Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date15 Jan 2025
Closing Date20 Jan 2025
Tender Amount₹ 42,03,199
Costs
EMD
₹ 4,10,160Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DOLBU_993351_1Tender No
09-01-2025/NAGAR NIGAM AGRA/17-01-2025/130Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation in soil mixed with moorum/shingle, kankar requiring the use of special tools & plant such as pick axes sabbals etc. foundation in ordinary Soil (Loam, Cley or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. Including royalty.
427.5
145
61987.5
... More
Providing of 32 HP diesel pump for dewatering of pond with pump, driver etc. all complete. (for 8 hours)
32
2100
67200
... More
Cartage of silt, sludge kankar and other disposable organic material etc. all complete with labor T&P including cartage of 8 km.
616.5
230
141856.65
... More
Providing and laying cement concrete in 1:5:10 (1 Cement :5 Fine Sand :10 Stone Ballast 40 mm guages) and curing complete, including cost of form work in foundation and floors.
27
5250
141750
... More
R.C.C. work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 in R.C.C. Raft foundation and footing with 4 cm., Gauge approved stone ballast including all materials T&P.
67.5
7000
472500
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. including cost of centering shuttering finishing and excluding reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregates 20mm nominal size) upto plinth level.
180
8250
1485000
... More
Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars).
204
8500
1734000
... More
Supply and fixing of black granite stone board and approved standard matter with brick work, plaster & paint etc. all complete.
1
10000
10000
... More
Sub Total (A)
1
1
4203199.15
... More
Add / Deduction For Estimate Figure Amount Match
1
-
0.15
... More
Grand Total
1
1
4203199
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements