Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date26 Oct 2024
Closing Date18 Nov 2024
Tender Amount₹ 5,55,500 
Notes
Download

Costs

Summary

Construction Work In Ward No 8 And Other

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete with 2cm guage approved stone GRIT coarse sand and cement in proportion of 4:2:1 including supply of all materials, labour, and T&P etc. required for peoper completion of work. S.I.No.(279)a But Excluding G.S.T

0.57

6700

3819

... More
Construction of granular sub-base by providing wall graded material,spreading in uniform layers with motor grader/ tractor mounted appropriate equiment on prepared surface, mixing by mix in place method with rotavtor at OMC,and compaction with smooth MORD specific- ation 401.But Excluding G.S.T

7.1

2970

21087

... More
Cement concrete with 2 cm guage apprvoed stone grit coarse sand & cement in proportion of 1:1.5:3 in pavement 10 cm /as per design theckness for c.c road coarse & fine aggregate confirming to IS Standard mixed in concrete mixture/Plant of not less than 0.2 cum capacity & appropriate weight batcher using approved mixed design, laid in approved fixed form work (Steel Channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less than 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools and plants etc required for proper completion of work and also including complete shifting of material & concrete etc.S.I.No.780(3) But Excluding G.S.T

23.48

7350

172578

... More
R.c.c.work with cement approved coaese sand and 2cm. Guage approved stone grit in poportion of 1:1.5:3 in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc.and supply of all materials,labour and T&P etc. required for proper completion of,work. binding wire to be supplied by the contractor free of cost including making of drip coarse.S.I.N0.(283). But Excluding G.S.T

2.69

8650

23268.5

... More
Mild steel or TMT Bars (Fe -500 D grade or higher) or HYSD Bars in iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) brought to reuired shape as necessary including bending for proper complection of the work and including supply of all steel, boalts.nuts and wastage etc. and fixing ( S.I.No 504) But Excluding G.S.T

2.11

8200

17302

... More
S/F of M.S Jaal with cutting welding and reveting all complete. But Excluding.

18.26

8650

157949

... More
18 % GST

1

84744

84744



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.