Directorate Of Urban Local Bodies Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Eprocure
Opening Date10 Feb 2025
Closing Date21 Feb 2025
Tender Amount₹ 23,78,500
Costs
EMD
₹ 2,37,900Document Cost
₹ 2,832Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DOLBU_1004126_3Bid Award Id
ViewTender No
1758/NPPModinagar/E-Tender/25Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender Fee, EMD and Other documents as per the tender document/NIT
BOQ Items
... More
Reinforced cement concrete work in walls (any thickness), including
attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) including all type of materials, labour, tools & plants, taxe, octroi ,vat ,toll,etc.but excluding GST for proper completion of work as per direction Engineer-in-charge.
65.62
8504
558032.48
... More
Centering and shuttering including strutting, propping etc. and removal
of form for Foundations, footings, bases of columns, etc. for mass concrete including all type of materials, labour, tools & plants, taxe, octroi ,vat ,toll,etc.but excluding GST for proper completion of work as per direction Engineer-in-charge.
7.2
255
1836
... More
Centering and shuttering including strutting, propping etc. and removal
of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.including all type of materials, labour, tools & plants, taxe, octroi ,vat ,toll,etc.but excluding GST for proper completion of work as per direction Engineer-in-charge.
560
559
313040
... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage. Bend hooks, and authorised overlapping shall be measured and including cost of bindng wire.including all type of materials, labour, tools & plants, taxe, octroi ,vat ,toll,etc.but excluding GST for proper completion of work as per direction Engineer-in-charge.
64.09
8143
521884.87
... More
Disposal of surplus Dismantling material 8km Cartage.including all type of materials, labour, tools & plants, taxe, octroi ,vat ,toll,etc.but excluding GST for proper completion of work as per direction Engineer-in-charge.
332.5
230
76508.25
... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.including all type of materials, labour, tools & plants, taxe, octroi ,vat ,toll,etc.but excluding GST for proper completion of work as per direction Engineer-in-charge.
3
3220
9660
... More
Supply of 80mm thick Precast cement concerete I-shape or zigzag interlocking paver blocks with top layer of minimum 8 mm thickness having plan dimension 200x(160+120mm) with minimum 5mm thick topping of O.P. cement, smooth high gloss finish, skid resistant manufactured from rubber moulds through vibro-compression mechanism. The compressive strenght of concerete paver block shall not be less than 30 Mpa (M-30) and weight 5kg per No. confirming to IS:15658-2006 mark including cost of material, labour. T&P etc required for proper completion of the work as directed by Engineer in charge, But excluding UP TT which shall be paid extra as per rules.Including Of 40mm Thick Local Send Bed including all type of materials, labour, tools & plants, taxe, octroi ,vat ,toll,etc.but excluding GST for proper completion of work as per direction Engineer-in-charge.
30
749
22470
... More
M-150 Brick work in one cement 1:4 one cement & four C sand 1.25 F.M. mortor in foundation and plinth including supply of all materials labour, T&Petc. Reqd. for proper completion of the work including all type of materials, labour, tools & plants, taxe, octroi ,vat ,toll,etc.but excluding GST for proper completion of work as per direction Engineer-in-charge.
0.83
5170
4291.1
... More
12 mm thick plaster cement and fine sand of 1.25 fineness modules mortar in 1:4 over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work.including all type of materials, labour, tools & plants, taxe, octroi ,vat ,toll,etc.but excluding GST for proper completion of work as per direction Engineer-in-charge.
3
185
555
... More
Add 18% GST
1
362835
362835
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements