Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies Tender
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date6 Mar 2024
Closing Date11 Mar 2024
Tender Amount₹ 33,20,000
Costs
EMD
₹ 3,32,000Document Cost
₹ 3,894Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_911499_1Bid Award Id
ViewTender No
316/Tender Notice/2023-24 DATED 02.03.2024Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
As in item (283) above but in RCC raft foundation and footing with 4cm (11/2'') gauge approved stone ballast.
45.36
244944
5400
... More
As in item (283) above but in RCC columns in 1.1.5.3
30.9
225570
7300
... More
As in item (283) above but in the lighter beams i.e having spans upto 6 meters (20).
40.05
268335
6700
... More
Providing and injecting chemical emulsion for pre-constructional antitermite treatment and creating and chamical bariier under and arround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the external perimeter of binding expansion joints, surrounding of pipes and conduit etc. complete (plinth area of the building at ground floor only shall be measured as per I.S. 6313 (Part II 1981) approved material such as Hepthachlor or chlordane will be used. The rate of application of chemical emulsion shall be as follows.
600
87000
145
... More
Class-150 brick work in 1:6 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. (as per S.I. No. 303)
8.69
46057
5300
... More
As in item (309) above but walls of one brick thick add for extra labour to the rate of item (309)
3.1
17112
5520
... More
Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. (as per S.I. No. 504)
114
638400
5600
... More
12mm thick plaster with cement and fine sand in 1:4 including supply of all materials, labour and T&P etc. required for proper completion of the work (S.I.No. 584)
117
15795
135
... More
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.
719
45297
63
... More
2.5 cm (1") thick 1:2:4 plain cement concrete floor with cement approved coarse sand and 2cm (3/4") graded approved stone laid in panels finished with 3mm (1/8") floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified over and eXCLUDING 8cm (3") thick base concrete consisting of cement fine sand of 1.25 fineness modulus and brick ballast 4 cm. (1½") gauge in the proportion of 1:4:8 and removing any overlapping mortar at the joints ofthe panels if any and giving them a uniform finish including supply of all materials, labour and tools and plants etc. required for proper completion of the work.
116.64
23328
200
... More
MS work in truss including all material, labour, T&P etc. required for proper completion of the work.
11454.07
675790
59
... More
Supply and fixing Galvanized corrugated iron roofing 24 B.W.C. in position including supply of materials, labour and tools and plants etc. required for proper completion of the work and including wastage.
748
561000
750
... More
Supplying and fixing 22 B.W.G. ridges valleys and gutters for iron roofing fixed with Jor U 10mm (3/8") dia with G.I. Limpet and bitumen washers complete including supply of all materials, labour and tools and plants etc. required, labour and tools and plants etc. required for proper completion of the work including wastage.
110
44000
400
... More
supply & Fixing of 10cm Internal dia PVC down-pipes complete with rose- heads, bends abd gratings & including supply of necessary M.S. clamps 2.5cmx3mm (1"x1/8") fixed to walls, with & including supply of 15cm (6") long 6mm (1?4") dia nails & including supply of all materials, labour and T&P etc required for proper completion of the work and also including repair of plaster, pointing etc if damaged during fixing of pipes, details of 30' length.
82.5
16500
200
... More
Earth work in filling with Material Obtained from Borrow Pits (Carted earth)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical specification clause 301.5
346.2
55392
160
... More
S/f of electrical work (Sheet atteched)
1
86995
86995
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements