible Hose & Conversion of Domestic Appliance:

-

-

-

... More
Installation & fixing of meters with associated inlet connections/ fittings, valves, approved meter brackets and other supports by proper scaffolding/ grouting, Restoring the area to original completre as per specification. (Meter and Regulator will be provided as as free issue Items)

17000

-

-

... More
Conversion of Domestic Appliance ,This works starts from outlet of meters which includes installation of GI pipe,Appliance valve etc & other supports by proper scaffolding/ grouting, Restoring the area to original completre as per specification. The work also includes installation and supply of Steel reinforced Flexible Hose as per IS 9573 (with Type as per lastest PNGRB guidelines) (Gas tube from end of Isolation Valve upto burner/stove) and conevrsion of all the burners of the LPG stove (one per household) including supply of all types of burner nozzles/jets and associated controls etc.

17000

-

-

... More
Cleaning and performing minor maintenance, greasing etc. of appliance, testing/ showing performance to the customer ,signing of Joint Meter Records (JMR) and instructing customer on use & safety norms, complete as per specifications & to satisfaction of customer

-

-

-

... More
Isolation Ball Valve And Appliance Valve

-

-

-

... More
Supply and installation of Isolation & Appliance Ball Valves as per Technical Specification and as directed by EIC

-

-

-

... More
Isolation Ball Valve 1/2 " max. 6 bar (g)

33915

-

-

... More
Isolation Ball Valve 3/4 " max. 6 bar (g)

85

-

-

... More
Isolation Ball Valve 1 " max. 6 bar (g)

34

-

-

... More
Appliance Ball Valve 1/2 " max. 35 mili Bar (g)

17000

-

-

... More
Testing,Commsioning & integration of previously laid GI /Copper Piping for PNG Connection:-

-

-

-

... More
Testing,Commsioning & integration of previously laid GI /Copper Piping network of various sizes having riser ,headers as well as laterals & outlet work (GI/Copper).Item include checking of the network by air pressure ,repair if any leakage observed and to make network ready for GAS-IN by providing manpower tools & tackles ,gasket etc. The total length of the network being tested shall be considered for payment . All sizes of GI network from 1/2" to 1" and Copper Outlet pipe. Note:- i) It includes any rectification,repair or replacement activities involving associated GI /CU fittings (as applicable) ,GI valve etc. and any other associated work required for completeness of PNG connections. ii) It may also be noted that in case of replacement of GI pipes ,same shall be payable as per SOR no. 7.1.1 (which includes required GI fitting for complete integration and in that case payment for the fiiting coming under the replaced length of GI pipe shall not be payble in SOR no. 7.5). iii) It may also be noted that in case of replacement of Cu tubes ,same shall be payable as per SOR no. 7.2.A (which includes required fitting for complete integration and in that case payment for the fiiting coming under the replaced length of Cu Tube shall not be payble in SOR no. 7.5)

-

-

-

... More
Testing,Commsioning & integration of previously laid GI Piping

2550

-

-

... More
Testing,Commsioning & integration of previously laid Copper Piping

85

-

-

... More
Regulator Boxes: Supply including painting of approved make regulator boxes and installing them firmly by grouting using approved bracket /clamps as per drawing enclosed & as per specifications and and cleaning the area complete to the satisfaction.

-

-

-

... More
Service Regulator Boxes: Supply and installation of Service Regulators Boxes as per drawing attached and as per directions of EIC.

26

-

-

... More
Domestic/Service Regulators :-Installation of all type of regulators at all floors of various capacity 2.5 to 65 SCMH with supply & fixing of associated inlet and outlet connections/ fittings,HEX nipple on inlet and outlet side of regulator,bracket and other supports with grouting as required ,by using proper scaffolding .Restoring the area to orginal completre as per specification.

-

-

-

... More
Domestic reulators -2.5 SCMH-100mbar to 21 mbar (supply of regulator and Adopter is free issue material)

2550

-

-

... More
Domestic reulators -2.5 and 6.5 SCMH regulators, -Pressure 4 bar to 21 mbar (only supply of regulator is free issue material)

14450

-

-

... More
Service Reulator (0.5 -6 bar to 100mbar)-10 SCMH to 65 SCMH capacity (only supply of regulator is free issue material)

74

-

-

... More
COMMERCIAL METER:- Installation & fixing of commercial meter alongwith box such as G4,G6,G10,G16 and G25 etc with associated inlet and outlet connection fittings,Meter brackets (if required) ,pipe supports etc,by using proper scaffolding .Restoring the area to original completre as per specification.Commercial Meter is a free issue material.

11

-

-

... More
COMMERCIAL REGULATOR:- Installation & fixing of commercial regulators(0.5-6 bar to 300/500mbar)-10 SCMH to 65 SCMH capacity with associated inlet and outlet connection fittings with required supports.Restoring the area to original completre as per specification.Commercial Regulator is a free issue material.

11

-

-

... More
Preservation of Pipeline

-

-

-

... More
Preservation of pipeline sections and associated facilities (in event of delay in comissioning, other unforeseen reasons) including supply of nitrogen, all consumables, all equipment, man-power, etc. complete as per the requirements of specifications, other provisions of Contract document and instructions of Engineer-in-charge.

-

-

-

... More
By filling and pressurizing with nitrogen to a pressure of 2 bar(g) for a period of one month or part thereof.

-

-

-

... More
For 32 mm Pipeline

2266

-

-

... More
For 20 mm Pipeline

55394

-

-

... More
For every additional period of one month or part thereof Limited to 6 month

-

-

-

... More
For 32 mm Pipeline

2266

-

-

... More
For 20 mm Pipeline

55394

-

-

... More
Notes: i) The above length is not for a single section but for no. of sections.

-

-

-

... More
ii) All accessrious ie; End caps and two nos tappings of 3/4 inches, PG to be considered per section and rate for the same shall be quoted by bidder under this item.

-

-

-

... More
iii) If month is partially complete, payment shall be made on prorata basis.

-

-

-

... More
iv) Scope includes pressure holding for a period of 6 months or as per EIC and jointing of PE pipe (if required) due to damage by any means and further filling of nitrogen for pressure holding.

-

-

-

... More
Registration of Domestic PNG Connections

-

-

-

... More
Assistance in carrying out the work of Domestic PNG registration as per directions/instructions of the Marketing In charge of CLIENT / Authorized representative including but not limited to following: 1) Enrolment & Registration of Domestic PNG Customers as per the given target. 2) Collection of filled up form along with Cheque/Demand Draft of Security Deposit amount and documents . 3) Registration document uploading on SAHAJ. 4) Submission of application along with SD Cheque/DD and all supporting documents All other activities as may be required to complete the work in all respect is defined in the Scope of work to be read along with the Special Conditions of Contract and as per instructions of MIC. Carrying out the marketing activities for Domestic PNG connection as detailed in Scope of work, complete in all respects, as per directions/instructions of the Marketing In Charge including but not limited to the following: Distribution of leaflets & FAQ, Installation of banners, to be provided by client, at prime location, Awareness cum Registration Camp, Audio / Visual Presentations, Organizing Road Shows, etc.

850

-

-

... More
Construction of RCC structure for protection of service line for drain/nallah Crossings

-

-

-

... More
Construction of Non suspended slabs/pavement slabs including pedestal/ramp etc.using reinforced cement concrete of M-25 grade (Concrete shall be design mix/nominal mix with 20 mm & down size graded crushed stone aggregates) to protect the PE pipe laid. All necessary form work, finishing the top surface rough/smooth as required in any position, shape, level and thickness etc. shall be as specified and directed by EIC. The rates shall include grouting of pockets, supply of all material, tools, reinforcement steel etc.

8

-

-

... More
Note:(i) The quantites of individual item can varied as per site requirement.The payment will be made as per actual certified measurement at site. For the supply items the quantities shall be procured after approval from client/ consultant/EIC.

-

-

-

... More
(ii) The bidder must indicate currency(ies) against each quoted item of the SOR.

-

-

-

... More
(iii) The total amount shall also be given by the bidder in the quoted currency(ies). (iv) Some of the may / may not be execute as per site requirements.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.