Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date21 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 2,84,74,216 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
P.C.C (1:5:10) Works Providing and laying Cement Concrete in 1:5:10 (1 cement : 5 fine sand 10 brick ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (Chapter-5, S.I.NO. -4.1.8)

23.64

124110

5250

... More
R.C.C. FOOTING (M25) R.C.C. work with cement approved coarse sand and 4 cm gauge approved stone ballast in the proportion 1:2:4 (One part of Cement, 1.5 part of Coarse sand and 3part of 4 cm stone grit) in RCC Raft Foundation and footing 4 cm. Gauge Approved stone ballast excluding supply of reinforcement and its bending but including its fixing and including necessary centering and shuttering etc. Required for proper completion of the the work. Strength of the concrete shall not be less than M-150 graze. (5-Chapter, S.I.No. 5.2.2)

47

329000

7000

... More
R.C.C. COLUMN (M25) RCC work with cement approved coarse sand and 2 cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 in (One part of cement,1.5 part of coarse sand and 3 part of 2cm Stone Grit) Wall/RCC Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGI binding wire and including neccessary centering and shutteringetc. And also including Supply of all materials labour and tools and plants etc. Strength of the concrete shall not be less than M-25 grade. (5-Chapter PWD S.I.No.5.2.2)

49.11

432168

8800

... More
STEEL REINFORCEMENT Providing and fixing in position Fe 500 steel reinforcement of various diameter confirming to relevant IS code in R.C.C. works including straightening, cutting, bending, binding with 20 SWG annealed wire for tying the reinforcement bars at each junctions (binding wire shall not be measured separately) including all waste and cut pieces, provision for adequate numbers of spacers, chairs, providing and placing cement mortar (1:1) cover blocks to keep the bars in intended position at all levels all complete as per drawings, specifications and instructions of the Engineer. (Authorized lap length and for the bar length exceeding 10 meter in length shall be measured for the payment). (Chapter No-10, S.I. No-504 Analysis Rate)

73.67

626195

8500

... More
BRICK WORKS (1:4) Class-150 brickwork in 1:4 Cement and coarse sand, mortar in foundation and plinth including supply of all materials, labours and tools and plants, etc. Required for proper completion of work. ( Chapter No. 6, S.I No. 6.1.1A & 6.8A)

20.15

112840

5600

... More
DAMP PROOF COURSE Providing and laying D.P.C 2.50 cm thick with Cement concrete Consisting of One Part Cement 1.5 part of Coarse Sand and three part of approved 10 mm graded Stone grit and including water proofing martreial as approved by the Engineer-In Charge in the proportion as specified by manufacturer. (Chapter-7, S.I.No. 4.1.3)

34.84

7839

225

... More
ANTI TERMITE TREATMENT Antitermite treatment of soil under floors using chemical emulsion @ one litre per hole, 300 mm apart @100 Nos Holes per 9.00 Sqm. including drilling 12 mm diameter holes and plugging also to match the floor properly : With Chlorpyriphos / Lindane E.C. 20% with 1 % concentration (Chapter-8, New)

8

1800

225

... More
Inner Wall (1:4) 12 mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering upto floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and (c) 1 Cement: 4 Coarse Sand. (Chapter No. 13. S.I. No-13.4.1)

43.68

8299

190

... More
External wall (1:4) 12 mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering upto floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and (c) 1 Cement: 4 Coarse Sand. (Chapter No. 13. S.I. No-13.4.1)

166.26

31589

190

... More
WALL PUTTY INT. EXT Finishing walls putty approved brand and manufacture and of required shade and undecorated wall surface to give and even shade over and including curing and cost of all materials. (Chapter No. 15. S.I. No-13.45.1)

209.94

15745

75

... More
INTERNAL PAINT Finishing walls with deluxe mulitsurface paint @1.25 Ltr. per 10 Sqm of approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work.for two coat.over one coat of primer applied 0.75Ltr per 10 Sqm. (Chapter No. 15. S.I. No-13.48.1)

43.68

3363

77

... More
EXTERIOR WEATHER COAT PAINT Finishing walls with textured exterior paint @3.28 leter per 105cm of approved brand and manufacture and of required shade on undaccrated wall surface to give even shade over including cutting and cost of material labour T&P etc. required for proper completion of work for two coat over one coat of primer applied 2.20ltr 10sqm. (Chapter No. 15. S.I. No-13.45.1)

166.26

29926

180

... More
TERRACING Providing and laying"brick coba"12 mm thick laid with M-150 class brick bat coba 7.50cm thick with gap of 15mm to each other, over 20mm thick base of cement mortar 1:4 cement and coarse sand mixed with water proofing compound spreding cement slurry mixed with acrelic cement concrete water proofing compound filled gaps of coba & top of coba mortar mixed with water proofing compound in 1:4 cement and coarse sand mortar finished smooth & top mashed false square 30cmX30cm and side wall parapet shall be mono tythic plaster wall upto 30cm higher and junction and corner shall be rounded by brick ballast cement and coarse sand masonary coba with top finished plaster mixed with acetic water proofing compound @ 2% by weight & including supply of all material, labour, T&P etc complete for proper completion of work.

