GAIL Gas Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
GAIL Gas Limited Tender
Telecommunication Services
Eprocure
Opening Date28 Feb 2024
Closing Date20 Mar 2024
Tender Amount₹ 16,01,50,000 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 32,03,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GAILG_187370_1Bid Award Id
ViewTender No
GAIL GAS/NOIDA/6180/NKG/2023-24/89Tender Authority
GAIL Gas Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Service for taking Daily Meter Readings for recording of meter reading/ EVC parameters of Industrial and Commercial Customers on daily basis, leakage testing/ visual inspection in MRS and reporting abnormalities (First Year)
[Bidders are not required to Quote against this Item and payments will be reimbursed as per the applicable clauses of SCC / SOW..]
12
-
-
Service for taking Daily Meter Readings for recording of meter reading/ EVC parameters of Industrial and Commercial Customers on daily basis, leakage testing/ visual inspection in MRS and reporting abnormalities (Second Year)
[Bidders are not required to Quote against this Item and payments will be reimbursed as per the applicable clauses of SCC / SOW.]
12
-
-
Service Charges for SOR Item No: 10 & 30 (For 1st Year). These service charges are against for providing services for SOR Item 10 & 30 and the Total Quantity of 12 has been considered accordingly for First years. [NEGATIVE NOT ALLOWED]
12
-
-
Service Charges for SOR item No: 20 & 40 (For Sencond Year). These service charges are against for providing services for SOR Item 20 & 40 and the Total Quantity of 12 has been considered accordingly for Second years. [NEGATIVE NOT ALLOWED]
12
-
-
O&M SERVICES / METERING SERVICES OF MEERUT CGD NETWORK
-
-
-
Materials charges as per SOW (including fixed charges for 3 nos. of GPS fitted vehicle for 1st year and 4 nos. of GPS fitted Vehicles for 2nd year and 2500 kms per month per vehicle of running charges, driver & a system for its tracking along with one set of DG Set, Consumables Tools & Tackles each for O&M Activites for each vehicle)
84
-
-
Extra Running Cost of vehicles for O&M Activities as per SOW
42000
-
-
Service for digging, backfilling and other similar jobs as and when required.
1600
-
-
STEEL PIPELINE LEAK REPAIR
-
-
-
The work include attending pipeline (Steel Pipeline dia 10 / 8 / 6 / 4 -inch) leak repair by sleeves welding at designated location/ sites including transportation of Sleeve, supply of manpower & machinery, excavation & backfilling, cutting, welding, grinding, beveling, surface preparation, leak testing, coating, holiday checking etc. to complete the work in all aspect as per GAIL Gas Laid Down procedure/SOPs & directions of E-I-C. (Sleeves to be supplied by GAIL Gas)(Standard Sleve length of 80 Cm has been assumed) (As per detailed Scope of Work) 10 / 8 / 6 / 4 -inch
4
-
-
SUPPLY OF PAINT AND PAINTING OF PIPING AND STRUCTURE.
-
-
-
As per Table in scope of work for above ground terminal piping, vessels, valves, structural steel pipe supports, walk ways, platforms, railings, fire water line etc. other equipment and as per various terms, specifications and conditions of the contract, after surface preparation after removal of loose paint / rust material if any with wire brush, emery paper, cleaning with lint free cloth including supply of all necessary paint materials, consumables, brushes, emery paper, tools, tackles, test & measuring instruments and related calibration accessories, support for carrying out the cleaning & painting work as per scope, specifications & special conditions of the contract at various sites . The item includes complete cost of paint removal (wherever required) surface preparation, repainting including material (paint, primer etc.), labour, transportation, and re-lettering/Marking on the pipelines/Structures as per the drawings issued and to the satisfaction of Engineer-in-Charge. (As per detailed Scope of Work)
-
-
-
Painting of Piping and Structure / Electrical Pole / Crash Barrier
3000
-
-
PAINTING OF CHAIN-LINK FENCING.
-
-
-
As per Table in scope of work for fencing/ Gate / Electric Pole, as per various terms, specifications and conditions of the contract, after surface preparation after removal of loose paint / rust material if any with wire brush, emery paper, cleaning with lint free cloth including supply of all necessary paint materials, consumables, brushes, emery paper, tools, tackles, test & measuring instruments and related calibration accessories, support for carrying out the cleaning & painting work as per scope, specifications & special conditions of the contract al various sites . The item includes complete cost of paint removal (wherever required) surface preparation, repainting including material (paint, primer etc.), labour, transportation, and re-lettering/Marking on the pipelines/Structures as per the drawings issued and to the satisfaction of Engineer-in-Charge. (As per detailed Scope of Work)
-
-
-
Painting of Wire mesh /Fencing
500
-
-
HIRING OF JCB
-
-
-
Provoding JCB for excavation/back filling (As per detailed Scope of Work)
100
-
-
HIRING OF HYDRA/CRANE (upto 15 Ton capacity)
-
-
-
Providing Hydra/Crane (As per detailed Scope of Work)
100
-
-
STEEL WORK
-
-
-
Fabrication and erection of steel work at site of built up stations in RS joist i.e. Angle, Channels, Tees, Pipes, Flate, I-beams, Chequered plate, Sheets etc. for cross over platforms, boards, gate, fencing post, stands and similar structures etc. including cutting, welding & fixing in position at site as per scope of work and directions of engineer in charge. (As per detailed Scope of Work). The item includes complete cost of material , labour, transportation ,installation & erection as per the drawings issued and to the satisfaction of Engineer-in-Charge. (As per detailed Scope of Work)
-
-
-
Fabrication and errection of Steel work
5000
-
-
FILLING WITH SAND/CEMENT BAG
-
-
-
Filling up of washout trenches with sand, cement bags as per site requirements. Item includes providing of gunny bags, cement, sand etc, dry mixing of cement and sand in 1 cement: 10 sand proportion, filling of the bags, stitching/sewing of bags with nylon thread, placing of the bags in the washout trenches in specified layers as per site requirements/ instructions of EIC. ( approx. 28 Nos. of bags will be required to be laid for one Cu. mtr of volume )The item shall be paid as per compacted volume measured at site. Item include cost of the material, transportation, manpower, royalty etc. complete in all respect. (As per detailed Scope of Work)
-
-
-
Filling with Gunny Bags ,Sand and Cement.
20
-
-
PIPELINE MARKER AND REPAIR
-
-
-
Supply and Installation of warning sign
200
-
-
Supply and Installation of RCC markers
3000
-
-
Repair and Painting of Warning sign
350
-
-
Repair and Painting of RCC Markers
200
-
-
VALVE CHAMBER (STEEL AND MDPE PIPELINE)
-
-
-
Maintenance of Steel or MDPE line Valve chamber -Removal of all foreign materials like grass, vegetation, garbage, water (by arranging dewatering pump if required), seewage etc. Pest control Treatment in valve chamber such as Limestone powder etc. Checking of Valve Operatibily & greasing. Painting of Valve and Chamber Cover. (average no. of valves considered calculated by considering 400 Kms length of p/l, valve at every 3 km & servicing of each valve two times a year)
3000
-
-
Construction of pipeline Valve chamber (as per indicative drawing attached in the tender) - (RCC )
30
-
-
Construction of pipeline Valve chamber (as per indicative drawing attached in the tender) - (Brick)
5
-
-
Repair/ Modification in size, increase/ decrease of height of valve chamber - RCC Type
30
-
-
Repair/ Modification in size, increase/ decrease of height of valve chamber - Brick Type
45
-
-
Fabrication of fresh top RCC slab along with manhole cover of all type & sizes of valve chambers - for RCC and Brick Type
250
-
-
Providing manhole cover of valve chamber (only in case where monahole cover is damaged/ lost)
50
-
-
Preventive Maintenance of the Valve Chambers (steel Pipeline / MDPE Pipeline) as per the scope of work given in the tender document.
2120
-
-
METER REGULATING SKID (MRS) / DISTRICT REGULATING SKID (DRS)
-
-
-
Preventive maintenance of the MRS / DRS skids as per the defined scope of work
120
-
-
DPNG CUSTOMER LEAK CHECK AS PER PNGRB REQUIREMENT
-
-
-
Leak Check of the DPNG connections in the GA (Inside the house / flat premises) as per the PNGRB requirement / getting the signature from the resident / their representative. All consumables are inclusive in the quoted rate. The deffective material such as Anaconda Pipe / Appliance Valve / Isolation valve / Flexible Rubber Hose if required shall be paid seperately under differenct SOR Items (however the human resources required for replacement of the deffective items are inclusive in the quoted rate of the instant SOR.
100000
-
-
GI INSTALLATION SERVICES
-
-
-
Supply and installation of 1/2" GI pipe & associated fittings (like elbows, Tees, Unions, Sockets, Reducers, Sleeves, Plugs, Caps etc) supply and installation using fresh/ new pipes and fittings including testing and commissioning
50
-
-
Installation of 1/2 " GI Pipes Supplied by GAIL Gas and fittings (like elbows, Tees, Unions, Sockets, Reducers, Sleeves, Plugs, Caps etc) to be supplied by contractor as required including testing and commissioning
40
-
-
Supply and installation of 3/4" GI pipe & associated fittings (like elbows, Tees, Unions, Sockets, Reducers, Sleeves, Plugs, Caps etc) supply and installation using fresh/ new pipes and fittings including testing and commissioning
450
-
-
Installation of 3/4 " GI Pipes Supplied by GAIL Gas and fittings (like elbows, Tees, Unions, Sockets, Reducers, Sleeves, Plugs, Caps etc) to be supplied by contractor as required including testing and commissioning
360
-
-
Copper pipe supply and installation including testing and commissioning
200
-
-
Replacement of SS 316 anaconda pipe
200
-
-
Replacement of Brass Adaptor/ Connector
100
-
-
MOLING
-
-
-
The Moling shall be carried out as per the requirement specified by Client, and approved procedures. The contractor has to carry out through survey of the underground utilities before going for the Moling, to avoid the damage to the other utilities. No extra payment will be made for any trial/ abandoned pits made during the survey. The supply of all equipment, power required for carrying out moling work, is in contractor’s scope. The type of moling to be carried out i.e., Manual/Machine with or without casing shall be at the discretion of Client. A prior approval is to be taken before starting the Moling.
