Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date22 Jan 2024
Closing Date29 Jan 2024
Tender Amount₹ 18,67,426.7 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 38,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_883509_1Bid Award Id
ViewTender No
Ward 56 NNGTender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.(S.I No-273), for U-type drain (Mircha Yadav wali gali), for U-type drain ( Harendra to shree Ramkori), for U-type drain (Mahanth to Ramashray Tripathi), for U-type drain (Ram Ashray tripathi to vinay)
19.78
79250
4007
Cement Concrete with 20mm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I-279a) for crossing Ramp
3.22
26358
8186
E/W filling with cartage upto 10km including all complete of work.
162.15
53525
330.1
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in supply of all materials, labour, Tools & plants etc. required for proper completion of the work.(S.I No-289) drain bed L=(54+53)x2+24.5+25.2=263.70m) drain wall, drain cover
61.96
562747
9082
M.S. (Tor steel or plain) in plain work such as R.C.C or R.B work including bending for proper shape as necessary including bending for proper completion of the work and including supply of all steel & wastage, bend, hooks, and authorised overlapping shall be measured. (S.I-504)
38.91
299240
7690
S/L of GSB 53-9.5mm thick S/B upto 10cm loose layer including etc including all complete of work.
49.42
154885
3134.25
Consolidation of GSB upto 10cm thick loose layer by road roller including etc.including all complete of work.S.I No.753same Qqty. as above item no.8
49.42
14578
295
P/L of 125mm micron polythene including etc. all comlete of work. from above item
494.17
11860
24
Laying CC in 1:1.5:3 for top of drain work with cement, coarse sand & 20mm stone grit including supply of all materials and labour etc. same area as above item no.8
74.13
678289
9150
water allowance to be allowed on above i/c including all complete of work. same area as above item no.10
74.13
2557
34.5
C.C cutting groove by mechanical machine including all complete of work.
193.05
13513
70
Deduction cost of dismental materials
-
-
-
Old brick
2403
-16821
7
Old brick damage bats
2.21
-3094
1400