Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date13 Mar 2024
Closing Date18 Mar 2024
Tender Amount₹ 14,00,000
Costs
EMD
₹ 1,11,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
Laying Of 300 Mm Dia Sewer Line At Saint Kaitharin Hospital 200 Mtr
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_916199_1Tender No
Jal/2795 / Zone 1/ Saint Kaitharin Hospital Ward 76 / 200 mTender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
b 1.5m to 3.0m B.G.L.
144
41166
285.88
Provide and fix close timbering in trenches for the depth as specified below G.L. consisting of 40 mm thick approved country wood plank for polling board 125 x 75 mm Indian Sal Wood wallers and 100 mm dia sal wood ballies for shuttering at 1.5 m C/C including all labour etc, complete (b) 1.5m to 3.0m B.G.L
400
30560
76.4
Supply of following sizes of RCC (NP3) spigotted and socketed non pressure pipes( Dia. In mm). C.P.W.D D .S.R
200
210000
1050
Carting following sizes of R.C.C. Hume pipe NP3. Class Socket/ spigoted rubber ring jointing and specials from store to the work lowering the same in to the trenches upto depth as specified below G.L. true to alignment including excavation of earth below invert level of pipe, cost of all jointing material, testing etc. complete but excluding excavation and and refilling of trenches from ground level to the invert level of pipe. including supply of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer incharge. 300 mm dia. (a) (c) 3.0m to 4.5m B.G.L.
200
105160
525.8
Plain Cement concrete work for bedding below G.L. at spcified depth with cement, coarse sand and 20 mm gauge approved stone ballast (1:6:12) including supply of all materials, labour, T&P etc. required for the proper completion of work. (As per direction of Engineer -in-charge.) (a) PCC for pipe bedding
5.45
40617
7447.26
Construction of circular brick work manhole chamber in 1st class brick work with 1:4 cement & coarse including supply all materials, labour, T&P etc. required for the proper completion of work as per direction of Engineer -in-charge. (a) b-type Manhole 1200 mm dia depth 2.01m to 2.3m.
11
347402
31582
Provide necessary fuel, labour T&P etc. required for proper running of well point equipment of required for lowering the water table during excavation and laying of sewers (well point equipment depreciation not considered)Assume well point equipment will run 24 hours and 100m length of sewer will be laid per week i.e. in 5 days. (This item shall be executed when water is encountered during excavation of trenches only.)
4
7428
1857
Making sewer line connection etc all complete.
1
15000
15000
Road reinstatement of cement concrete Road with PCC in ratio of 1:4:8 incuding supply of all material labour etc com. A) Bituminous road
180
288360
1602
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements