Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date27 Sep 2024
Closing Date3 Oct 2024
Tender Amount₹ 42,10,163
Costs
EMD
₹ 4,10,508Document Cost
₹ 4,000Tender Fee
Refer Documents
Summary
Loha Mandi Zone, Drain Repair Work From Hema Petrol Pump
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_959382_1Bid Award Id
ViewTender No
20-09-2024/NAGAR NIGAM AGRA/30-09-2024/88Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation in foundation in ordinary Soil (Loam, Cley or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. (SI No. 251)
343.2
49764
145
... More
Cartage of ballast, Kankar, Coat, Grit or sand etc. including loading and unloading but excluding stacking on pucca roads.up to 8 Km distance
301.08
69278
230.1
... More
Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.10)
56.16
294840
5250
... More
R.C.C. work Providing and laying in position specified grade of R.C.C. Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) (Chapter 5 S.I. No. 5.1.4)
70.2
491400
7000
... More
R.C.C. work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 (1 Cement : 1.5 Coarse Sand : 3 Stone Grit) in R.C.C. column. (SI No. 289)
202.8
1693380
8350
... More
Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars).
127.36
1082560
8500
... More
Providing and fixing of barricading of 100mm average ballies with in a distance of 1.50 meter for 3 rows of 3Q. 3 Nosof cross ballies, two supporting ballies of 3 meter ballies and 2 Nos perpendicular ballies tie with moonj rope including supply of all material such as ballies rope T&P required for proper completion of work and also including labour component (material will be property of contractor after dismantling).
100
22500
225
... More
Dismantling brick work or stone work in lime or Cement mortar and including stacking of material as directed by E/IC with in a distance of 60 meters (200 feet) but Mud Mortar (SI No. 692)
44.85
29152
650
... More
R.C.C. work Providing and laying in position specified grade of renforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (S.I. No. 5.1.3)
7.5
57375
7650
... More
Supply and fixing of Precast RCC Drain Cover different size etc. all complete..
130
364000
2800
... More
Supply/Fixing of Black Granite Stone work display board. (NS)
1
10000
10000
... More
Sub Total (A)
1
4279934
1
... More
Deduction Cost of old brick
6189
38371
6.2
... More
Deduction Cost of old brick bats
31.4
31400
1000
... More
Sub Total (B)
1
69771
1
... More
Sub Total (A-B) = (C)
1
4210162
1
... More
Add/Deduction Rs. For Estimate Figure Amount Match
1
-
0.29
... More
Grand Total
1
4210163
1