10.73

10730

1000

... More
DOOR FRAME Sal wood wrought framed and fixed including simple mouldings, straight works as in Chaukhats, including supply of all materials, labour and T&P etc. required for proper completion of work.

0.09

6750

75000

... More
WINDOW FRAME Indian saal wood wrought framed and fixed including simple mouldings, straight works as in Chaukhats, including supply of all materials, labour and T&P etc. required for proper completion of work.

0.11

8250

75000

... More
DOOR SHUTTERS Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1 st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters. including ISI marked Stainless Steel butt hinges with necessary screws, Steel Handels, Siliding bolt, Door Stopper and tower bolt.(35 MM thick)

4.8

8160

1700

... More
WINDOWS SHUTTERS FRAME Indian saal wood wrought framed and fixed including simple mouldings, straight works as in Chaukhats, including supply of all materials, labour and T&P etc. required for proper completion of work.

0.11

8250

75000

... More
WINDOWS GLASS (4 MM) Additional cost for fixing glass panels with C.P.Teakwood beading and felt as directed by Engineer-in-charge instead of putty and brad including cost of all materials, labour and T&P etc. required for proper completion of work. and T&P etc. required for proper com

2.26

1695

750

... More
FLOORING 100 mm thick Trimix flooring with M25 concrete in pannels, not more than 50 sqm in planReinforcement steel to be laid 10 @ 150 c/c in both the direction (paid in separate item ). Groove to be cut at all junction 20 mm deep and 10 mm wide and fill with bitumen etc complete (AR)

168.71

1383422

8200

... More
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) :25 mm thick (Chapter 14: Sl No: 11.26)

10.58

14283

1350

... More
FOOTPATH Supply & laying of I shaped precast interlocking tiles of thickness of 80 mm (compressive strength not less than 30 Mpa and weight 4.5kg) Including 25 mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work.

68

56712

834

... More
CCTV Surveillance (as per quotation) including installation and supply.

1

125000

125000

... More
Mechanised hydraulic parking (as per quotation) including installation and supply.

20

13924000

696200

... More
Car parking management system Entry Terminal - Autoamtic Ticket dispenser with Malfare Card Reader & Single Colour Digital LED Display screen. Thermal printing technology with 80mm paper width, capable to Offline mode. Make- Arete

1

495600

495600

... More
Car parking management system Barrier- Automatic High Speed Barrier, 1.3 sec. opening/closing time with 4.5 mtr staright arm, electro-mechenical, brushes DC motor, 24VDC, Max. power consumption 95W. Inbuilt loop detector.

2

446200

223100

... More
Car parking management system Manual Pay Station Touch POS with Barcode scanner, receipt printer, cash drawer and customer fee display with control module.

1

455786

455786

... More
Car parking management system Server & Software- Database system with SQL 2016 or above server, inbuilt window WINOP with VMS module, Web services - Cash point, sales.

1

1250000

1250000

... More
Car parking management system Installation, Testing & Commissioning Charges (Excluding Civil, Electrical & Networking)

1

450000

450000

... More
Fire Fighting FIRE EXTINGUISHER ABC 6KG

6

19200

3200

... More
Electrical Work: Electric panel

1

220000

220000

... More
Electrical Work: Armoured cable 5 core 2.5 sq.mm. Connection to all parking equipments.

1064

150024

141

... More
Electrical Work: Guard room light, fans, switch and sockets

2

15000

7500

... More
Electrical Work: Copper earthing

4

100000

25000

... More
Electrical Work: Diesel Generator set 35 kva 3 phase with canopy

1

450000

450000

... More
9 Mtr. G.I. Minimast: Supply & fixing of 9mtr.GI Octagonal pole of approved make (top dia 70mm, Bottom dia 155mm and base plate 12mm thick) having 3mm thickness with single arm bracket (1mtr length) on RCC foundation including the cost of foundation, foundation volts, excavation & back filling and required T&P complete in all respect, (S) No. 645 PWD Schedule2018)

1

20890

20890

... More
9 Mtr. G.I. Minimast: S/F of angle iron frame fabricated as per design approved of angle iron size 40mmx40mm for fixing 4 to 6 flood light complete in all respect including welding labour charge T&P etc.

1

1677

1677.5

... More
9 Mtr. G.I. Minimast: Supply and laying of 10sqmm 2 core aluminium conductor PVC insulated armoured served sheathed cable 1100 volts grade at a depth of 750mm below ground level over a cushion of 75mm thivk sand all around protected with burnt bricks on sides and on top. On size or as directed by the engineer-incharge complete in all respect. the armouring of the cable shall be properly connected with the earth conductor by clamps etc, (SI No, 501(B) PWD shedule 2018)

50

14600

292

... More
9 Mtr. G.I. Minimast: Supply and fixing of factory wired integral LED flood light luminaries with die cast aluminium housing built with driver set suitable for 140w. To 150w. Confirming to IP 55 protection complete in all respect. CAT AAA (S.I. No. 1454 PWD Schedule 2018

4

52760

13190

... More
9 Mtr. G.I. Minimast: Supply and buying of 600mmX600mm G.I. Plate vertically for earthing with its top at least 3 meters below ground level complete with 20mm dia. G.I. pipe and funnel for watering and one earthing lead of one no. 8 to 10 SWG. G.I. wire will be extra 30mm square CI frame with hinged cover masonary housing housing alternate layers of charcoal/ coke and salt atleast 150 mm thick alround etc. as per directions of engineer-in-charge complete in all respects as per drawing (This will apply for earthing of poles also) (S.I. No-702 PWD Schedule - 2018)

1

5350

5350

... More
9 Mtr. G.I. Minimast: Supply and fixing 25A SPN following capacity of automatic street light cubicle control panel painted with anticorrosive alkali or astronomical programmable timer switch. Enclose in Suitable size mild steel box , having bypass switch and 20-32 Amp. contactoe and required MCB etc. acid proof paint consisting of time switch TSO 100 series with contacors, HRC fuses, isolating switch metering instrument & instrument box with CTs etc. in case of TPN, Complete in all respect. (S.I. No. 807 B(2)PWD Schedule 2018)

1

17800

17800

... More
9 Mtr. G.I. Minimast: Supply & fixing of radium strip on pole at midnight. Patti size 2" with color red white yellow.

7

1400

200

... More
9 Mtr. G.I. Minimast: Supply and laying & burying of PN-6 PE-63 grade 3.50 mm dia 4mm thick high density polyethylene pipe with silicon coating as per IS-4984 & manufactured by ISO-Certified firm in center channel divider complete in all respect (as ADA rate). (HDC pipe)

50

5000

100

... More
9 Mtr. G.I. Minimast: Supply and wiring of submains with two nos. of 2.5 sq.mm. FRISH PVC insulated 1100 V grade single core multistrand copper conductor cable in existing conduit complete with supply of all material labour and T&P required for proper completion of the work as directed at site by engineer in charge. (S.I. No- 289 PWD Schedule 2018)

30

1650

55

... More
9 Mtr. G.I. Minimast: Supply & fixing of 6 Amp to 32 Amp. SPMCB (10 KA) C Curve (S.I. No. 1002 CAT B) PWD Schedule 2018)

2

412

206

... More
Torrent

1

1200000

1200000

... More
Sub Total (A)

1

22661504

1

... More
Architect/Consultant Fees @ 1.15% (B)

1

260607

1

... More
Sub Total (A+B) = (C)

1

22922111

1

... More
Annual Maintenance Contract (AMC) of Equipments for Two Years: AMC of Mechanised hydraulic parking (1 year included in contract), for 1 year (10% of contract value of equipment with 10% year on year increment.) 1st year - in contract, 2nd year - 69620

20

1392400

69620

... More
Annual Maintenance Contract (AMC) of Equipments for Two Years: AMC of Mechanised boom barrier (1 year included in contract), for 1 year (10% of contract value of equipment with 10% year on year increment.) 1st year - in contract, 2nd year - 22310

2

44620

22310

... More
Operation and Maintenance: Operator cum Driver (3 for each shift) 13183.44 (minimum wage = 11316.16, contractor profit 5% = 565.80 & P.F. = 735.54) per person per month for 2 years

9

1423811

158201.28

... More
Operation and Maintenance: Technician (per annum) 40000 per person per month for 2 years

1

960000

960000

... More
Operation and Maintenance: Janitor (1 for each shift) (per annum) 10700 (minimum wage = 9184, contractor profit 5% = 459.20 & P.F. = 596.96 per person per month for 2 years)

3

770400

256800

... More
Operation and Maintenance: Electricity consumption

24

960000

40000

... More
Sub Total (D)

1

5551231

1

... More
Sub Total (C+D) = (E)

1

28473342

1

... More
Add / Deduction For Estimate Figure Amount Match

1

873

873.07

... More
Grand Total

1

28474216

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.