Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Eprocure
Opening Date30 Sep 2024
Closing Date25 Oct 2024
Tender Amount₹ 9,93,929
Costs
EMD
₹ 29,818Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Ward 25 Bada Bazar Constrution Of Rcc Drain
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_959714_145Tender No
764/E-T/PWC/2024-25Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
ded the cost of old bricks/batts
0.94
-564
600
... More
Excavation in foundation in odinary soil (loam clay or sand) including lift upto 1.50m and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the spacae between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directd by the enginer upto a distance of 30 M foundation trenches.
35.1
3334
95
... More
Cartage of Ballast kankar coal grit or sand etc including loading and unloading but excluding stackings on pucca roads. Upto 8km
28.08
6461
230.1
... More
Cement concrete with 4cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc required for proper completion of the work.
9.8
47530
4850
... More
RCC work with cement approved coarse sand and 2cm gauge stone grit in proportions of 1:1.5:3 in slab wall etc excluding supply of reinforcement and its bending but including its fixing and binding the same with 24BWG GI binding wire and including neccessary centering and shuttering etc and supply of all materials labour and tool & plants etc required for proper completion of the work including cost of binding wire the rate excludes makings of drip course wihch shall be paid extra.
24.06
175638
7300
... More
MS (tor or plain) plain work such as rcc or rb work including bending for proper shape and including supply of steel and its wastage bend. Hooks and authorised overlapping shall be measured and including cost of binding wire wastage including supply of all labour material t&p etc required for proper completion of the work
13.22
104545
7908.1
... More
steel work welded in built up sections/framed work. Including cutting hoisting fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required in gratings frames guard bar ladder railings brackets gates and
4550
475884
104.59
... More
Cement concrete with 4cm gauge approved stone ballast coarse sand & cement in the proportion of 4:2:1 including supply of all materials labour tools & plants etc required for proper completion of the work.
2
11500
5750
... More
S/F of inauguration board…….. Etc. with A/C
1
5000
5000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements