Directorate Of Printing Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Printing - DOP Tender
Eprocure
Opening Date11 Apr 2018
Closing Date2 May 2018
Tender AmountRefer Documents
Costs
EMD
₹ 18,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_DoPTG_325850_1Tender No
90/1/2017-18/Gen.Tender Authority
Directorate Of Printing ViewPurchaser Address
-Website
http://http://dop.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
(iii)Excavating trenches upto a depth of 1.65M in Hard rock and back filling the excavated trenches after laying the HDPE / PLBpipe with or without protection as per tender specification.
1
428
428
... More
Laying of PLB pipe duct through HDD/Manual tunneling/Bucky method at a Depth of 2M or more.(HDD) (BSNL will supply HDPE/PLB Pipes & other accessories )
-
-
-
... More
i) Single PLB pipe
15330
2759400
180
... More
HDPE (The department will supply HDPE /PLB Pipe in coils of various length, HDPE / PLBSockets/Coupler, End caps. )
-
-
-
... More
i) Laying of single HDPE / PLBPipes/Coils, coupled with coupler.
35210
105630
3
... More
GIPT (The Department will supply G.I. Pipes in lengths of approx. 6 M, HDPE / PLBPipes/Coils.)
-
-
-
... More
Laying and fixing of 40-80 mm/40mm G.I. Pipes in trenches with HDPE / PLBPipes/Coils inside.
1
11
11
... More
GIBC (The Department will supply G.I. Troughs/GI Pipes in lengths of approx. 6 M clamps. HDPE / PLBPipes/Coils )
-
-
-
... More
Laying and fixing of 40-80mm / 40 mm GI pipes/GI Troughes on Bridges and Culverts with HDPE / PLBpipes/coils inside.
2860
28600
10
... More
RCCT (The Department will supply full round/Split RCC/DWC Pipes in lengths of 2 M , HDPE / PLBPipes/Coil PP Rope, Materials required for sealing the coupling of RCC/DWC Pipes will be arranged by the contractor. )
-
-
-
... More
Laying full round RCC/DWC Pipes in trenches with HDPE / PLBpipes / coils inside for item no. 1.0
1990
15920
8
... More
Laying Split RCC/DWC Pipes in trenches with HDPE / PLB pipes / coils inside . for item No.1.0
2050
10250
5
... More
PCCT
-
-
-
... More
Providing RCC Protection (1:2:4) at Site to HDPE / PLB or GI Pipes & for item No.1.0 (size 25 cmx25 cm or as per requirement & instruction of site Engineer).
208
520000
2500
... More
OFCP (The Department will supply O.F. Cable, Rubber Bush, Split RCC/DWC, HDPE / PLBPipes Clamps. All other materials required for the work shall be arranged by the contractor.)
-
-
-
... More
(i)Opening of Manholes, Blowing of O.F. Cable, Sealing of HDPE / PLB Pipes by Rubber Bushes in Manholes, providing HDPE/RCC/DWC Split Pipes in manhole/Back Filling of Manholes.
1
7
7
... More
(ii)Opening of Manholes, Pulling of O.F. Cable Sealing of HDPE / PLB Pipes by Rubber Bushes in Manholes, providing HDPE/RCC/DWC Split Pipes in manhole/Back Filling of Manholes.
94072
470360
5
... More
OFST (Splicing of all the fibres of OF cable laid at every joint and making terminations at the ends
-
-
-
... More
(a) For 24 F
60
360000
6000
... More
(b) For 12 F
10
40000
4000
... More
(c) For 6 F
1
3000
3000
... More
(d) Splicing of per ribbon
1
2500
2500
... More
Jointing Chamber (All materials required for the work shall be arranged by the contractor.)
-
-
-
... More
JCBR
-
-
-
... More
Digging of pit for jointing chamber construction of brick chamber, fill- ing of brick Chamber with clean sand, supply and placing of stone slabs on brick chamber, and back filling of jointing pit.
70
154000
2200
... More
JCPC (The Department will supply Pre-cast RCC Chamber with cover.)
-
-
-
... More
Digging of pit for jointing chamber, Fixing of Pre-cast RCC chamber, filling of RCC chamber with clean sand, placing of Pre-cast RCC slabs on RCC chamber, and back filling of jointing pit.
1
800
800
... More
ORJF
-
-
-
... More
i) Digging of pit 1 meter towards jungle side on each manhole/joint chamber for fixing of route/joint indicator ,fixing and concreting route/joint indicator, Painting and sign writing of route/joint indicators.The work should be done as per tender speci
476
84728
178
... More
GISP (Supply of ISI mark light class GI pipes for item no. 5&6)
-
-
-
... More
(a) 50 mm
1
142
142
... More
(b) 65 mm
1
201
201
... More
(c) 100 mm
1
344
344
... More
RCCS1
-
-
-
... More
Supply of ISI mark NP-2 class half round 100 mm dia RCC pipe in 2 mtrs. Length normally, S&S type with inbuilt collar at one end
1
31
31.05
... More
RCCS2
-
-
-
... More
Supply of ISI mark NP-2 class full round 100 mm dia RCC pipe in 2 mtrs. Length normally, S&S type with inbuilt collar at one end
1
76
76.25
... More
Route Indicator (Supply of route indicator as per tender specification at site.)
476
47600
100
... More
DOCT
-
-
-
... More
Documentation (6 set of bound hard copies of documents & one soft copy for each route.
86
21500
250
... More
OFCL
-
-
-
... More
Laying of OF Cable in corridor/rises/exchange premises (leading in work)
440
4400
10
... More
SFTB
-
-
-
... More
Splicing of all the fibers of 24 F OF Cable in the fiber Termination Box at the Gram Penchants and testing all the fibers for continuity. This will also include installation /mounting of the FTB and spare cable Chamber as specified
44
154000
3500
... More
RRSC
-
-
-
... More
Road restoration work with cement concrete 1:4:8 mix for thickness varying from 150mm to 225 mm including supply of Material to evenly match the road.
208
395200
1900
... More
VLCR
-
-
-
... More
Video-grapy of the route on which cable is laid
1
300
300
... More
MFDO
-
-
-
... More
Physical mounting of FDMS on wall at OLT Locations
2
500
250
... More
RECD
-
-
-
... More
Cost of recovery of empty OF Cable (12F/24F/48F/96F) drum from the contractor
48
9600
200
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements