Directorate Of Printing Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Printing - DOP Tender

Goods
Electrical Goods and Equipments
Electrical and Electronics
Eprocure
Opening Date10 Apr 2018
Closing Date1 May 2018
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Sale/Disposal of Unserviceable Printing Machinery and Allied Equipments

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
DL NO: 1 GENERAL SERVICES FOLLOWING ADDINIAL SERVICES TO BE PROVIDED DURING REFIT (a) DRY DOCK CHARGES FOR THE ENTIRE DURATION UNDERWATER PACKAGE FOR BOTH VERSIONS OF DOCKING (b) OFFICE SPACE WITH ALL OFFICE AMENITIES INCLUDING TELEPHON E, POWER SUPPLY. (c) TOILET FACILITY NEAR DOCK FOR CREW. (d) REST ROOM FOR DUTY PERSONNEL (05 PERSONEEL (e) JETTY CRANE, MOBILE CRANE, FORK LIFT FACILITY WHEREVER REQUIRED (f) TRANSPORT FOR TRANSFER OF PERSONNEL AND MATERIAL (01 LMV).

1

-

-

... More
DL NO; 2 DOCKING ROUTINES ENTIRE UNDER WATER HULL AREA INCLUDING BOOT TOPING AREA TO BE CLEANED USING HIGH PRESSURE HYDRO JET . TO REMOVE MARINE GROWTH AND FOR FACILITATING HULL INSPECTION. ENTIRE U/W AREA, BOOT TOP AREA TO BE GRIT BLASTED.EXAMINE/SURVEY THE AREA (AREA :U/W 260 SQMTR INCLUDING BOOT TOP)

260

-

-

... More
DL NO: 3 UNDERWATER HULL SURVEY ENTIRE UNDERWATER HULL INCLUDING BOOT TOPPING AREA BE VISUALLY SURVEYED.USG SURVEY TO BE CARRIED OUT AT DIFFERENT LOCATIONS. (AREA :U/W 260 SQMTR INCLUDING BOOT TOP)

260

-

-

... More
DL NO:4 UNDERWATER HULL RENEW OF STEEL AT DEFECTIVE AREAS AS PER THE SURVEY REPORT OF NSRY SURVEY TEAM.

15

-

-

... More
DL NO: 5 UNDERWATER HULL PAINT CONDITION TO BE INSPECTED AND RESTORED IF NECESSARY AS PER NO 20/03 OR LLPS. (AREA :U/W 324 SQMTR INCLUDING BOOT TOP)

324

-

-

... More
DL NO: 6 SEA TUBES REMOVE, CLEAN, AND EXAMINE GRATINGS OF INLET AND DISCHARGE. EXAMINE ANODES OF INLETS AND DISCHARGES. REPLACE GRATINGS ON COMPLETION OF REPAIRS. (02 IN NO GRATINGS)

2

-

-

... More
DL NO: 6 SEA TUBES REMOVE, CLEAN, AND EXAMINE GRATINGS OF INLET AND DISCHARGE. EXAMINE ANODES OF INLETS AND DISCHARGES. REPLACE GRATINGS ON COMPLETION OF REPAIRS. (02 IN NO GRATINGS)

22

-

-

... More
DL NO: 8 DOCKING ROUTINES REMOVE, CLEAN, PAINT AND REFIT THE EDDY PLATE AND ROPE GUARD.

1

-

-

... More
DL NO: 9 TANK TOPS VISUAL SURVEY OF UNDER MENTIONED TANKS TO BE CARRIED OUT. JOB INVOLVES SURFACE PREPARATION TO BARE METAL OF ENTIRE BULHEADS, STIFFENERS. PAINT SCHEME TO BE RESTORED POST SURVEY/ RENEWAL AS PER NO 20/03 OR LLPS AS PER THE DETAILS GIVEN BELOW. A) FORE PEAK TANK + CHAIN LOCKER - 30 sqmtrs 1. ZINC PHOSPHATE PRIMER (INTER PRIME 538). RED - DFT 75 - PSR(m2/Lt) 5.32 2. AKLYD FINISH . (INTER LAC 665) - WHITE - DFT 50 - PSR(m2/Lt) 6.72 B) FWD BALLAST TANK NO 1 - 60 sqmtrs 1. EPOXY PRIMER TIE COAT (INTERGARD 269). RED - DFT 50 - PSR(m2/Lt) 5.64 2. ABRASION RESISTANT ALUMINIUM PURE EPOXY. (INTERSHIELD 300) - BRONZE - DFT 150 - PSR(m2/Lt) 2.4 3. ABRASION RESISTANT ALUMINIUM - PURE. EPOXY (INTERSHIELD 300) - ALUMINIUM - DFT 150 - PSR(m2/Lt) 2.4

30

-

-

... More
C) FWD BALLAST TANK NO 2 - 60 sqmtrs 1. EPOXY PRIMER TIE COAT (INTERGARD 269) -. RED - DFT 50 - PSR(m2/Lt) 5.64 2. ABRASION RESISTANT ALUMINIUM PURE EPOXY. (INTERSHIELD 300) - BRONZE - DFT 150 - PSR(m2/Lt) 2.4 3. ABRASION RESISTANT ALUMINIUM - PURE. EPOXY (INTERSHIELD 300) - ALUMINIUM - DFT 150 - PSR(m2/Lt) 2.4

60

-

-

... More
D) FRESH WATER TANK (P/S) + GRAVITY TANK - 100 sqmtrs 1. EPOXY PHENOLIC TANK (INTERLINE 850) - . GREY - DFT 150 - PSR(m2/Lt) 3.55 2. EPOXY PHENOLIC TANK COATING (INTERLINE 850) - WHITE - DFT 150 - PSR(m2/Lt) 10.64 3. EPOXY PHENOLIC TANK COATING (INTERLINE 850) - WHITE - DFT 150 - PSR(m2/Lt) 3.55

100

-

-

... More
DL NO: 10 TANK TOPS E) AFT BALLAST TANK P/S - 100 sqmtrs 1. EPOXY PRIMER TIE COAT (INTERGARD 269) -.RED - DFT 50 - PSR(m2/Lt) 5.64 2. ABRASION RESISTANT ALUMINIUM PURE EPOXY. (INTERSHIELD 300) - BRONZE - DFT 150 - PSR(m2/Lt) 2.4 3. ABRASION RESISTANT ALUMINIUM - PURE. EPOXY (INTERSHIELD 300) - ALUMINIUM - DFT 150 - PSR(m2/Lt) 2.4 F) ENGINE ROOM BILGES WITH FRAMES - 200 sqmtrs 1. ZINC PHOSPHATE PRIMER(INTERPRIME 538) . RED - DFT 80 - PSR(m2/Lt) 4.99 2. ALKYD FINISH . (INTER LACK 665) - WHITE - DFT 40- PSR(m2/Lt) 8.4 3. ALKYD FINISH. (INTER LACK 665) - WHITE - DFT 40- PSR(m2/Lt) 8.4 G) FUEL OIL TANK 1. EPOXY TANK HOLDING PRIMER (INTERLINE 982) . - PRIMROSE - DFT 40 - PSR(m2/Lt) 5.25 2. EPOXY TANK COATING (INTERLINE 704) - GREY - . DFT 100 PSR(m2/Lt) 3.71

550

-

-

... More
G) ENGINE ROOM STORE BILGES WITH FRAMES - 50 sqmtrs 1. ZINC PHOSPHATE PRIMER(INTERPRIME 538). RED - DFT 80 - PSR(m2/Lt) 4.99 2. ALKYD FINISH . (INTER LACK 665) - WHITE - DFT 40- PSR(m2/Lt) 8.4 3. ALKYD FINISH. (INTER LACK 665) - WHITE - DFT 40- PSR(m2/Lt) 8.4 H) ASP BILGES WITH FRAMES - 100 sqmtrs 1. ZINC PHOSPHATE PRIMER(INTERPRIME 538)- RED - DFT 80 - PSR(m2/Lt) 4.99 2. ALKYD FINISH . (INTER LACK 665) - WHITE - DFT 40- PSR(m2/Lt) 8.4 3. ALKYD FINISH . (INTER LACK 665) - WHITE - DFT 40- PSR(m2/Lt) 8.4

150

-

-

... More
J) FUEL OIL TANK - 250 sqmtrs 1. EPOXY TANK HOLDING PRIMER (INTERLINE 982) . - PRIMROSE - DFT 40 - PSR(m2/Lt) 5.25 2. EPOXY TANK COATING (INTERLINE 704) - GREY . DFT 100 PSR(m2/Lt) 3.71 3. EPOXY TANK COATING (INTERLINE 704) - PINK. DFT 100 PSR(m2/Lt) 7.42 4. EPOXY TANK COATING (INTERLINE 704) - PINK . DFT 100 PSR(m2/Lt) 3.71 5. EPOXY TANK COATING (INTERLINE 704) - GREY. DFT 100 PSR(m2/Lt) 3.71

250

-

-

... More
K) GRAVITY TANKS FITTED ON FUNNEL DECK (02 NOS) - 20 SQMTRS 1. EPOXY PHENOLIC TANK (INTERLINE 850) . GREY - DFT 150 - PSR(m2/Lt) 3.55 2. EPOXY PHENOLIC TANK COATING (INTERLINE 850) - WHITE - DFT 150 - PSR(m2/Lt) 10.64 3. EPOXY PHENOLIC TANK COATING (INTERLINE 850) - WHITE - DFT 150 - PSR(m2/Lt) 3.55

20

-

-

... More
DL NO: 11 VENTILLATION SYSTEM 02 IN NO. VENTILATION FLAPS ON SUPER STRUCTURE, CORRODED/BROKEN. TO BE RENEWED AS PER SAMPLE WITH HINGES AND WIRE MESH.

2

-

-

... More
DL NO: 12 MUSHROOM HEAD 04 IN NO. MUSHROOM HEAD SECURING ROUND PLATES CORRODED/METAL THINNED. TO BE RENEWED AND BOLTED AS PER SAMPLE. MAT. MS, THK-8MM.

4

-

-

... More
DL NO: 13 MUSHROOM HEAD 04 IN NO. MUSHROOMS TRUNKING, CORRODED/METAL THINNED. TO BE RENEWED/WELDED IN SITU. MAT. MS, THK-8MM. (HT-40CM, DIA. OF PIPE-70CM.EACH).

4

-

-

... More
DL NO:14 MUSHROOM HEAD OVER HAULING OF 04 NOS MUSHROOM HEAD TO BE CARRIED OUT

4

-

-

... More
DL NO: 15 TYRE FENDERS GI CHAIN FOR SECURING TYRE FENDERS ON SHIP SIDE(PORT & STBD) CORRODED/ THINNED. TO BE RENEWED.SIZE- DIA 16 MM, 2 RMTR EACH. (20 NOS)

20

-

-

... More
DL NO: 16 HULL SURVEY BULWARK AT DIFFERENT PLACES, ALL AROUND THE TUG, CORRODED/HOLED. TO BE RENEWED AS NECESSARY. (MAT. MS). APPROX. AREA 08 SQMTR.

8

-

-

... More
DL NO: 17 HULL SURVEY 02 IN NO. MS METAL OPENING DOORS JAMMED AND LOCKING ARRANGEMENTS CORRODED. DOOR TO BE EASED AND LOCKING ARRANGEMENT TO BE PROVIDED.

2

-

-

... More
DL NO: 18 SANITARY SYSTEM BASE PLATE OF 02 IN NO. W/C, CORRODED/BROKEN. MAT.-MS THICK-10MM, AREA - 2SQMTR. W/C COMMODE TO BE RENEWED. W/C TO BE SECURED TO BASE PLATE WITH SS NUT&BOLTS/SCREWS.

2

-

-

... More
DL NO: 19 SANITARY SYSTEM CREW BATH ROOM WASH BASIN DRAIN PIPE CORRODED TO BE RENEWED . 03 MTRS LENGTH. MAT GI

3

-

-

... More
DL NO: 20 MISCELLANEOUS MASTER CABIN W/C DOOR FRAME PERISHED TO BE REPAIRED. JOB INVOLVES RENEWAL AND FITMENT OF 03 NOS DOOR HINGES (03 NOS)

3

-

-

... More
DL NO: 21 SANITARY SYSTEM CREW W/C FLUSHING LINE PERISHED AND BROKEN TO BE RENEWED. MAT. CUNI, LENGTH 04 MTRS. JOB INVOLVES RENEWAL OF FLUSHING VALVE (01 NO).

1

-

-

... More
DL NO: 22 WINDLASS 02 IN No. WINDLASS CANVAS COVERS PERISHED/TORN. TO BE RENEWED WITH 3M X 2M X 1.5M MEASURING CANVAS CLOTHS.

2

-

-

... More
DL NO: 23 W/T HATCH 06 IN NO. HATCH RETAINING SPRING CLIPS CORRODED/JAMMED. TO BE RENEWED WITH SPRING AND WELDED IN SITU.

6

-

-

... More
DL NO: 24 WINDLASS METALLIC COVER FOR WINDLASS CONTROL POST, CORRODED/HOLED. TO BE RENEWED/WELDED IN SITU. AS PER SAMPLE.

1

-

-

... More
DL NO: 25 WINDLASS OVERHAULING OF WINDLASS. PARTS TO BE DISMANTLED AND WORKING CONDITION OF THE PARTS TO BE CHECKED/TRIALED, AND SUSPECTED DEFECTIVE PARTS TO BE RENEWED AS NECESSARY. BRAKE LINING TO BE RENEWED. GREASING OF REQUIRED GREASING POINT TO BE CARRIED OUT. STRUCTURE OF WINDLASS (OIL CASING) CRACKED/ HOLED RESULTING IN LEAKAGE OF OIL . TO BE REPAIRED.

1

-

-

... More
DL NO: 26 FENDER BOW FENDER RUBBER (QTY - 04 NOS, LENGTH 1.5 MTRS EACH, WIDTH 0.26 MTRS, TYPE - RECTANGULAR ) BROKEN AND DAMAGED TO BE RENEWED

4

-

-

... More
DL NO: 27 ANCHOR & CHAIN CABLE ANCHOR AND ASSOCIATED CHAIN CABLE WITH FITTINGS TO BE SURVEYED. ANCHOR CHAIN CABLE TO BE LOAD TESTED. JOB INVOLVES REMOVAL OF ANCHOR AND CHAIN CABLE FROM CABLE LOCKER, CLEANING OFF ALL PAINT AND RUST USING MECHANICAL CHIPPING, SCRAPING ND WIRE BRUSH TOOLS , DISMANTLING/ DISCONNECTING OF LUGGLESS JOINING SHACKLES, SWIVEL ADAPTORS ETC., POST SURVEY, ENTIRE CHAIN CABLE AND ASSOCIATED FITTINGS TO BE RECOATED (PAINTED) WITH BITUMINOUS PAINT.( 01 ANCHOR, CHAIN CABLE 17.5 MM, FULL SHAKLE - 06 (3P + 3S), HALF SHAKLE - 04 (2P + 2S).

2

-

-

... More
DL NO: 28 EXHAUST TRUNKING 02 SQMTR. OF BELLOW COVER FOR EXHAUST TRUNKING PERISHED/TORN. TO BE RENEWED WITH NEW CLOTH. (MAT. CANVAS).

2

-

-

... More
DL NO: 29 SANITARY SYSTEM MASTER CABIN FLUSH VALVE PERISHED AND NON OPERATIONAL TO BE RENEWED

1

-

-

... More
DL NO: 30 ANCHOR WINDLASS ABNORMAL NOISE AND OIL LEAKAGE OBSERVED FROM ANCHOR WINDLASS OIL CHAMBER. OVERHAULING OF ANCHOR WINDLASS

1

-

-

... More
DL NO: 31 W/T HATCH 05 NOS WEATHER DECK W/T HATCH RUBBER PERISHED TO BE RENEWED. POST REPAIR CHALK TESTING TO BE CARRIED OUT.

5

-

-

... More
DL NO: 32 TOWING HOOK AFT TOWING HOOK NON OPERATIONAL TO BE OVERHAULED.

1

-

-

... More
DL NO: 33 FIRE HYDRANTS 04 IN NOS FIRE HYDRANTS TO BE OVERHAULED ON UPPER DECK, 01 DECK AND MONKEY BRIDGE QTY- 04

6

-

-

... More
DL NO: 34 FRESH WATER SYSTEM CREW TOILET SHOWER PIPE PERISHED TO BE RENEWED(LENGTH OF PIPE 04 MTRS, MAT GI)

4

-

-

... More
DL NO: 35 MSCELLANEOUS CO2 EXTINGUISHER BRACKET OF FOLLOWING PLACES DAMAGED / BROKEN TO BE RENEWED AND WELDED INSITU. (A) BRIDGE (B) GALLEY

2

-

-

... More
DL NO: 36 FENDER 08 IN NOS TYRE FENDER PERISHED TO BE RENEWED WITH SECURING CHAIN AND D SHACKLES AND 16 NOS TYRE FENDER COLLAR.

8

-

-

... More
DL NO: 37 MISCELLANEOUS AFFF EXTINGUISHER BRACKET OF ACCOMMODATION SPACE DAMAGED / BROKEN TO BE RENEWED AND WELDED INSITU.

1

-

-

... More
DL NO: 38 DRAUGHT MARKING DRAUGHT MARKING AT FOLLOWING LOCATIONS TO BE REPAINTED IAW NO 20/03 ON PRIORITY BASIS. (A) FWD STBD-1.5SQMTRS (B) FWD STBD-1.5SQMTRS (C) FWD PORT-1.5SQMTRS (D) AFT STBD-1.5SQMTRS (E) AFT PORT-1.5SQMTRS (F) PROPELLER DRAUGHT PORT-1.5SQMTRS (G) PROPELLER DRAUGHT STBD-1.5SQMTRS

10.5

-

-

... More
DL NO: 39 HATCHS HATCHES (05 NOS) DEFECTIVE, FOLLOWING REPAIR TO BE CARRIED OUT. (A) CLIPS (MS) RENEWAL NOS 04 (B) WEDGE (MS) RENEWAL NOS 04 (C) EPDM RUBBER RENEWAL RMTRS 08 (D) RETAINING LUG WITH STAND NOS 02 (E) OVERHAULING HATCHES NOS 02 (F) HATCH COVER METAL COMING RENEWAL RMTRS 20 (G) LOCKING EYE BRACKETS RENEWAL NOS 02 (H) HINGE BRACKETS RENEWAL NOS 04 (J) HINGE STUDS WITH PIN(MS) NOS 02 (K) WASHER (MS) RENEWAL NOS 08 (L) DECK COMING RMTRS 08 (M) PROVING OF CHALK TEST PER HATCH 02

5

-

-

... More
DL NO: 40 HULL SURVEY FOLLOWING DEFECTS OF NT ARGA 01 SCUTTLES TO BE REPAIRED / RENEWED. (A) EYE HOOKS CORRODED TO BE RENEWED - QTY 02 NOS (MAT M.S ). (B) SECURING CHAIN FOR SCUTTLES WITH END RINGS - QTY 02 NOS (MAT GI CHAIN, LENGTH 02 MTRS ). (C) SUNMICA PANELING OF DECKHEAD / BULKHEAD TO BE DEGUTTED FOR WELDING WORK OF EYE HOOKS AND POST WELDING SUNMICA PANELING TO BE RENEWED (MAT SUNMICA, AREA – 16 SQMTRS).

1

-

-

... More
DL NO: 41 FENDER FOLLOWING DEFECTS OF FENDER TO BE RECTIFIED. A FENDER SECURING CHAIN(16 MM) CORRODED TO BE RENEWED – 25 MTRS B D-SHACKLE( 20MM) CORRODED TO BE RENEWED – 22 NOS

1

-

-

... More
DL NO: 42 SANITARY SYSTEM 01 SHOWER FITTING IN MASTER TOILET CORRODED/ DAMAGED. TO BE RENEWED. MAT- CU(PIPELINE), COMMERCIAL SHOWER FITTING(JAQUAR), 1/2" DIA.

1

-

-

... More
DL NO: 43 SANITARY SYSTEM SOIL DISCHARGE LINE OF CREW WC-1 CORRODED AND DAMAGED. TO BE RENEWED. MAT- MS/ GI. APPROX LENGTH- 5 RMTR. SIZE- 4".

5

-

-

... More
DL NO: 44 DRAINAGE SYSTEM 10 IN NO DECK DRAINS ON WEATHER DECK, 01 & 02 DECKS CHOKED/ CLOGGED. TO BE CLEARED. JOB INVOLVES MANUFACTURING OF NEW DRAIN PIPES AS PER EXISTING FIT AND FITMENT OF THE SAME INSITU.

10

-

-

... More
DL NO: 45 DRAINAGE SYSTEM DECK DRAIN IN CREW WC- 1& 2, MASTER CABIN WC AND ENGINE DRIVER WC CLOGGED AND JAMMED. TO BE REPAIRED IN SITU. JOB INVOLVES RENEWAL OF PIPELINE(DRAINLINE), DEGUTTING/ REGUTTING OF DECK COVERING, LAGGING BRACKETS ETC., MAT- MS/GI. APPROX LENGTH- 15 RMTR. SIZE-1 1/2".

15

-

-

... More
DL NO: 46 VENTILLATION SYSTEM 04 MUSHROOM HEADS OF VENTILLATION SYSTEM TO BE OVERHAULED. JOB INVOLVES REMOVAL OF MUSHROOM HEADS FROM SITU,RENEWAL OF WIRE MESH AS PER EXISTING FIT. APPROX 25 SQMTR, OVERHAULING OF FLAP VALVE AND SPLINDLE ASSEMBLY, RENEWAL OF STRUCTURE IF NECESSARY, FITMENT OF MUSHROOM HEADS POST OVERHAUL, RENEWAL OF RUBBER PACKING.

4

-

-

... More
DL NO: 47 TANKS CLEAN / VENTILATE THE FOLLOWING TANKS TO REMOVE ALL DIRT, SLUDGE, RESIDUAL OIL AND DEBRIS AND LOOSE PAINT. SCRAPE / CLEAN CORRODED / RUSTED AREAS TO BARE METAL AND PREPARE STRUCTURE FOR USG SURVEY : A) FORE PEAK TANK + CHAIN LOCKER - 30 sqmtrs B) FWD BALLAST TANK NO 1 - 60 sqmtrs C) FWD BALLAST TANK NO 2 - 60 sqmtrs D) FRESH WATER TANK (P/S) + GRAVITY TANK - 100 sqmtrs E) AFT BALLAST TANK P/S - 100 sqmtrs F) ENGINE ROOM BILGES WITH FRAMES - 200 sqmtrs G) ENGINE ROOM STORE BILGES WITH FRAMES - 50 sqmtrs H) ASP BILGES WITH FRAMES - 100 sqmtrs J) FUEL OIL TANK - 250 sqmtrs NOTE : MAN ENTRY AND GAS FREE CERTIFICATE TO BE OBTAINED BY THE VENDOR FOR THE ABOVE MENTIONED TANKS FROM GOVT. APPROVED AGENCY PRIOR TO COMMENCEMENT OF HOTWORK.

950

-

-

... More
DL NO: 49 PAINT SCHEME SUPER STRUCTURE BULK HEAD AREA (WHEEL HOUSE DECK) - 38 SQMTRS 1. EPOXY PRIMER / TIE COAT (INTERGARD 269) - . RED - DFT 50 - PSR(m2/Lt) 6.58 2. EPPOXY ANTICORROSIVE (INTERUF 262) - BLACK - DFT 125 - PSR(m2/Lt) 4.09 3. EPPOXY ANTICORROSIVE (INTERUF 262) - GREY - DFT 125 - PSR(m2/Lt) 4.09 4. POLYURETHANE (INTERTHANE 990) - RAL7040 WINDOW GREY - DFT 50 - PSR(m2/Lt) 7.98

38

-

-

... More
DL NO: 50 PAINT SCHEME 2. SUPER STRUCTURE BULK HEAD AREA (NO 1 DECK TO WHEEL HOUSE DECK) - 58.8 SQMTRS2 1. EPOXY PRIMER / TIE COAT (INTERGARD 269) - RED - DFT 50 - PSR(m2/Lt) 6.58 2. EPPOXY ANTICORROSIVE (INTERUF 262) - BLACK - DFT 125 - PSR(m2/Lt) 4.09 3. EPPOXY ANTICORROSIVE (INTERUF 262) - GREY - DFT 125 - PSR(m2/Lt) 4.09 4. POLYURETHANE (INTERTHANE 990) - RAL7040 WINDOW GREY - DFT 50 - PSR(m2/Lt) 7.98

58.8

-

-

... More
DL NO: 51 PAINT SCHEME FUNNEL - 11.50 SQMTRS 1. ONE COAT OF PRETREATMENT PRIMER PREPARED FROM DS CAT NO. 8010-000116 (BASE) AND DS CAT NO. 8010-000117 (ACCELERATOR) 2. WITHIN 4 HOURS APPLY ONE COAT OF CHLORINATED RUBBER PAINT PRIMER PATT NO. 8010-000460. 3. ONE COAT OF CHLORINATED RUBBER PAINT WHITE PATT NO 8010-000431

11.5

-

-

... More
DL NO; 52 PAINT SCHEME 3. MAST 02 NOS , MISC FITTINGS AND ALL GUARD RAILS - 12 SQMTRS 1. EPOXY PRIMER / TIE COAT (INTERGARD 269) - RED - DFT 50 - PSR(m2/Lt) 6.58 2. EPPOXY ANTICORROSIVE (INTERUF 262) - BLACK - DFT 125 - PSR(m2/Lt) 4.09 3. EPPOXY ANTICORROSIVE (INTERUF 262) - GREY - DFT 125 - PSR(m2/Lt) 4.09 4. POLYURETHANE (INTERTHANE 990) - RAL7040 WINDOW GREY - DFT 50 - PSR(m2/Lt) 7.98

12

-

-

... More
DL NO: 53 PAINT SCHEME 4.ABOVE BOOT WATER LINE AREA(95.225SQMTRS) + BULWARK AREA(142.00SQMTRS) TOTAL AREA 220 Sq Mtr 1. EPOXY PRIMER / TIE COAT (INTERGARD 269). RED - DFT 50 - PSR(m2/Lt) 6.58 2. ABRASION RESISTANT ALUMINIUM PURE EPPOXY (INTERSHIELD 300) - BRONZE - DFT 150 - PSR(m2/Lt) 2.8 3. ABRASION RESISTANT ALUMINIUM PURE EPPOXY (INTERSHIELD 300) - ALUMINIUM - DFT 150 - PSR(m2/Lt) 2.8 4. EPOXY TIE COAT (INTERGARD 263) - LIGHT GREY - DFT 125 - PSR(m2/Lt) 3.19 5. TBT FREE SELF POLISHING COPOLYMER A/P (INTER SMOOTH 360 SPC) - BLACK - DFT 150 - PSR(m2/Lt) 1.87 6. TBT FREE SELF POLISHING COPOLYMER A/P (INTER SMOOTH 360 SPC) - BLACK - DFT 150 - PSR(m2/Lt) 1.87 7. TBT FREE SELF POLISHING COPOLYMER A/P (INTER SMOOTH 360 SPC) - BLACK - DFT 150 - PSR(m2/Lt) 1.87

220

-

-

... More
DL NO: 54 PAINT SCHEME 5. DECK 01,02, AND MAIN DECK - 171.38 SQMTRS 1. EPOXY PRIMER / TIE COAT (INTERGARD 269) . RED - DFT 50 - PSR(m2/Lt) 6.58 2. ABRASION RESISTANT ALUMINIUM PURE EPOXY (INTERSHIELD 300) - ALUMINIUM - DFT 200 - PSR(m2/Lt) 2.1 3. EPOXY NON SKID (INTERSHIELD 352). EXTRA DK SEA GREY - DFT 300 - PSR(m2/Lt)(m2/Lt) 0.66

171

-

-

... More
DL NO: 55 STP (1) STP TO BE OVERHAULED, WHICH INCLUDES MACERRATOR PUMP, IMO PUMP, OBD PUMP, 04 IN NO OF VALVES (2) UNDER WATER OVERBOARD VALVES OF STP FOUND FULLY CHOKED WITH SHELLS. (3) STP INLET VALVE STUCK UP TO BE OVERHAULED (4) CLEANING AND PRESERVATION OF 02 TANKS (5) RENEWAL OF SOIL PIPE AND DISCHARGE PIPE. (6) OVERHAULING OF 10 IN NO VALVES (7) OVERHAULING OF 03 MOTORS

1

-

-

... More
DL NO: 56 MISCELLANEOUS CREW W/C 02 IN NOS DOOR SIDE FRAME CORRODED TO BE RENEWED.

2

-

-

... More
DL NO: 57 WC DECK DRAIN 06 IN NOS OF DECK DRAIN OF CREWS WC STRAINER CORRODED BROKEN TO BE REPAIRED/RENEWED

6

-

-

... More
DL NO: 58 MISCELLANEOUS 15 IN NOS QUICK SHUT OF VARIOUS BREATHER PIPES AND OTHER PIPE LINES CTH TO BE REPAIRED/RENEWED

6

-

-

... More
DL NO: 59 MISELLANEOUS NT ARGA NAME BOARD BROKEN/PERISHED TO BE REPAIRED/RENEWED

2

-

-

... More
DL NO: 60 EXHAUST TRUNKING NT ARGA SRP EXHAUST BLOWER TRUNKING BENT REPAIR WORK TO BE CARRIED OUT AND 16 NOS OF SS NUT BOLTS CORRODED/DAMAGED TO BE RENEWED

1

-

-

... More
DL NO: 61 DECK DRAIN 02 IN NOS OF DECK DRAIN IN PORT AND STBD CHOKED TO BE REPAIRED

2

-

-

... More
DL NO: 62 DECK DRAIN PROVISIONING OF 03 DECK DRAINS IN PORT AND STBD CATWALK AND NEAR ENGINE STYLET BELOW LADDER

3

-

-

... More
DL NO: 63 LUB OIL TANK MANUFACTURING AND FITMENT OF 02 IN NOS. STORAGE TANKS FOR LUB OIL AND HYDRAULIC OIL OF 150 LTRS CAPACITY IN ASP TO BE CARRIED OUT.

2

-

-

... More
DL NO: 64 EXHAUST TRUNKING ENGINE ROOM SUPPLY TRUNKING HATCH HINGES TO BE RELOCATED.

1

-

-

... More
DL NO: 65 UNDERWATER FENDERING FITMENT OF FIXED UNDERWATER FENDERING TO BE CARRIED OUT, MAT- RUBBER D FENDER

1

-

-

... More
DL NO: 66 SEWAGE DISCHARGE/SANITARY SYSTEM 01 IN NO. DIRECT OVERBOARDL LINE TO BE PROVIDED FOR DIRECT OVERBOARD DISCHARGE OF SEWAGE IN CASE OF STP MALFUNCTIONING.

1

-

-

... More
DL NO: 67 D-FENDER AFT SIDE D-SHAPE RUBBER FENDER DAMAGED/UPROOTED. TO BE RENEWED.

1

-

-

... More
DL NO: 68 LAGGING LAGGING TO BE CARRIED OUT AT SCATTERED LOCATIONS. AREA 30 MTR2 MAT - MFMB

30

-

-

... More
DL NO: 69 SANITARY SYSTEM DECK DRAIN OF GALLEY CHOKED. TO BE CLEARED.

1

-

-

... More
DL NO: 70 DECK COVERING SILLER COAT OF MACHROTECH TO BE CARRIED OUT IN BRIDGE AND LIVING SPACE. AREA – 30 MTR2

30

-

-

... More
DL NO: 71 AIR PRESSURE TEST ALL TANKS, COFFERDAMS AND SEA TUBES WHICH ARE REPAIRED BY BUILD UP/RENEWAL OR ARE SUBJECTED TO HOT WORK FOR WELDING OF PAD PIECE/ FOUNDATION ON ANY OF THEIR BOUNDARIES ARE TO BE AIR PRESSURE TESTED. THE PRESSURE APPLIED SHOULD NEVER EXCEED THAT WHICH CORRESPONDS TO A PRESSURE OF 0.2 KG/SQCM (2 METERS OF WATER OR 0.20 BARS OR 2.1/2 IBF/ SQ IN).

1

-

-

... More
DL NO: 72 WATER PURIFIER 01 IN NO WATER PURIFIER NON OPS. TO BE RENEWED.

1

-

-

... More
DL NO: 73 WATER COOLER 01 IN NO WATER COOLER NON OPS. TO BE REPAIRED.

1

-

-

... More
DL NO: 74 BUNK MATTRESS 12 IN NO.MATTRESS DAMAGED/TORN. TO BE RENEWED.

12

-

-

... More
ENGINEERING

-

-

-

... More
DL NO:1001-1014 02 IN NOS MAIN ENGINES MAKE- CATERPILLAR/GMMCO TYPE- C32 1000HOURLY CARRY OUT INSPECTION OF ENGINE VALVE ROTATORS INSPECT/ADJUST VALVE LASH CARRY OUT REPLACEMENT OF BELTS REPLACE FLEXIBLE HOSES AND CLAMPS REPLACE ENGINE AIR CLEANER ELEMENT CLEAN/ REPLACE ENGINE CRANKCASE BREATHER CHANGE ENGINE OIL AND FILTER REPLACE FUEL SYSTEM PRIMARY FILTER (WATER SEPERATOR) ELEMENT REPLACE FUEL SYSTEM SECONDARY FILTER INSPECT/ CLEAN/ OVERHAUL AFTERCOOLER CONDENSATE DRAIN VALVE CHEMICALLY CLEAN AND PRESSURE TEST AFTERCOOLER REPLACE CLOSED CRANKCASE VENTILATION (CCV) FUMES DISPOSAL FILTER NSPECT/CLEAN TURBOCHARGER

2

-

-

... More
DL NO: 1015-1021 02 IN NOS DIESEL ALTERNATOR MAKE- KIRLOSKAR TYPE- 6R 1080 T 1000 HOURLY CHANGE ENGINE OIL AND LUB OIL FILTER CARTRIDGE. REPLACE FUEL FILTER CARTRIDGE CARRY OUT CLEANING OF FUEL STRAINER OF FUEL FEED PUMP REPLACE DRIVE BELTS AND ADJUST TENSION CARRY OUT CHEMICAL CLEANING AND PRESSURE TESTING OF HEAT EXCHANGER CARRY OUT CLEANING OF CENTRIFUGE CLEANER CARRY OUT REPLACEMENT OF DRY TYPE AIR CLEANER

2

-

-

... More
DL NO: 1022-1029 02 NOS. HRP SYSTEM MAKE- HRP THRUSTER SYSTEMS MODEL- HRP 4111 WM 1000 HOURLY REPLACE HYDRAULIC OIL FILTERS INSPECT FLEXIBLE COUPLING ELEMENT CARRY OUT TIGHTENING OF CARDON SHAFT BOLTS CARRY OUT ANALYSIS OF HYDRAULIC OIL CONDITION. CHANGE OIL CHECK WORM WHEEL AND WORM CARRY OUT TIGHTENING OF ALL FASTENERS CHECK PROPELLER CONDITION. REPAIR AS NECESSARY CHECK TIGHTENING OF BOLTS AND NUTS (OUT BOARD) CARRY OUT GREASING OF SHAFT LINE BEARINGS

2

-

-

... More
DL NO: 1030-1035 01 IN NO FUEL CENTRIFUGE MAKE- ALFA LAVAL TYPE- MAB 103B-24 1500 HOURLY INSPECT WORM WHEEL SHAFT AND GEAR HOUSING RENEW OIL LEVEL IN GEAR HOUSING CLEAN AND CHECK OF LOCK RING, BOWL HOOD, TOP DISC, GRAVITY DISC, BOWL DISC, DISTRIBUTOR, BOWL BODY, CORROSION, EROSION, CRACKS, DISC STACK PRESSURE . RENEW O RING AND SEALING CARRY OUT FUNCTIONAL CHECKS OF MONITORING EQUIPMENT. REPAIR AS NECESSARY

1

-

-

... More
DL NO: 1036-1039 01 IN NO LUB OIL CENTRIFUGE MAKE- ALFA LAVAL TYPE- MAB 103B-24 1500 HOURLY INSPECT WORM WHEEL SHAFT AND GEAR HOUSING CHECK WORM WHEEL AND WORM RENEW OIL LEVEL IN GEAR HOUSING CLEAN AND CHECK OF LOCK RING, BOWL HOOD, TOP DISC, GRAVITY DISC, BOWL DISC, DISTRIBUTOR, BOWL BODY, CORROSION, EROSION, CRACKS, DISC STACK PRESSURE .

1

-

-

... More
DL NO: 1040-1041 01 IN NO LUB OIL CENTRIFUGE MAKE- ALFA LAVAL 1500 HOURLY RENEW O RING AND SEALING CARRY OUT FUNCTIONAL CHECKS OF MONITORING EQUIPMENT. REPAIR AS NECESSARY

1

-

-

... More
DL NO: 1042-1045 20 TPH SUBMERSIBLE PUMP MODEL-M120N(M) QTY - 04 500 HOURLY EXAMINE INTERNAL WEAR CHECK RUNNING CLERANCE CHECK OIL CONDITION FOR MECHANICAL SEAL CHECK DIFFUSER FOR WEAR AND CLERANCE

4

-

-

... More
DL NO:1046-1050 37 TPH DIESEL DRIVEN PUMP MODEL- SH65-16N1-DG S2-316 QTY - 02 500 HOURLY CHECK INJECTION NOZZLE CHECK INJECTION PUMP ADJUST VALVE CLERANCE OF INTAKE AND EXHAUST VALVE CHECK THE SURFACE OF BRUSH AND SLIP RING CHECK AND REPLACE FUEL PIPING

2

-

-

... More
DL NO: 1051 CO2 SYSTEM YEARLY CARRY OUT WEIGHING OF CO2 BOTTLES. REFILL BOTTLES IF NET LOSS OF MORE THAN 10%, BOTTLES TO BE REFILLED IT SHALL BE REFILLED AFTER PRESSURE TESTING UPTO 1.5 TIMES OF WORKING PRESSURE.QTY- 04 IN NOS

4

-

-

... More
DL NO: 1052-1053 OILY BILGE SEPERATOR YEARLY CARRY OUT FUNCTIONAL CHECKS OF EQUIPMENT, REPAIR/ RENEW COMPONENT AS NECESSARY. TO BE CLEANED INTERNALLY. COATING TO BE CHECKED FOR INTACT PHYSICAL CONDITION, IF DEFECTIVE, IT SHALL BE REPAIRED TO PREVENT SEVERE CORROSION. SEE ALSO REPAIR OF COATING

1

-

-

... More
DL NO: 1054-1057 AIR COMPRESSOR MAKE - INGERSOLL TYPE- RECIPROCATING MODEL- 251 X 5 QTY - 02 1500 HOURLY CARRY OUT FUNCTIONAL CHECKS OF PRESSURE SWITCHES, CUT- IN AND CUT-OFF PRESSURE. RENEW/ REPAIR COMPONENT AS NECESSARY. DISMANTLE BREATHER VALVE, CLEAN AND CHECK FOR ALL CORRECT SEATING. EXAMINE THE LUBRICATING OIL IN THE CRANKCASE SUMP, RENEW IF NECESSARY. CHECK ALL PIPELINES FOR LEAKS AT JOINTS, RENEW PACKING AND PIPE LINE AS NECESSARY.

2

-

-

... More
DL NO: 1058AIR BOTTLES SR ROUTINES PRESSURE TESTING OF AIR BOTTLES TO BE CARRIED OUT UPTO 45 KG/CM2.QTY- 02 IN NOS, CAPACITY- 300 LTRS

2

-

-

... More
DL NO: 1059 HP AIR SYSTEM VALVES SIR ROUTINES 04 IN NO. AIR BOTTLE VALVES NOT HOLDING. TO BE OVERHAULED. TYPE- NEEDLE VALVE

4

-

-

... More
DL NO: 1060 HP AIR SYSTEM SR ROUTINES HP AIR SYSTEM VALVES HARD TO OPERATE AND NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SD, SIZE- 30 MM ,QTY- 05,TEST PRESSURE-60 PSI.

5

-

-

... More
DL NO: 1061 HP AIR SYSTEM SR ROUTINES HP AIR SYSTEM PIPE LINES THINNED AND PERISHED AT VARIOUS PLACES, TO BE RENEWED. WORK INVOLVES REMOVAL/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS AND FLANGE GASKETS TO BE RENEWED(MS).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING MAT- MS , SIZE- 50 MM ,LENGTH-10 MTR,TEST PRESSURE-500 PSI.

10

-

-

... More
DL NO: 1062 STARTING AIR SYSTEM SR ROUTINES MAIN ENGINE STARTING AIR SYSTEM VALVES HARD TO OPERATE AND NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SD, SIZE- 50 MM ,QTY- 03,TEST PRESSURE-60 PSI.

3

-

-

... More
DL NO: 1063 ADVANCED FIRE FIGHTING SYSTEM SR ROUTINES FUNCTIONAL CHECKS OF ADVANCED FIRE FIGHTING SYSTEM TO BE CARRIED OUT AND PROVED FOR SATISFACTORY PERFORMANCE. REPAIR/ RENEWAL OF COMPONENTS IF NECESSARY.

1

-

-

... More
DL NO: 1064 FIRE MAIN SYSTEM VALVES SR ROUTINES FOLOWING FIRE MAIN SYSTEM DISCHARGE VALVES NOT HOLDING. TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/ OVERHAULING/ RENEWAL/REFITTING AND PRESSURE TESTING. ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ). FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING. TYPE-ANGLE VALVE, SIZE- 90MM, QTY-04, NOS TYPE- FLAP VALVE DIA- 15 MM,QTY- 06 NOS TYPE- GATE VALVE DIA- 25MM, QTY- 06 IN NOS, LOCATION- SCATTERED

16

-

-

... More
DL NO: 1065 FIRE MAIN MANIFOLD SR ROUTINES FIRE HYDRANT MANIFOLD VALVE NOT HOLDING. TO BE OVERHAULED. QTY- 03 IN NO

3

-

-

... More
DL NO: 1066 FIRE HYDRANTS SPECIFIC DEFECTS 08 IN NO FIRE HYDRANTS NOT HOLDING. TO BE OVERHAULED

8

-

-

... More
DL NO:1067 FIRE MAIN SYSTEM ISOLATING VALVES SPECIFIC DEFECTS 04 IN NOS FIREMAIN ISOLATING VALVE HOT HOLDING. TO BE OVERHAULED.

4

-

-

... More
DL NO: 1068 CONTROLS AND INSTRUMENTATION SR ROUTINES FUNCTIONAL CHECKS ON CONTROLS OF BOTH MAIN ENGINES AND DIESEL ALTERNATORS TO BE CARRIED OUT. REPAIR/ RENEW COMPONENTS AS NECESSARY.

2

-

-

... More
DL NO: 1069 CONTROLS AND INSTRUMENTATION SR ROUTINES BOTH ENGINES PARAMETER DISPLAY SCREEN TO BE CALIBRATED TO SHOW CORRECT READINGS. QTY - 03 NOS EACH ENGINE. RENEW IF NECESSARY.

3

-

-

... More
DL NO: 1070 INSTRUMENTATION GAUGES SR ROUTINES 13 IN NOS SUCTION PRESSURE GAUGES, RANGE -0 TO 1 KG/CM2 AND 13 IN NOS DISCHARGE PRESSURE GAUGE, RANGE - 0 TO 10 KG/CM2 NOT SHOWING PRESSURE, GAUGE TO BE CALIBRATED/ RENEWED.

26

-

-

... More
DL NO: 1071 INSTRUMENTATION GAUGE PIPE LINES SR ROUTINES INSTRUMENTATION PIPE LINES OF VARIOUS MACHINERIES HOLED AND PERISHED AT VARIOUS PLACES, TO BE RENEWED INCLUDING END FITTINGS. LENGTH- 15 MTR, SIZE-8 MM.

15

-

-

... More
DL NO: 1072 HAND PUMPS SR ROTINES 07 IN NOS HAND PUMPS NOT OPERATING. PUMPS TO BE OVERHAULED. LOCATION- SCATTERED, TYPE- SEMI ROTARY, CAP- 90 LTRS/ MIN.

7

-

-

... More
DL NO: 1073 BILGE WATER SYSTEM SIR ROUTINES MAIN ENGINE ROOM AND HRP ROOM PUMPING OUT ARRANGEMENT PIPE LINE TO BE CLEANED/ RENEW AS NECESSARY. SYSTEM TO BE PROVED FOR SATISFATORY PERFORMANCE

1

-

-

... More
DL NO: 1074 SRP COOLING S/W PUMP SR ROUTINES 02 IN NOS SRP COOLING SEA WATER PUMPS TO BE OVERHAULED AND PROVE FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
DL NO: 1075 SRP COOLING S/W PIPE LINE SR ROUTINES SEA WATER PIPE LINE OF SRP COOLING PERISHED AT VARIOUS PLACES. TO BE RENEWD INCLUDING END ADAPTORS. MAT CUNI FOR PIPE AND BRASS FOR END ADAPTORS.. DIA - 40 MM , LENGTH - 15 MTRS DIA - 20 MM , LENGTH - 15 MTRS

30

-

-

... More
DL NO: 1076 SRP HYDRAULIC PUMP SR ROUTINES BOTH SRP HYDRAULIC OIL PUMP TO BE OVERHAULED AND PROVED FOR SATISFACTORY PERFORMANCE. QTY - 02 NOS

2

-

-

... More
DL NO: 1077 SRP UNIT SR ROUTINES LUB OIL LEAKAGE OBSERVED FROM VARIOUS PORTS OF BOTH SRP UINTS TO BE RECTIFIED. RENEW/ REPAIR FITTINGS/ PIPELINE AS NECESSARY.

1

-

-

... More
DL NO; 1078 SRP OIL TANK SR ROUTINES BOTH SRP HYDRAULIC OIL TANKS TO BE CLEANED AND PAINTED. QTY - 02 TANKS

2

-

-

... More
DL NO: 1079 SEA WATER SYSTEM SR ROUTINES CLEAN/INSPECT SEA CHEST VALVES OF MAIN ENGINES AND DIESEL ALTERNATORS, REPAIR AS NECESSARY, BUTTER FLY VALVE QTY- 02, SIZE- 65 MM, ANGLE VALVE QTY- 02 IN NOS, SIZE- 65 MM

2

-

-

... More
DL NO; 1080 SEA WATER SYSTEM SR ROUTINES INSPECT/REPLACE ZINC RODS/ CORROSION PLUGS ON SEA WATER SYSTEM

1

-

-

... More
DL NO: 1081 SEA WATER SYSTEM SPECIFIC DEFECT SEA CHEST AIR VENT LINE OF BOTH SEA CHEST CORRODED AND PERISHED. PIPE LINE TO BE RENEWED.

1

-

-

... More
DL NO: 1082 MAIN ENGINE SEA WATER PUMP SR ROUTINES BOTH MAIN ENGINE SEA WATER PUMP TO BE OVERHAULED AND PROVED FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
DL NO: 1083 MAIN ENGINE SEA WATER SYSTEM SR ROUTINES BOTH MAIN ENGINE SEA WATER OVERBOARD VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING /RENEWAL/REFITTING AND PRESSURE TESTING. ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ). FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING.

2

-

-

... More
DL NO: 1084 MAIN ENGINE SEA WATER SYSTEM PIPE LINE SR ROUTINES BOTH MAIN ENGINE SEA WATER SYSTEM PIPE LINE TO BE CHEMICALLY CLEANED AND PRESSURE TESTED. RENEW PIPE LINE INCLUDING END FITTINGS IF NECESSARY. DIA - 80 MM , LENGTH - 10 MTRS, MAT - CUNI

10

-

-

... More
DL NO: 1085 DIESEL ALTERNATOR SEA WATER PUMP SR ROUTINES BOTH DA SEA WATER PUMP TO BE OVERHAULED AND PROVED FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
DL NO: 1086 DIESEL ALTERNATOR SEA WATER SYSTEM SR ROUTINES BOTH DA SEA WATER SYSTEM OVERBOARD VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING /RENEWAL/REFITTING AND PRESSURE TESTING. ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ). FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING.

2

-

-

... More
DL NO: 1087 DIESEL ALTERNATOR SEA WATER SYSTEM PIPE LINE SR ROUTINES BOTH DA SEA WATER SYSTEM PIPE LINE TO BE CHEMICALLY CLEANED AND PRESSURE TESTED. RENEW PIPE LINE INCLUDING END FITTINGS IF NECESSARY. DIA - 40 MM , LENGTH - 10 MTRS, MAT - CUNI

1

-

-

... More
DL NO: 1088 DIESEL ALTERNATOR LUB OIL DRAIN LINE SR ROUTINES BOTH DA LUB OIL DRAIN LINE TO BE CHEMICALLY CLEANED AND PRESSURE TESTED. RENEW PIPE LINE INCLUDING END FITTINGS IF NECESSARY. DIA - 20 MM , LENGTH - 10 MTRS, MAT - MS

10

-

-

... More
DL NO: 1089 MAIN ENGINE FUEL SYSTEM VALVES SR ROUTINES BOTH MAIN ENGINE FUEL SHUT OFF VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/ RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SPRING LOADED ANGLE VALVE, SIZE- 62 MM ,QTY- 03,TEST PRESSURE-60 PSI.

3

-

-

... More
DL NO: 1090 DA FUEL SYSTEM VALVES SR ROUTINES BOTH D/A FUEL SHUT OFF VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SPRING LOADED ANGLE VALVE, SIZE- 62 MM ,QTY- 02,TEST PRESSURE-60 PSI.

2

-

-

... More
DL NO: 1091 FUEL SYSTEM VALVES SR ROUTINES FOLLOWING VALVES NOT HOLDING, TO BE OVERHAULED. (A) PORT RU TANK SUCTION VALVE , (B) FUEL CENTRIFUGE BY PASS VALVE, (C) STBD STORAGE TANK MAIN SUCTION QUICK CLOSING VALVE, QTY- 02, SIZE- 50 MM (D) SDNR VALVE, QTY- 06 IN NOS , SIZE- 32 MM (E) NON RETURN VALVE, QTY- 04 IN NOS, SIZE- 20 MM (F) BALL VALVE, QTY - 06 NOS, SIZE 20 MM (G) FUEL TRANSFER PUMP SUCTION AND DISCHARGE VALVE - QTY 04 , DIA - 40 MM

24

-

-

... More
DL NO: 1092 QUICK SHUT OFF VALVES SR ROUTINES CABLE WIRE OF 06 IN NOS QUICK SHUT OFF VALVE TO BE REPAIRED/RENEWD INCLUDING RENEWAL/ REPAIR OF ALL MOVABLE COMPONETS AND APPLICATION OF LUBRICANT.

6

-

-

... More
DL NO: 1093 FUEL STORAGE TANK SR ROUTINES 02 IN NO. FUEL STORAGE TANK TO BE CLEANED AND ONE COAT OF OM 750 TO BE APPLIED. WORK INVOLVES: (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).

2

-

-

... More
DL NO: 1094 FUEL RU TANK SR ROUTINES 02 IN NOS. MAIN ENGINE FUEL RU TANK TO BE CLEANED AND ONE COAT OF OM 750 TO BE APPLIED. WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).

2

-

-

... More
DL NO: 1095 LUB OIL RU TANK SR ROUTINES 01 IN NOS. LUBRICATING OIL RU TANK TO BE CLEANED . WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT.TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN.(E)FLUSHING THROUGH TO BE CARRIED OUT POST PAINTING WORK.

1

-

-

... More
DL NO: 1096 FOAM TANK SR ROUTINES 01 IN NO. FOAM TANK TO BE CLEANED AND SURFACE TO BE PREPARED AND PAINTED. 01 COAT EROP 02 COATS OF CTE. WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).(E)FLUSHING THROUGH TO BE CARRIED OUT POST PAINTING WORK.

