Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date12 Jun 2024
Closing Date20 Jun 2024
Tender AmountRefer Documents
Costs
EMD
₹ 75,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_927884_1Bid Award Id
ViewTender No
Jal /724 / Zone 6/ Navsheel Dham / 150 mtrTender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
(b) 1.5m to 3.0m B.G.L.
71.55
20454
285.88
... More
Provide and fix close timbering in trenches for the depth as specified below G.L. consisting of 40 mm thick approved country wood plank for polling board 125 x 75 mm Indian Sal Wood wallers and 100 mm dia sal wood ballies for shuttering at 1.5 m C/C including all labour etc, complete (a) 1.5m to 3.0m B.G.L.
300
22920
76.4
... More
Supply of following sizes of RCC (NP3) spigotted and socketed non pressure pipes( Dia. In mm). C.P.W.D D.S.R
150
157500
1050
... More
Carting following sizes of R.C.C. Hume pipe NP3. Class Socket/ spigoted rubber ring jointing and specials from store to the work lowering the same in to the trenches upto depth as specified below G.L. true to alignment including excavation of earth below invert level of pipe, cost of all jointing material, testing etc. complete but excluding excavation and and refilling of trenches from ground level to the invert level of pipe. including supply of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer incharge. 300 mm dia. (c) 3.0m to 4.5m B.G.L.
150
78870
525.8
... More
Plain Cement concrete work for bedding below G.L. at spcified depth with cement, coarse sand and 20 mm gauge approved stone ballast (1:6:12) including supply of all materials, labour, T&P etc. required for the proper completion of work. (As per direction of Engineer -in-charge.) (a) PCC for pipe bedding
4.09
23106
5648.9
... More
Construction of circular brick work manhole chamber in 1st class brick work with 1:4 cement & coarse including supply all materials, labour, T&P etc. required for the proper completion of work as per direction of Engineer -in-charge. (a) b-type Manhole 1200 mm dia depth 2.01m to 2.3m.
6
229320
38220
... More
Provide necessary fuel, labour T&P etc. required for proper running of well point equipment of required for lowering the water table during excavation and laying of sewers (well point equipment depreciation not considered)Assume well point equipment will run 24 hours and 100m length of sewer will be laid per week i.e. in 5 days. (This item shall be executed when water is encountered during excavation of trenches only.)
1
1857
1857
... More
Making sewer line connection etc all complete.
2
30000
15000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements