Directorate Of Urban Local Bodies Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date24 Nov 2024
Closing Date3 Dec 2024
Tender Amount₹ 18,49,732 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
cement concrete with 4 cm. Gauge approved stone ballast coarse sand and cement in proportion of 1:4:8 including supply of all materials,labour and T & P etc.required for proper completion of work . S.I. No. 281

14.69

5750

84456

... More
R.C.C. Work with cement ,approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2:4 in slab excluding supply of reinforcement and its bending , but including its fixing and binding the same with 24 B.W.G.G.I.binding wire and including necessary centering and shuttering etc. and supply of all materials , labour, Tools & plants etc. required for proper completion of the work binding wire of supplied by the contractor free of cost inculiding making of drip coarse.S.I.No. 283

19.2

7500

144000

... More
M-150 Brick Work in 1:4 (one cement & Four coarse sand of 1.25 F.M. Mortar) in Foundation & Plinth including supply of all materials , labour & T& P etc. Required for proper completion of work .SI no 307(a)

0.35

4950

1707.75

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / tractor mounted appropriate equipment on prepared surface , mixing by mix in place method with rotavator at OMC, and compacting with smooth MORD specifications 401.

115.5

3100

358050

... More
cement concrete with 2cm gauge approved stone grit , coarse sand & cement in the proportion of 1:1.5:3 in cc pavement (thickness as per design ) cement coarce &fine aggregate confirming to IS standard mixed in concrete mixture / plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design , laid in approved fixed form work (steel channel) laying and fixing of 125 micron thick polythene film wedges , steel plates including leveling the form work spreading the concrete with shovels , rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified ) and water finishing to lines & grade including supply of all material , labour, tools& plants etc. required for proper completion of the work and also including complete shifting of recron 3S fibre reinforcement material etc & concrete etc. NEW ITEM 3( p.no 49)

115.5

7350

848925

... More
R.C.C. Work with cement ,approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab excluding supply of reinforcement and its bending , but including its fixing and binding the same with 24 B.W.G.G.I.binding wire and including necessary centering and shuttering etc. and supply of all materials , labour, Tools & plants etc. required for proper completion of the work binding wire of supplied by the contractor free of cost .but for slab.S.I.No.284

1.09

7900

8642.6

... More
M.S.or iron in Plain work such as R.C.C. Or R.B. Work wrought torequired shape as necessary including bending for proper completion of the work and including supply of all steel and its wastage , bend , hooks , and authorised overlapping shall be measured and including cost of binding wire.S.I.No.504

9.81

8200

80466.6

... More
Cleaning silt drain malwa with disposal and shifting ,duraboard use in c.c. Road etc all complete work

1

5000

5000

... More
S & F Site board with writting latter all complete work .

1

6000

6000

... More
M.S work in heavy size for jall , channel, etc all complete work

1.61

8600

13880.4

... More
ADD GST

1

282162

282162



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.