DMIC Integrated Industrial Township Greater Noida Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

DMIC Integrated Industrial Township Greater Noida Limited Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date1 Nov 2024
Closing Date30 Nov 2024
Tender Amount₹ 7,71,00,625 
Notes
Download

Costs

Summary

Construction Of Boundary Wall Around Mmth Project Gr. Noida

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 and for all lift.

10573.39

149

1580193.14

... More
Extra for every additional lift of 1.5 m or part there of in excavation I banking excavated or stacked materials.

742.64

96

71798.44

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources :8 graded stone aggregate 40 mm nominal size derived from natural sources)

496.34

5193

2577985

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)

100.35

6359

638195.9

... More
Laying and Jointing PVC Pipe. Heading

-

-

-

... More
Design, Supply, fabrication, transportation, erection and fixing in position of 3000mm high Boundary Wall from NGL, minimum 75mm thickness & 3000mm length. Consisting of RCC Precast Concrete post of size minimum 300 x 300 x 4000mm height including R.C.C Precast foundation as per approved design. Precast post having two grooves so as to receive Precast Panel. Precast concrete panels width minimum 1500mm.The work shall be started after it is duly approved by Engineer-in-Charge/ Client’s representative. The post with R.C.C precast foundation shall be erected in place on levelled PCC base. The post will be erected @ 3200 mm c/c. The rate shall include all material, labour, taxes, tools, transportation, including MS welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works refer Drg. EIUD1UP005-MMTH-BW-001_Typ.02. complete all as per the direction of engineer-in-charge/Client's representative. (Note : The tender is formulated for all precast components to be "Designed, manufactured and put in place to withstand all necessary loads for a life span of 50 years as per CPWD specification by the contractor" The contractor will ensure that the design of all precast components shall be duly vetted from IIT and approved by DMIC-IITGNL before execution.)

4863

14068

68416039.47

... More
Barbed Wire Fencing Work

-

-

-

... More
Supplying at site R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in charge (cost of earth works in excavation, concrete works in foundation to be paid separately).

42.93

25078

1076631.6

... More
Supplying and fixing turn buckles and straining bolts for barbed wire fencing.

1093.88

209

228785

... More
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire

30967.3

10

330421.09

... More
Providing and fixing of barbed wire fencing with existing angle iron post. Barbed wire with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.

24315

16

392930.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.