Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Eprocure
Opening Date9 Jul 2024
Closing Date15 Jul 2024
Tender Amount₹ 8,46,771 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing of 32H.P. Disiel Pump Set for dewatering of pond with pump operator and fuel charges etc all complete. (For 8 Hours)

5

10500

2100

... More
Removal of Silt for Nala/Nali in liquid mud or faul position with special T&P including lead 30m and lift up to 3.00m etc. all complete. (As per Attached sanctioned rate analysis)

18

4302

239

... More
Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter S.I.NO.- 251)

58.5

8482

145

... More
Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (Chapter No.3 Si.No.8)

59.4

13667

230.1

... More
Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 brick ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter PWD.SCH.-274)

18.6

97650

5250

... More
R.c.c work with cement approved coarse sand and 4cm gauge approved stone ballast in the proportion 1:2:4 (One part of Cement, 2 part of Coarse sand and 4 part of 4cm. stone grit) in R.CC Raft Foundation and Footing 4cm. Gauge approved stone ballast excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 bwgi binding wire and including necessary centring and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150 grade. (5-Chapter S.I.No.287)

22.32

156240

7000

... More
R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1: 1½: 3 in (One part of Cement, 1½ part of Coarse sand and 3 part of 2cm. Stone Grit) Wall/R.CC Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGI binding wire and including necessary centring and shuttering etc. And also including supply of all materials labour and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-200 grade. (5-Chapter PWD SCH.No.289.1)

36.45

300712

8250

... More
R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 in R.C.C Slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 bwgi binding wire and including necessary centring and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150. (5-Chapter S.I. No.-284)

1.08

8262

7650

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor. (Chapter No. 10 S.I. No. 504(B))

28.19

239615

8500

... More
Supply & Fixing Granite Stone Work Display Board (Size 2.50ft x 4.00ft) including Painting, Lettering etc. all complete. (None Schedule)

1

10000

10000

... More
Sub Total (A)

1

865982

1

... More
Deduction Cost of Material Old workable bricks etc. all complete.

2031

12592

6.2

... More
Diduction of cost brick/bats. (Chapter No.1 Sr.No.2(c))

6.62

6620

1000

... More
Sub Total (A)

1

19212

1

... More
Sub Total (A-B)

1

846770

1

... More
Add/Deduction Rs. For Estimate Figure Amount Match

1

-

0.26

... More
Grand Total

1

846771

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.