For manual Moling the contractor shall ensure that the size of the hole shall not be more than 20% of the size of the casing / carrier pipe whichever is applicable. After completion of Manual Moling the hole shall be properly compacted / filled with soil by watering and by approved procedures, the pits shall be backfilled, compacted & restored. The rate for such crossing work by using casing pipe & carrier pipe or only carrier pipe shall be payable as per Schedule of Rates. No separate payment shall be made for pulling the carrier pipe.
The rates for Moling, as indicated in SOR, are payable as per the size of the casing/carrier pipe and are inclusive of excavation of pits, backfilling, compaction, restoration, jointing and insertion of carrier pipe.
Any damages occurred to other utilities during the Moling operation shall be immediately notified and rectified by the contractor without any cost implication to Client. The length of the Hole (excluding the sizes of the pits on both ends) shall be considered for the measurement of Moling length. However, intermediate pits will consider in the moling length
-
-
-
Upto 32 mm
500
-
-
32 mm to 125 mm
500
-
-
Services for laying of Paver Blocks
-
-
-
Paver block
5
-
-
SUPPLY OF SADDLES, FITTINGS, COUPLERS, TEES REQUIRED IN MDPE PIPELINE (PE 100 GRADE) from MECON approved reputed manufacturers.
-
-
-
MDPE Coupler 32 mm
1500
-
-
MDPE Coupler 20 mm
1500
-
-
MDPE Coupler 63 mm
1000
-
-
MDPE Coupler 125 mm
500
-
-
MDPE Equal Tee 32 mm
1000
-
-
MDPE Equal Tee 20 mm
500
-
-
MDPE Equal Tee 63 mm
500
-
-
MDPE Equal Tee 125 mm
100
-
-
MDPE Elbow 125 mm* 90 degree
100
-
-
MDPE Elbow 125mm * 45 degree
100
-
-
MDPE Elbow 63 mm* 90 degree
500
-
-
MDPE Elbow 63mm * 45 degree
500
-
-
MDPE Elbow 32 mm* 90 degree
100
-
-
MDPE Tap Saddle 125*63 mm
100
-
-
MDPE Tap Saddle 125*32 mm
100
-
-
MDPE Tap Saddle 63*32 mm
100
-
-
MDPE Tap Saddle 63*20 mm
50
-
-
MDPE Tap Saddle 32*20 mm
300
-
-
MDPE TF 32 mm*3/4"
100
-
-
MDPE TF 32 mm*1"
100
-
-
MDPE TF 20 mm*1/2"
200
-
-
MDPE Tee 125mm * 63 mm
100
-
-
MDPE Reducer 125 mm* 63 mm
300
-
-
MDPE End Cap 125 mm
200
-
-
MDPE Tee 63 mm * 32 mm
500
-
-
MDPE End Cap 63 mm
200
-
-
MDPE Reducer 63 mm* 32 mm
500
-
-
MDPE Reducer 32 mm* 20 mm
1500
-
-
MDPE End Cap 32 mm
1500
-
-
MDPE TF 20 mm*3/4"
200
-
-
MDPE End Cap 20 mm
2000
-
-
MDPE Reducer 180 mm* 125 mm
50
-
-
MDPE Tee 180 mm * 125 mm
50
-
-
MDPE End Cap 180 mm
10
-
-
MDPE Tap Saddle 125 mm
50
-
-
MDPE Tap Saddle 63 mm
50
-
-
MDPE Tee 32 mm * 20 mm
500
-
-
MDPE Coupler 180 mm
5
-
-
MDPE Equal Tee 180 mm
2
-
-
MDPE Tee 125*32 mm
2
-
-
SUPPLY OF OTHER MISCELLANEOUS ITEMS
-
-
-
Anaconda (One end Male 3/4" and other female 3/4")
5000
-
-
Appliance Valve 1/2"
1000
-
-
Isolation valve 1/2"
5000
-
-
Isolation valve 3/4"
1000
-
-
ULTRASONIC THICKNESS MEASUREMENT
-
-
-
ULTRASONIC THICKNESS MEASUREMENT OF ABOVE GROUND STEEL PIPELINES OF CNG STATIONS/DRS/MRS/CGD NETWORK. Each No. shall be comprising of 4 point checking at 90/180/270 & 360 deg positions along the peripheri of that location.
10880
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements