If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date24 Sep 2024
Closing Date4 Oct 2024
Tender Amount₹ 26,53,447
Costs
EMD
₹ 79,603Document Cost
₹ 1,357Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_957558_242Bid Award Id
ViewTender No
025/Nirman/2024-25 Date 19.09.2024Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
deduct old tiles etc
8936.48
-53618
-6
... More
concrete with 4cm gauge brick ballast fine sand of 1.25 FM and cement in proportion of 1:6:12 in foundation and under floor including supply of all material labour tools & plant etc
16.27
65080
4000
... More
R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour,tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge.(AS PER PWD SOR 2020/283 a .)
36.41
314582
8640
... More
Steel reinforcement for R.C.C work including straightening ,cutting ,bending, placing in position and binding all complete upto plinth level mild steel and medium tensile steel bars DSR 2023 ITEM N.5.22,1
22.87
186756
8166
... More
S/L of stone ballast 22.4 to 53 mm size with stacking for measurment etc all complete as per the direction of engineer in-charge . AS PER PWD SOR 2020 RMR
98.21
211271
2151.2
... More
Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper 12 grade and camber, applying and brooming, crushable
98.21
67767
690
... More
Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix
161.89
1303214
8050
... More
GST
18
404763
2248684.15