Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date21 Nov 2024
Closing Soon29 Nov 2024
Tender Amount₹ 6,93,938 
Notes
Download

Costs

Summary

Ward 25 Bada Bazar Construction Of Rcc Drain

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ded the cost of old bricks/batts

3.12

600

-1872

... More
Cleaning of silt/sludge in foul condition lift upto 30m distance etc all completed as per direction of engineer in charge

14.84

112

1669.5

... More
Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50M and lead upto 30M and including filling watering and ramming of excavatd earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge upto a distacnce or 30M from the foundation trenches. (where machine can not move) deduct The qty of item no-05

14.11

90

1269.9

... More
Disposal of malba up to 8.00m from site including etc. all complete work.

12.72

230

2926.87

... More
Dewatering/Diversion of water by diesal engine pump incuding opretor fuel required length of flexible pipe for proper disposel of water etc. all.

16

600

9600

... More
Cement concrete with 4cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 incuding supply of all materilas labour t&p etc required for proper completion of the work.

13.04

4850

63244

... More
RCC work with cement approved coarse sand and 2cm gauge stone grit in proportions of 1:1.5:3 in slab wall etc excluding supply of reinforcement and its bending but including its fixing and binding the same with 24BWG GI binding wire and including neccessary centering and shuttering etc and supply of all materials labour and tool & plants etc required for proper completion of the work including cost of binding wire the rate excludes makings of drip course wihch shall be paid extra.

36.55

7400

270470

... More
MS (tor or plain) plain work such as rcc or rb work including bending for proper shape and including supply of steel and its wastage bend. Hooks and authorised overlapping shall be measured and including cost of binding wire wastage including supply of all labour material t&p etc required for proper completion of the work

20.08

7901

158668.14

... More
Cement concrete with 2cm gauge approved stone grit coarse sand & cement in the proportion of 4:2:1 including supply of all materials labour t&p etc required for proper completion of the work.

6.45

5750

37087.5

... More
S/F of inauguration board……etc with ac

1

5000

5000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.