1

-

-

... More
DL NO: 1097 FRESH WATER OVERHEAD TANK SR ROUTINES 02 IN NOS. FRESH WATER OVERHEAD TANK TO BE CLEANED, SURFACE PREPARED AND PAINTED. (01 COAT EROP, 02 COATS OF COLD BITUMINOUS. WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).(E)FLUSHING THROUGH TO BE CARRIED OUT POST PAINTING WORK.

2

-

-

... More
DL NO: 1098 FRESH WATER STORAGE TANK SR ROUTINES 01 IN NOS. FRESH WATER STORAGE TANK TO BE CLEANED, SURFACE PREPARED AND PAINTED. (01 COAT EROP, 02 COATS OF COLD BITUMINOUS.WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).(E)FLUSHING THROUGH TO BE CARRIED OUT POST PAINTING WORK.

1

-

-

... More
DL NO: 1099 DOMESTIC FRESH WATER PUMP QTY - 02 SR ROUTINES BOTH DOMESTIC FRESH WATER PUMP TO BE OVERHAULED AND PROVED FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
DL NO: 1100 DOMESTIC FRESH WATER SYSTEM PIPE LINE SR ROUTINES CHEMICALLY CLEAN AND PRESSURE TEST FRESH WATER SYSTEM PIPE LINE. RENEW PIPE LINE IF NECESSARY. DIA - 40 MM , LENGTH - 20 MTRS, MAT - MS

20

-

-

... More
DL NO: 1101 DOMESTIC SEA WATER PUMP QTY - 02 SR ROUTINES BOTH DOMESTIC SEA WATER PUMP TO BE OVERHAULED AND PROVED FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
DL NO: 1102 DOMESTIC SEA WATER SYSTEM PIPE LINE SR ROUTINES CHEMICALLY CLEAN AND PRESSURE TEST DOMESTIC SEA WATER SYSTEM PIPE LINE. RENEW PIPE LINE IF NECESSARY. DIA - 40 MM , LENGTH - 20 MTRS, MAT - CU NI

20

-

-

... More
DL NO: 1103 FUEL FILLING SYSTEM SR ROUTINES 04 IN NOS FLANGES TO BE MANUFATURED AS PER FITTING.

4

-

-

... More
DL NO: 1104 FUEL FILLING SYSTEM VALVES SR ROUTINES 05 IN NOS FUEL FILLING VALVE TO BE OVERHAULED. LOCATION - SCATTERED.

5

-

-

... More
DL NO: 1105 FRESH WATER FILLING HYDRENT SR ROUTINES FRESH WATER FILLING HYDRENT PIPE LINE AND HYDRENT TO BE REPAIRED/ RENEWED.

1

-

-

... More
DL NO: 1106 DURETTES SR ROUTINES DURETTES OF VARIOUS SYSTEM PIPE LINES DETERIORATED AND PERISHED, TO BE RENEWED . ALL SECURING JUBILEE CLIPS/ CLAMPS TO BE RENEWED. Dia (mm) Length (mtr) 25 6 50 8 76 12 100 8 130 6

5

-

-

... More
DL NO: 1107 BILGE SR ROUTINES BILGES OF MAIN ENGINE COMPARTMENT AND SRP COMPARTMENT TO BE CLEANED THROUGHLY AND TO BE PAINTED AS PER PAINT SCHEME.

1

-

-

... More
DL NO: 1108 PAINTING SR ROUTINES ALL PIPE LINES, VALVES REPAIRED/RENEWED TO BE PAINTED AS PER PAINT SCHEME.

1

-

-

... More
DL NO: 1109 GAUGE GLASS SPECIFIC DEFECT 04 IN NOS GAUGE GLASSES OF FUEL TANK AND FRESH WATER TANK TO BE RENEWED.

4

-

-

... More
DL NO: 1110 ELECTRONIC TANK LEVEL GAUGES SPECIFIC DEFECT 02 IN NOS RU TANK LEVEL GAUGES NOT WORKING. DEFECT TO BE RECTIFIED

2

-

-

... More
DL NO: 1111 MISCELLANEOUS MISC NUTS/ ADAPTORS OF VARIOUS SYSTEMS TO BE MANUFACTURED AS PER SAMPLE. MAT- BRASS, QTY - 40 NOS

40

-

-

... More
DL NO: 1112 DOCKING ROUTINE CARRYOUT COMPLETE SHAFT INSPECTION OF SHAFT OUTBOARD LENGTH AND PROPELLERS. CLEAN PROPELLERS. (HRP SYSTEM)

1

-

-

... More
DL NO: 1113 DOCKING ROUTINE CHECK CONDITION OF THREADS FOR PROPELLER NUTS AND MAKE CHECK MARKS.

1

-

-

... More
DL NO: 1114 DOCKING ROUTINE RENEW THE ZINC PROTECTORS IF WEAR DOWN IS MORE THAN 50%

1

-

-

... More
DL NO; 1115 DOCKING ROUTINE REMOVE ALL UNDERWATER GRATINGS, REPAIR/ RENEW AS NECESSARY.

1

-

-

... More
DL NO: 1116LAGGING HOT LAGGING IS TO BE CARRIED OUT AT VARIOUS LOCATIONS. LENGTH- 07 MTRS

7

-

-

... More
ELECTRICAL

-

-

-

... More
DL NO: 201 ALTERNATOR (75 KVA) BOTH DA BOTH INTERIOR & EXTERIOR PART OF THE ALTERNATOR TO BE BLOWN THROUGH WITH DRY COMPRESSED AIR. CHECK BEARING AND WINDING, REPLACE AS NECESSARY. CARRY OUT CLEANING OF EQUIPMENT WITH WHITE SPIRIT.OUTPUT TO BE CHECKED POST COMPLETION.

2

-

-

... More
DL NO: 202 MAIN SWITCH BOARD CARRY OUT CLEANING OF EQUIPMENT WITH WHITE SPIRIT AND COMPRESSED AIR, CLEAN BUS BARS..OUTPUT TO BE CHECKED POST COMPLETION.

1

-

-

... More
DL NO: 203 415 V/ 24 V DC RECTIFIER PANEL CARRY OUT CLEANING OF EQUIPMENT WITH WHITE SPIRIT.OUTPUT TO BE CHECKED POST COMPLETION.QTY- 03 IN NOS

3

-

-

... More
DL No:204 WINDOW WIPER 04 IN NOS WINDOW WIPER NOT WORKING. DEFECT TO BE RECTIFIED

4

-

-

... More
DL NO: 205 SOUND POWER TELEPHONE SOUND POWER TELEPHONE NOT OPERATIONAL. DI/DR TO CARRIED OUT, QTY- 04 IN NOS

4

-

-

... More
DL NO: 206 TRANSFORMER RECTIFIER TRANSFORMER RECTIFIER NOT OPERATIONAL. DI/DR TO CARRIED OUT. QTY- 01 IN NO

1

-

-

... More
DL NO:207 MAIN BROAD CAST MAIN BROADCAST NOT OPERATIONAL. DI/DR TO CARRIED OUT.

1

-

-

... More
DL NO: 208 SPLIT A/C SPLIT AC NOT OPERATIONAL. DI/DR TO CARRIED OUT.QTY- 01 IN NO

1

-

-

... More
DL NO: 209 BATTERY SERVICEABILITY CHECK OF12 IN NOS. BATTERY (12 V 180AH) TO BE CARRIED OUT.

12

-

-

... More
DL NO:210 VHF SET NOT GIVE OUT PUT. TO BE CHECKED

1

-

-

... More
DL NO: 2011 MOTORS CARRY OUT OVERHAULING OF FOLLOWING EQUIPMENTS (A) STEERING MOTOR 02 NOS. (B) AIR COMPRESSORMOTOR 02 NOS. (C) FIRE PUMP MOTOR 01 NOS. (D) FRESH WATER PUMP MOTOR 02 NOS. (E) SEA WATER PUMP MOTOR 02 NOS. (F) ENGINE ROOM SUPPLY FAN MOTOR (G) ENGINE ROOM EXHAUST FAN MOTOR (H) STP PUMP MOTOR

12

-

-

... More
DL NO: 212 PANEL CARRY OUT MAINTENANCE ROUTINE OF FOLLOWING STARTING PANELS (A) DA STARTING PANEL (B) BOTH ENGINE STARTING PANEL (C) NAVIGATION LIGHTS PANEL (D)BOTH SRP COOLING PUMP PANEL (E)BOTH SRP COOLING PUMP PANEL (F)WHEEL HOUSE AND SRP ROOM CANSOLE PANEL (G)MCR ALARM PANEL

11

-

-

... More
DL NO: 213 GENERAL LIGHTING MASTER CABIN , ENGINE DRIVER ROOM, GALLEY, WHEEL HOUSE, MAIN LOBBY,ENGINE ROOM AND NAVIGATION LIGHTS TO BE CHECKED AND REPLACE AS NECESSARY.

1

-

-

... More
DL NO: 214 STARTERS CARRY OUT OVERHAULING OF FOLLOWING EQUIPMENTS STARTERS (A) STEERING MOTOR STARTER 02 NOS. (B) AIR COMPRESSOR MOTOR STARTER 02 NOS. (C) FIRE PUMP MOTOR STARTER 01 NOS. (D) FRESH WATER PUMP MOTOR STARTER 02 NOS. (E) SEA WATER PUMP MOTOR STARTER 02 NOS. (F) ENGINE ROOM SUPPLY FAN MOTOR STARTER (G) ENGINE ROOM EXHAUST FAN MOTOR STARTER (H) STP CONTROL STARTER

14

-

-

... More
DL NO: 215 24V EMERGENCY LIGHTING 24V EMERGENCY LIGHTING NOT OPERATIONAL. DEFECT TO BE RECTIFIED.

1

-

-

... More
DL NO: 216 SENSORS AND INDICATORS FOLLOWING SENSORS AND INDICATORS NOT WORKING. DI/DR TO BE CARRIED OUT. (A)BOTH FRESH WATER AND BUNKER TANK FUEL INDICATOR (B)OWS ELECTRONIC SENSOR (C)SRP(STBD) LUBE OIL LEVEL SENSOR (D)STBD M/E LUBE OIL AND FRESH WATER TEMPERATURE SENSOR

7

-

-

... More
DL NO: 217 FIRE MAIN PORT AND STBD FIRE MAIN PUMP DISCHARGE NOZZLE AT BRIDGE TOP NOT WORKING FROM REMOTE POSITION. DI/DR TO BE CARRIED OUT.

2

-

-

... More
DL NO; 218 MOTORS OVERHAULING OF FOLLOWING MOTORS TO BE CARRIED OUT (A) FOAM GUN ROTATING MOTOR 02 IN NOS. (B) ANCHOR WINDLASS MOTOR 01 IN NO. (C) CAPSTAN MOTOR 01 IN NO. D) SRP ROOM SUPPLY FAN 01 IN NO.

5

-

-

... More
DL NO: 219 STARTERS CARRY OUT OVERHAULING OF FOLLOWING STARTERS (A) STEERING MOTOR STARTERS 02 IN NOS. (B) AIR COMPRESSOR MOTOR STARTERS 02 IN NOS. (C) FOAM GUN ROTATING MOTOR STARTERS 02 IN NOS. (D) ANCHOR WINDLASS MOTOR STARTER 01 IN NO. (E) FIRE PUMP MOTOR STARTER 01 IN NO. (F) FRESH WATER PUMP MOTOR STARTERS 02 IN NOS. (G) SEA WATER PUMP MOTOR STARTERS 02 IN NOS. (H) ENGINE ROOM SUPPLY FAN MOTOR STARTER 01 IN NO. (J) ENGINE ROOM EXHAUST FAN MOTOR STARTER 01 IN NO. (K)STP PUMP MOTOR STARTER 01 IN NO. (L)CAPSTAN MOTOR STARTER 01 IN NO.

16

-

-

... More
DL NO: 220 WHEATHER DECK LIGHTINGS ALL WHEATHER DECK LIGHT AND FITTING TO BE CHECKED AND REPLACED

1

-

-

... More
DL NO: 221 BUNK LIGHTS BUNK LIGHTS DEFECTIVE IN VARIOUS PLACES TO BE REPLACED WITH NEW ONE

1

-

-

... More
DL NO: 222 LIGHTING SOCKETS LIGHTING SOCKETS IN VARIOUS PLACES DEFECTIVE .TO BE REPLACED.

1

-

-

... More
DL NO: 223 NAVIGATIONAL LIGHT CONTROL PANEL OVERHAULING OF NAVIGATIONAL LIGHT CONTROL PANEL TO BE CARRIED OUT. ALL NAVIGATIONAL LIGHTS AND FITTINGS TO BE TO BE CHECKED AND REPLACED.

1

-

-

... More
DL NO: 224 GALLEY RANGE OVERHAULING OF GALLEY RANGE CONTROL PANEL TO BE CARRIED OUT. HOT PLATE ELEMENT TO BE REPLACED WITH NEW ONE.

1

-

-

... More
DL NO: 225 FLOOD LIGHTS 05 IN NO. FLOOD LIGHTS DEFECTIVE.TO BE REPLACED

5

-

-

... More
DL NO: 226 LIGHT FITTINGS LIGHT FITTINGS IN VARIOUS PLACES CORRODED & DEFECTIVE TO BE REPLACED WITH NEW ONE

1

-

-

... More
MATERIALS/SPARES

-

-

-

... More
HULL

-

-

-

... More
DL NO:4 UNDERWATER HULL RENEW OF STEEL AT DEFECTIVE AREAS AS PER THE SURVEY REPORT OF NSRY SURVEY TEAM.

15

-

-

... More
DL NO: 5 UNDERWATER HULL PAINT CONDITION TO BE INSPECTED AND RESTORED IF NECESSARY AS PER NO 20/03 OR LLPS. (AREA :U/W 324 SQMTR INCLUDING BOOT TOP)

324

-

-

... More
DL NO: 7 SACRIFICIAL ANODES SACRIFICIAL ANODES ON UNDERWATER HULL, KNORT NOZZLES AND SEA CHESTS TO BE RENEWED IF CONSUMED MORE THAN 50%. DETAILS OF ANODES AS FOLLOWS: (A) MK I- 16 NOS (UW HULL) (B) MK-VI- 06 NOS (PROPELLER NOZZLES AND SEA TUBE)

22

-

-

... More
DL NO: 8 DOCKING ROUTINES REMOVE, CLEAN, PAINT AND REFIT THE EDDY PLATE AND ROPE GUARD.

1

-

-

... More
DL NO: 9 TANK TOPS VISUAL SURVEY OF UNDER MENTIONED TANKS TO BE CARRIED OUT. JOB INVOLVES SURFACE PREPARATION TO BARE METAL OF ENTIRE BULHEADS, STIFFENERS. PAINT SCHEME TO BE RESTORED POST SURVEY/ RENEWAL AS PER NO 20/03 OR LLPS AS PER THE DETAILS GIVEN BELOW. A) FORE PEAK TANK + CHAIN LOCKER - 30 sqmtrs 1. ZINC PHOSPHATE PRIMER (INTER PRIME 538). RED - DFT 75 - PSR(m2/Lt) 5.32 2. AKLYD FINISH . (INTER LAC 665) - WHITE - DFT 50 - PSR(m2/Lt) 6.72 B) FWD BALLAST TANK NO 1 - 60 sqmtrs 1. EPOXY PRIMER TIE COAT (INTERGARD 269). RED - DFT 50 - PSR(m2/Lt) 5.64 2. ABRASION RESISTANT ALUMINIUM PURE EPOXY. (INTERSHIELD 300) - BRONZE - DFT 150 - PSR(m2/Lt) 2.4 3. ABRASION RESISTANT ALUMINIUM - PURE. EPOXY (INTERSHIELD 300) - ALUMINIUM - DFT 150 - PSR(m2/Lt) 2.4

30

-

-

... More
C) FWD BALLAST TANK NO 2 - 60 sqmtrs 1. EPOXY PRIMER TIE COAT (INTERGARD 269) -. RED - DFT 50 - PSR(m2/Lt) 5.64 2. ABRASION RESISTANT ALUMINIUM PURE EPOXY. (INTERSHIELD 300) - BRONZE - DFT 150 - PSR(m2/Lt) 2.4 3. ABRASION RESISTANT ALUMINIUM - PURE. EPOXY (INTERSHIELD 300) - ALUMINIUM - DFT 150 - PSR(m2/Lt) 2.4

60

-

-

... More
D) FRESH WATER TANK (P/S) + GRAVITY TANK - 100 sqmtrs 1. EPOXY PHENOLIC TANK (INTERLINE 850) - . GREY - DFT 150 - PSR(m2/Lt) 3.55 2. EPOXY PHENOLIC TANK COATING (INTERLINE 850) - WHITE - DFT 150 - PSR(m2/Lt) 10.64 3. EPOXY PHENOLIC TANK COATING (INTERLINE 850) - WHITE - DFT 150 - PSR(m2/Lt) 3.55

100

-

-

... More
DL NO: 10 TANK TOPS E) AFT BALLAST TANK P/S - 100 sqmtrs 1. EPOXY PRIMER TIE COAT (INTERGARD 269) -.RED - DFT 50 - PSR(m2/Lt) 5.64 2. ABRASION RESISTANT ALUMINIUM PURE EPOXY. (INTERSHIELD 300) - BRONZE - DFT 150 - PSR(m2/Lt) 2.4 3. ABRASION RESISTANT ALUMINIUM - PURE. EPOXY (INTERSHIELD 300) - ALUMINIUM - DFT 150 - PSR(m2/Lt) 2.4 F) ENGINE ROOM BILGES WITH FRAMES - 200 sqmtrs 1. ZINC PHOSPHATE PRIMER(INTERPRIME 538) . RED - DFT 80 - PSR(m2/Lt) 4.99 2. ALKYD FINISH . (INTER LACK 665) - WHITE - DFT 40- PSR(m2/Lt) 8.4 3. ALKYD FINISH. (INTER LACK 665) - WHITE - DFT 40- PSR(m2/Lt) 8.4 G) FUEL OIL TANK 1. EPOXY TANK HOLDING PRIMER (INTERLINE 982) . - PRIMROSE - DFT 40 - PSR(m2/Lt) 5.25 2. EPOXY TANK COATING (INTERLINE 704) - GREY - . DFT 100 PSR(m2/Lt) 3.71

550

-

-

... More
G) ENGINE ROOM STORE BILGES WITH FRAMES - 50 sqmtrs 1. ZINC PHOSPHATE PRIMER(INTERPRIME 538). RED - DFT 80 - PSR(m2/Lt) 4.99 2. ALKYD FINISH . (INTER LACK 665) - WHITE - DFT 40- PSR(m2/Lt) 8.4 3. ALKYD FINISH. (INTER LACK 665) - WHITE - DFT 40- PSR(m2/Lt) 8.4 H) ASP BILGES WITH FRAMES - 100 sqmtrs 1. ZINC PHOSPHATE PRIMER(INTERPRIME 538)- RED - DFT 80 - PSR(m2/Lt) 4.99 2. ALKYD FINISH . (INTER LACK 665) - WHITE - DFT 40- PSR(m2/Lt) 8.4 3. ALKYD FINISH . (INTER LACK 665) - WHITE - DFT 40- PSR(m2/Lt) 8.4

150

-

-

... More
J) FUEL OIL TANK - 250 sqmtrs 1. EPOXY TANK HOLDING PRIMER (INTERLINE 982) . - PRIMROSE - DFT 40 - PSR(m2/Lt) 5.25 2. EPOXY TANK COATING (INTERLINE 704) - GREY . DFT 100 PSR(m2/Lt) 3.71 3. EPOXY TANK COATING (INTERLINE 704) - PINK. DFT 100 PSR(m2/Lt) 7.42 4. EPOXY TANK COATING (INTERLINE 704) - PINK . DFT 100 PSR(m2/Lt) 3.71 5. EPOXY TANK COATING (INTERLINE 704) - GREY. DFT 100 PSR(m2/Lt) 3.71

250

-

-

... More
K) GRAVITY TANKS FITTED ON FUNNEL DECK (02 NOS) - 20 SQMTRS 1. EPOXY PHENOLIC TANK (INTERLINE 850) . GREY - DFT 150 - PSR(m2/Lt) 3.55 2. EPOXY PHENOLIC TANK COATING (INTERLINE 850) - WHITE - DFT 150 - PSR(m2/Lt) 10.64 3. EPOXY PHENOLIC TANK COATING (INTERLINE 850) - WHITE - DFT 150 - PSR(m2/Lt) 3.55

20

-

-

... More
DL NO: 11 VENTILLATION SYSTEM 02 IN NO. VENTILATION FLAPS ON SUPER STRUCTURE, CORRODED/BROKEN. TO BE RENEWED AS PER SAMPLE WITH HINGES AND WIRE MESH.

2

-

-

... More
DL NO: 12 MUSHROOM HEAD 04 IN NO. MUSHROOM HEAD SECURING ROUND PLATES CORRODED/METAL THINNED. TO BE RENEWED AND BOLTED AS PER SAMPLE. MAT. MS, THK-8MM.

4

-

-

... More
DL NO: 13 MUSHROOM HEAD 04 IN NO. MUSHROOMS TRUNKING, CORRODED/METAL THINNED. TO BE RENEWED/WELDED IN SITU. MAT. MS, THK-8MM. (HT-40CM, DIA. OF PIPE-70CM.EACH).

4

-

-

... More
DL NO: 15 TYRE FENDERS GI CHAIN FOR SECURING TYRE FENDERS ON SHIP SIDE(PORT & STBD) CORRODED/ THINNED. TO BE RENEWED.SIZE- DIA 16 MM, 2 RMTR EACH. (20 NOS)

20

-

-

... More
DL NO: 16 HULL SURVEY BULWARK AT DIFFERENT PLACES, ALL AROUND THE TUG, CORRODED/HOLED. TO BE RENEWED AS NECESSARY. (MAT. MS). APPROX. AREA 08 SQMTR.

8

-

-

... More
DL NO: 18 SANITARY SYSTEM BASE PLATE OF 02 IN NO. W/C, CORRODED/BROKEN. MAT.-MS THICK-10MM, AREA - 2SQMTR. W/C COMMODE TO BE RENEWED. W/C TO BE SECURED TO BASE PLATE WITH SS NUT&BOLTS/SCREWS.

2

-

-

... More
DL NO: 19 SANITARY SYSTEM CREW BATH ROOM WASH BASIN DRAIN PIPE CORRODED TO BE RENEWED . 03 MTRS LENGTH. MAT GI

3

-

-

... More
DL NO: 20 MISCELLANEOUS MASTER CABIN W/C DOOR FRAME PERISHED TO BE REPAIRED. JOB INVOLVES RENEWAL AND FITMENT OF 03 NOS DOOR HINGES (03 NOS)

3

-

-

... More
DL NO: 21 SANITARY SYSTEM CREW W/C FLUSHING LINE PERISHED AND BROKEN TO BE RENEWED. MAT. CUNI, LENGTH 04 MTRS. JOB INVOLVES RENEWAL OF FLUSHING VALVE (01 NO).

1

-

-

... More
DL NO: 22 WINDLASS 02 IN No. WINDLASS CANVAS COVERS PERISHED/TORN. TO BE RENEWED WITH 3M X 2M X 1.5M MEASURING CANVAS CLOTHS.

2

-

-

... More
DL NO: 23 W/T HATCH 06 IN NO. HATCH RETAINING SPRING CLIPS CORRODED/JAMMED. TO BE RENEWED WITH SPRING AND WELDED IN SITU.

6

-

-

... More
DL NO: 24 WINDLASS METALLIC COVER FOR WINDLASS CONTROL POST, CORRODED/HOLED. TO BE RENEWED/WELDED IN SITU. AS PER SAMPLE.

1

-

-

... More
DL NO: 25 WINDLASS OVERHAULING OF WINDLASS. PARTS TO BE DISMANTLED AND WORKING CONDITION OF THE PARTS TO BE CHECKED/TRIALED, AND SUSPECTED DEFECTIVE PARTS TO BE RENEWED AS NECESSARY. BRAKE LINING TO BE RENEWED. GREASING OF REQUIRED GREASING POINT TO BE CARRIED OUT. STRUCTURE OF WINDLASS (OIL CASING) CRACKED/ HOLED RESULTING IN LEAKAGE OF OIL . TO BE REPAIRED.

1

-

-

... More
DL NO: 26 FENDER BOW FENDER RUBBER (QTY - 04 NOS, LENGTH 1.5 MTRS EACH, WIDTH 0.26 MTRS, TYPE - RECTANGULAR ) BROKEN AND DAMAGED TO BE RENEWED

4

-

-

... More
DL NO: 27 ANCHOR & CHAIN CABLE ANCHOR AND ASSOCIATED CHAIN CABLE WITH FITTINGS TO BE SURVEYED. ANCHOR CHAIN CABLE TO BE LOAD TESTED. JOB INVOLVES REMOVAL OF ANCHOR AND CHAIN CABLE FROM CABLE LOCKER, CLEANING OFF ALL PAINT AND RUST USING MECHANICAL CHIPPING, SCRAPING ND WIRE BRUSH TOOLS , DISMANTLING/ DISCONNECTING OF LUGGLESS JOINING SHACKLES, SWIVEL ADAPTORS ETC., POST SURVEY, ENTIRE CHAIN CABLE AND ASSOCIATED FITTINGS TO BE RECOATED (PAINTED) WITH BITUMINOUS PAINT.( 01 ANCHOR, CHAIN CABLE 17.5 MM, FULL SHAKLE - 06 (3P + 3S), HALF SHAKLE - 04 (2P + 2S).

2

-

-

... More
DL NO: 28 EXHAUST TRUNKING 02 SQMTR. OF BELLOW COVER FOR EXHAUST TRUNKING PERISHED/TORN. TO BE RENEWED WITH NEW CLOTH. (MAT. CANVAS).

2

-

-

... More
DL NO: 29 SANITARY SYSTEM MASTER CABIN FLUSH VALVE PERISHED AND NON OPERATIONAL TO BE RENEWED

1

-

-

... More
DL NO: 30 ANCHOR WINDLASS ABNORMAL NOISE AND OIL LEAKAGE OBSERVED FROM ANCHOR WINDLASS OIL CHAMBER. OVERHAULING OF ANCHOR WINDLASS

1

-

-

... More
DL NO: 31 W/T HATCH 05 NOS WEATHER DECK W/T HATCH RUBBER PERISHED TO BE RENEWED. POST REPAIR CHALK TESTING TO BE CARRIED OUT.

5

-

-

... More
DL NO: 34 FRESH WATER SYSTEM CREW TOILET SHOWER PIPE PERISHED TO BE RENEWED(LENGTH OF PIPE 04 MTRS, MAT GI)

4

-

-

... More
DL NO: 35 MSCELLANEOUS CO2 EXTINGUISHER BRACKET OF FOLLOWING PLACES DAMAGED / BROKEN TO BE RENEWED AND WELDED INSITU. (A) BRIDGE (B) GALLEY

2

-

-

... More
DL NO: 36 FENDER 08 IN NOS TYRE FENDER PERISHED TO BE RENEWED WITH SECURING CHAIN AND D SHACKLES AND 16 NOS TYRE FENDER COLLAR.

8

-

-

... More
DL NO: 37 MISCELLANEOUS AFFF EXTINGUISHER BRACKET OF ACCOMMODATION SPACE DAMAGED / BROKEN TO BE RENEWED AND WELDED INSITU.

1

-

-

... More
DL NO: 38 DRAUGHT MARKING DRAUGHT MARKING AT FOLLOWING LOCATIONS TO BE REPAINTED IAW NO 20/03 ON PRIORITY BASIS. (A) FWD STBD-1.5SQMTRS (B) FWD STBD-1.5SQMTRS (C) FWD PORT-1.5SQMTRS (D) AFT STBD-1.5SQMTRS (E) AFT PORT-1.5SQMTRS (F) PROPELLER DRAUGHT PORT-1.5SQMTRS (G) PROPELLER DRAUGHT STBD-1.5SQMTRS

10.5

-

-

... More
DL NO: 39 HATCHS HATCHES (05 NOS) DEFECTIVE, FOLLOWING REPAIR TO BE CARRIED OUT. (A) CLIPS (MS) RENEWAL NOS 04 (B) WEDGE (MS) RENEWAL NOS 04 (C) EPDM RUBBER RENEWAL RMTRS 08 (D) RETAINING LUG WITH STAND NOS 02 (E) OVERHAULING HATCHES NOS 02 (F) HATCH COVER METAL COMING RENEWAL RMTRS 20 (G) LOCKING EYE BRACKETS RENEWAL NOS 02 (H) HINGE BRACKETS RENEWAL NOS 04 (J) HINGE STUDS WITH PIN(MS) NOS 02 (K) WASHER (MS) RENEWAL NOS 08 (L) DECK COMING RMTRS 08 (M) PROVING OF CHALK TEST PER HATCH 02

5

-

-

... More
DL NO: 40 HULL SURVEY FOLLOWING DEFECTS OF NT ARGA 01 SCUTTLES TO BE REPAIRED / RENEWED. (A) EYE HOOKS CORRODED TO BE RENEWED - QTY 02 NOS (MAT M.S ). (B) SECURING CHAIN FOR SCUTTLES WITH END RINGS - QTY 02 NOS (MAT GI CHAIN, LENGTH 02 MTRS ). (C) SUNMICA PANELING OF DECKHEAD / BULKHEAD TO BE DEGUTTED FOR WELDING WORK OF EYE HOOKS AND POST WELDING SUNMICA PANELING TO BE RENEWED (MAT SUNMICA, AREA – 16 SQMTRS).

1

-

-

... More
DL NO: 41 FENDER FOLLOWING DEFECTS OF FENDER TO BE RECTIFIED. A FENDER SECURING CHAIN(16 MM) CORRODED TO BE RENEWED – 25 MTRS B D-SHACKLE( 20MM) CORRODED TO BE RENEWED – 22 NOS

1

-

-

... More
DL NO: 42 SANITARY SYSTEM 01 SHOWER FITTING IN MASTER TOILET CORRODED/ DAMAGED. TO BE RENEWED. MAT- CU(PIPELINE), COMMERCIAL SHOWER FITTING(JAQUAR), 1/2" DIA.

1

-

-

... More
DL NO: 43 SANITARY SYSTEM SOIL DISCHARGE LINE OF CREW WC-1 CORRODED AND DAMAGED. TO BE RENEWED. MAT- MS/ GI. APPROX LENGTH- 5 RMTR. SIZE- 4".

5

-

-

... More
DL NO: 44 DRAINAGE SYSTEM 10 IN NO DECK DRAINS ON WEATHER DECK, 01 & 02 DECKS CHOKED/ CLOGGED. TO BE CLEARED. JOB INVOLVES MANUFACTURING OF NEW DRAIN PIPES AS PER EXISTING FIT AND FITMENT OF THE SAME INSITU.

10

-

-

... More
DL NO: 45 DRAINAGE SYSTEM DECK DRAIN IN CREW WC- 1& 2, MASTER CABIN WC AND ENGINE DRIVER WC CLOGGED AND JAMMED. TO BE REPAIRED IN SITU. JOB INVOLVES RENEWAL OF PIPELINE(DRAINLINE), DEGUTTING/ REGUTTING OF DECK COVERING, LAGGING BRACKETS ETC., MAT- MS/GI. APPROX LENGTH- 15 RMTR. SIZE-1 1/2".

15

-

-

... More
DL NO: 46 VENTILLATION SYSTEM 04 MUSHROOM HEADS OF VENTILLATION SYSTEM TO BE OVERHAULED. JOB INVOLVES REMOVAL OF MUSHROOM HEADS FROM SITU,RENEWAL OF WIRE MESH AS PER EXISTING FIT. APPROX 25 SQMTR, OVERHAULING OF FLAP VALVE AND SPLINDLE ASSEMBLY, RENEWAL OF STRUCTURE IF NECESSARY, FITMENT OF MUSHROOM HEADS POST OVERHAUL, RENEWAL OF RUBBER PACKING.

4

-

-

... More
DL NO: 47 TANKS CLEAN / VENTILATE THE FOLLOWING TANKS TO REMOVE ALL DIRT, SLUDGE, RESIDUAL OIL AND DEBRIS AND LOOSE PAINT. SCRAPE / CLEAN CORRODED / RUSTED AREAS TO BARE METAL AND PREPARE STRUCTURE FOR USG SURVEY : A) FORE PEAK TANK + CHAIN LOCKER - 30 (B) FWD BALLAST TANK NO 1 - 60 sqmtrs (C) FWD BALLAST TANK NO 2 - 60 sqmts (D) FRESH WATER TANK (P/S) + GRAVITY TANK - 100 sqmtrs (E) AFT BALLAST TANK P/S - 100 sqmts (F) ENGINE ROOM BILGES WITH FRAMES - 200 sqmts (G) ENGINE ROOM STORE BILGES WITH FRAMES - 50 sqmtrs (H) ASP BILGES WITH FRAMES - 100 sqmtrs (I) FUEL OIL TANK - 250 NOTE: MAN ENTRY AND GAS FREE CERTIFICATE TO BE OBTAINED BY THE VENDOR FOR THE ABOVE MENTIONED TANKS FROM GOVT. APPROVED AGENCY PRIOR TO .

950

-

-

... More
DL NO: 49 PAINT SCHEME SUPER STRUCTURE BULK HEAD AREA (WHEEL HOUSE DECK) - 38 SQMTRS 1. EPOXY PRIMER / TIE COAT (INTERGARD 269) - . RED - DFT 50 - PSR(m2/Lt) 6.58 2. EPPOXY ANTICORROSIVE (INTERUF 262) - BLACK - DFT 125 - PSR (m2/Lt) 4.09 3. EPPOY ANTICORROSIVE (INTERUF 262) - GREY -DFT 125 PSR(m2/Lt) 4.09

38

-

-

... More
DL NO: 50 PAINT SCHEME 2. SUPER STRUCTURE BULK HEAD AREA (NO 1 DECK TO WHEEL HOUSE DECK) - 58.8 SQMTRS2 1. EPOXY PRIMER / TIE COAT (INTERGARD 269) - RED - DFT 50 - PSR(m2/Lt) 6.58 2. EPPOXY ANTICORROSIVE (INTERUF 262) - BLACK - DFT 125 - PSR(m2/Lt) 4.09 3. EPPOXY ANTICORROSIVE (INTERUF 262) - GREY - DFT 125 - PSR(m2/Lt) 4.09

58.8

-

-

... More
DL NO: 51 PAINT SCHEME FUNNEL - 11.50 SQMTRS 1. ONE COAT OF PRETREATMENT PRIMER PREPARED FROM DS CAT NO. 8010-000116 (BASE) AND DS CAT NO. 8010-000117 (ACCELERATOR) 2. WITHIN 4 HOURS APPLY ONE COAT OF CHLORINATED RUBBER PAINT PRIMER PATT NO. 8010-000460. 3. ONE COAT OF CHLORINATED RUBBER PAINT WHITE PATT NO 8010-000431

11.5

-

-

... More
DL NO; 52 PAINT SCHEME 3. MAST 02 NOS , MISC FITTINGS AND ALL GUARD RAILS - 12 SQMTRS 1. EPOXY PRIMER / TIE COAT (INTERGARD 269) - RED - DFT 50 - PSR(m2/Lt) 6.58 2. EPPOXY ANTICORROSIVE (INTERUF 262) - BLACK - DFT 125 - PSR(m2/Lt) 4.09 3. EPPOXY ANTICORROSIVE (INTERUF 262) - GREY - DFT 125 - PSR(m2/Lt) 4.09 4. POLYURETHANE (INTERTHANE 990) - RAL7040 WINDOW GREY - DFT 50 - PSR(m2/Lt) 7.98

12

-

-

... More
DL NO: 53 PAINT SCHEME 4.ABOVE BOOT WATER LINE AREA(95.225SQMTRS) + BULWARK AREA(142.00SQMTRS) TOTAL AREA 220 Sq Mtr 1. EPOXY PRIMER / TIE COAT (INTERGARD 269). RED - DFT 50 - PSR(m2/Lt) 6.58 2. ABRASION RESISTANT ALUMINIUM PURE EPPOXY (INTERSHIELD 300) - BRONZE - DFT 150 - PSR(m2/Lt) 2.8 3. ABRASION RESISTANT ALUMINIUM PURE EPPOXY (INTERSHIELD 300) - ALUMINIUM - DFT 150 - PSR(m2/Lt) 2.8 4. EPOXY TIE COAT (INTERGARD 263) - LIGHT GREY - DFT 125 - PSR(m2/Lt) 3.19 5. TBT FREE SELF POLISHING COPOLYMER A/P (INTER SMOOTH 360 SPC) - BLACK - DFT 150 - PSR(m2/Lt) 1.87 6. TBT FREE SELF POLISHING COPOLYMER A/P (INTER SMOOTH 360 SPC) - BLACK - DFT 150 - PSR(m2/Lt) 1.87 7. TBT FREE SELF POLISHING COPOLYMER A/P (INTER SMOOTH 360 SPC) - BLACK - DFT 150 - PSR(m2/Lt) 1.87

220

-

-

... More
DL NO: 54 PAINT SCHEME 5. DECK 01,02, AND MAIN DECK - 171.38 SQMTRS 1. EPOXY PRIMER / TIE COAT (INTERGARD 269) . RED - DFT 50 - PSR(m2/Lt) 6.58 2. ABRASION RESISTANT ALUMINIUM PURE EPOXY (INTERSHIELD 300) - ALUMINIUM - DFT 200 - PSR(m2/Lt) 2.1 3. EPOXY NON SKID (INTERSHIELD 352). EXTRA DK SEA GREY - DFT 300 - PSR(m2/Lt)(m2/Lt) 0.66

171

-

-

... More
DL NO: 56 MISCELLANEOUS CREW W/C 02 IN NOS DOOR SIDE FRAME CORRODED TO BE RENEWED.

2

-

-

... More
DL NO: 57 WC DECK DRAIN 06 IN NOS OF DECK DRAIN OF CREWS WC STRAINER CORRODED BROKEN TO BE REPAIRED/RENEWED

6

-

-

... More
DL NO: 59 MISELLANEOUS NT ARGA NAME BOARD BROKEN/PERISHED TO BE REPAIRED/RENEWED

2

-

-

... More
DL NO: 60 EXHAUST TRUNKING NT ARGA SRP EXHAUST BLOWER TRUNKING BENT REPAIR WORK TO BE CARRIED OUT AND 16 NOS OF SS NUT BOLTS CORRODED/DAMAGED TO BE RENEWED

1

-

-

... More
DL NO: 61 DECK DRAIN 02 IN NOS OF DECK DRAIN IN PORT AND STBD CHOKED TO BE REPAIRED

2

-

-

... More
DL NO: 62 DECK DRAIN PROVISIONING OF 03 DECK DRAINS IN PORT AND STBD CATWALK AND NEAR ENGINE STYLET BELOW LADDER

3

-

-

... More
DL NO: 63 LUB OIL TANK MANUFACTURING AND FITMENT OF 02 IN NOS. STORAGE TANKS FOR LUB OIL AND HYDRAULIC OIL OF 150 LTRS CAPACITY IN ASP TO BE CARRIED OUT.

2

-

-

... More
DL NO: 65 UNDERWATER FENDERING FITMENT OF FIXED UNDERWATER FENDERING TO BE CARRIED OUT, MAT- RUBBER D FENDER

1

-

-

... More
DL NO: 66 SEWAGE DISCHARGE/SANITARY SYSTEM 01 IN NO. DIRECT OVERBOARDL LINE TO BE PROVIDED FOR DIRECT OVERBOARD DISCHARGE OF SEWAGE IN CASE OF STP MALFUNCTIONING.

1

-

-

... More
DL NO: 67 D-FENDER AFT SIDE D-SHAPE RUBBER FENDER DAMAGED/UPROOTED. TO BE RENEWED.

1

-

-

... More
DL NO: 68 LAGGING LAGGING TO BE CARRIED OUT AT SCATTERED LOCATIONS. AREA 30 MTR2 MAT - MFMB

30

-

-

... More
DL NO: 69 SANITARY SYSTEM DECK DRAIN OF GALLEY CHOKED. TO BE CLEARED.

1

-

-

... More
DL NO: 70 DECK COVERING SILLER COAT OF MACHROTECH TO BE CARRIED OUT IN BRIDGE AND LIVING SPACE. AREA – 30 MTR2

30

-

-

... More
DL NO: 72 WATER PURIFIER 01 IN NO WATER PURIFIER NON OPS. TO BE RENEWED.

1

-

-

... More
DL NO: 73 WATER COOLER 01 IN NO WATER COOLER NON OPS. TO BE REPAIRED.

1

-

-

... More
DL NO: 74 BUNK MATTRESS 12 IN NO.MATTRESS DAMAGED/TORN. TO BE RENEWED.

12

-

-

... More
ENGINEERING

-

-

-

... More
DL NO: 1001-1014 02 IN NOS MAIN ENGINES MAKE- CATERPILLAR/GMMCO TYPE- C32 1000HOURLY INSPECT/ADJUST VALVE LASH CARRY OUT INSPECTION OF ENGINE VALVE ROTATORS CARRY OUT CALIBRATION OF FUEL INJECTORS CARRY OUT REPLACEMENT OF BELTS REPLACE FLEXIBLE HOSES AND CLAMPS REPLACE ENGINE AIR CLEANER ELEMENT CLEAN/ REPLACE ENGINE CRANKCASE BREATHER CHANGE ENGINE OIL AND FILTER REPLACE FUEL SYSTEM PRIMARY FILTER (WATER SEPERATOR) ELEMENT REPLACE FUEL SYSTEM SECONDARY FILTER INSPECT/ CLEAN/ OVERHAUL AFTERCOOLER CONDENSATE DRAIN VALVE CHEMICALLY CLEAN AND PRESSURE TEST AFTERCOOLER REPLACE CLOSED CRANKCASE VENTILATION (CCV) FUMES DISPOSAL FILTER NSPECT/CLEAN TURBOCHARGER

2

-

-

... More
DL NO: 1015-1021 02 IN NOS DIESEL ALTERNATOR MAKE- KIRLOSKAR TYPE- 6R 1080 T 1000 HOURLY CHANGE ENGINE OIL AND LUB OIL FILTER CARTRIDGE. REPLACE FUEL FILTER CARTRIDGE CARRY OUT CLEANING OF FUEL STRAINER OF FUEL FEED PUMP REPLACE DRIVE BELTS AND ADJUST TENSION CARRY OUT CHEMICAL CLEANING AND PRESSURE TESTING OF HEAT EXCHANGER CARRY OUT CLEANING OF CENTRIFUGE CLEANER CARRY OUT REPLACEMENT OF DRY TYPE AIR CLEANER

2

-

-

... More
DL NO: 1022-1029 02 NOS. HRP SYSTEM MAKE- HRP THRUSTER SYSTEMS MODEL- HRP 4111 WM 1000 HOURLY REPLACE HYDRAULIC OIL FILTERS INSPECT FLEXIBLE COUPLING ELEMENT CARRY OUT TIGHTENING OF CARDON SHAFT BOLTS CARRY OUT ANALYSIS OF HYDRAULIC OIL CONDITION. CHANGE OIL CARRY OUT TIGHTENING OF ALL FASTENERS CHECK PROPELLER CONDITION. REPAIR AS NECESSARY CHECK TIGHTENING OF BOLTS AND NUTS (OUT BOARD) CARRY OUT GREASING OF SHAFT LINE BEARINGS

2

-

-

... More
DL NO: 1030-1035 01 IN NO FUEL CENTRIFUGE MAKE- ALFA LAVAL TYPE- MAB 103B-24 1500 HOURLY INSPECT WORM WHEEL SHAFT AND GEAR HOUSING CHECK WORM WHEEL AND WORM RENEW OIL LEVEL IN GEAR HOUSING CLEAN AND CHECK OF LOCK RING, BOWL HOOD, TOP DISC, GRAVITY DISC, BOWL DISC, DISTRIBUTOR, BOWL BODY, CORROSION, EROSION, CRACKS, DISC STACK PRESSURE . RENEW O RING AND SEALING CARRY OUT FUNCTIONAL CHECKS OF MONITORING EQUIPMENT. REPAIR AS NECESSARY

1

-

-

... More
DL NO: 1036-1039 01 IN NO LUB OIL CENTRIFUGE MAKE- ALFA LAVAL TYPE- MAB 103B-24 1500 HOURLY INSPECT WORM WHEEL SHAFT AND GEAR HOUSING CHECK WORM WHEEL AND WORM RENEW OIL LEVEL IN GEAR HOUSING CLEAN AND CHECK OF LOCK RING, BOWL HOOD, TOP DISC, GRAVITY DISC, BOWL DISC, DISTRIBUTOR, BOWL BODY, CORROSION, EROSION, CRACKS, DISC STACK PRESSURE .

1

-

-

... More
DL NO: 1040-1041 01 IN NO LUB OIL CENTRIFUGE MAKE- ALFA LAVAL 1500 HOURLY RENEW O RING AND SEALING CARRY OUT FUNCTIONAL CHECKS OF MONITORING EQUIPMENT. REPAIR AS NECESSARY

1

-

-

... More
DL NO: 1042-1045 20 TPH SUBMERSIBLE PUMP MODEL-M120N(M) QTY - 04 500 HOURLY EXAMINE INTERNAL WEAR CHECK RUNNING CLERANCE CHECK OIL CONDITION FOR MECHANICAL SEAL CHECK DIFFUSER FOR WEAR AND CLERANCE

4

-

-

... More
DL NO: 1046-1050 37 TPH DIESEL DRIVEN PUMP MODEL- SH65-16N1-DG S2-316 QTY - 02 500 HOURLY CHECK INJECTION NOZZLE CHECK INJECTION PUMP ADJUST VALVE CLERANCE OF INTAKE AND EXHAUST VALVE CHECK THE SURFACE OF BRUSH AND SLIP RING CHECK AND REPLACE FUEL PIPING

2

-

-

... More
DL NO: 1052-1053 OILY BILGE SEPERATOR YEARLY CARRY OUT FUNCTIONAL CHECKS OF EQUIPMENT, REPAIR/ RENEW COMPONENT AS TO BE CLEANED INTERNALLY. COATING TO BE CHECKED FOR INTACT PHYSICAL CONDITION, IF DEFECTIVE, IT SHALL BE REPAIRED TO PREVENT SEVERE CORROSION. SEE ALSO REPAIR OF COATINGNECESSARY.

1

-

-

... More
DL NO: 1054-1057 AIR COMPRESSOR MAKE - INGERSOLL TYPE- RECIPROCATING MODEL- 251 X 5 QTY - 02 1500 HOURLY CARRY OUT FUNCTIONAL CHECKS OF PRESSURE SWITCHES, CUT- IN AND CUT-OFF PRESSURE. RENEW/ REPAIR COMPONENT AS NECESSARY. DISMANTLE BREATHER VALVE, CLEAN AND CHECK FOR ALL CORRECT SEATING. EXAMINE THE LUBRICATING OIL IN THE CRANKCASE SUMP, RENEW IF NECESSARY. CHECK ALL PIPELINES FOR LEAKS AT JOINTS, RENEW PACKING AND PIPE LINE AS NECESSARY.

2

-

-

... More
DL NO: 1061 HP AIR SYSTEM SR ROUTINES HP AIR SYSTEM PIPE LINES THINNED AND PERISHED AT VARIOUS PLACES, TO BE RENEWED. WORK INVOLVES REMOVAL/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS AND FLANGE GASKETS TO BE RENEWED(MS).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING MAT- MS , SIZE- 50 MM ,LENGTH-10 MTR,TEST PRESSURE-500 PSI.

10

-

-

... More
DL NO: 1071 INSTRUMENTATION GAUGE PIPE LINES SR ROUTINES INSTRUMENTATION PIPE LINES OF VARIOUS MACHINERIES HOLED AND PERISHED AT VARIOUS PLACES, TO BE RENEWED INCLUDING END FITTINGS. LENGTH- 15 MTR, SIZE-8 MM.

15

-

-

... More
DL NO: 1073 BILGE WATER SYSTEM SIR ROUTINES MAIN ENGINE ROOM AND HRP ROOM PUMPING OUT ARRANGEMENT PIPE LINE TO BE CLEANED/ RENEW AS NECESSARY. SYSTEM TO BE PROVED FOR SATISFATORY PERFORMANCE

1

-

-

... More
DL NO: 1075 SRP COOLING S/W PIPE LINE SR ROUTINES SEA WATER PIPE LINE OF SRP COOLING PERISHED AT VARIOUS PLACES. TO BE RENEWD INCLUDING END ADAPTORS. MAT CUNI FOR PIPE AND BRASS FOR END ADAPTORS.. DIA - 40 MM , LENGTH - 15 MTRS DIA - 20 MM , LENGTH - 15 MTRS

30

-

-

... More
DL NO: 1088 DIESEL ALTERNATOR LUB OIL DRAIN LINE SR ROUTINES BOTH DA LUB OIL DRAIN LINE TO BE CHEMICALLY CLEANED AND PRESSURE TESTED. RENEW PIPE LINE INCLUDING END FITTINGS IF NECESSARY. DIA - 20 MM , LENGTH - 10 MTRS, MAT - MS

10

-

-

... More
DL NO: 1100 DOMESTIC FRESH WATER SYSTEM PIPE LINE SR ROUTINES CHEMICALLY CLEAN AND PRESSURE TEST FRESH WATER SYSTEM PIPE LINE. RENEW PIPE LINE IF NECESSARY. DIA - 40 MM , LENGTH - 20 MTRS, MAT - MS

20

-

-

... More
DL NO: 1102 DOMESTIC SEA WATER SYSTEM PIPE LINE SR ROUTINES CHEMICALLY CLEAN AND PRESSURE TEST DOMESTIC SEA WATER SYSTEM PIPE LINE. RENEW PIPE LINE IF NECESSARY. DIA - 40 MM , LENGTH - 20 MTRS, MAT - CU NI

20

-

-

... More
DL NO: 1103 FUEL FILLING SYSTEM SR ROUTINES 04 IN NOS FLANGES TO BE MANUFATURED AS PER FITTING.

4

-

-

... More
DL NO: 1106 DURETTES SR ROUTINES DURETTES OF VARIOUS SYSTEM PIPE LINES DETERIORATED AND PERISHED, TO BE RENEWED . ALL SECURING JUBILEE CLIPS/ CLAMPS TO BE RENEWED. Dia (mm) Length (mtr) 25 6 50 8 76 12 100 8 130 6

5

-

-

... More
DL NO: 1111 MISCELLANEOUS MISC NUTS/ ADAPTORS OF VARIOUS SYSTEMS TO BE MANUFACTURED AS PER SAMPLE. MAT- BRASS, QTY - 40 NOS

40

-

-

... More
DL NO; 1116 LAGGING HOT LAGGING IS TO BE CARRIED OUT AT VARIOUS LOCATIONS. LENGTH- 07 MTRS

7

-

-

... More
ELECTRICAL

-

-

-

... More
DL NO: 201 ALTERNATOR (75 KVA) BOTH DA BOTH INTERIOR & EXTERIOR PART OF THE ALTERNATOR TO BE BLOWN THROUGH WITH DRY COMPRESSED AIR. CHECK BEARING AND WINDING, REPLACE AS NECESSARY. CARRY OUT CLEANING OF EQUIPMENT WITH WHITE SPIRIT.OUTPUT TO BE CHECKED POST COMPLETION.

2

-

-

... More
DL NO; 202 MAIN SWITCH BOARD CARRY OUT CLEANING OF EQUIPMENT WITH WHITE SPIRIT AND COMPRESSED AIR, CLEAN BUS BARS..OUTPUT TO BE CHECKED POST COMPLETION.

1

-

-

... More
DL NO: 203 415 V/ 24 V DC RECTIFIER PANEL CARRY OUT CLEANING OF EQUIPMENT WITH WHITE SPIRIT.OUTPUT TO BE CHECKED POST COMPLETION.QTY- 03 IN NOS

3

-

-

... More
DL NO: 204 WINDOW WIPER 04 IN NOS WINDOW WIPER NOT WORKING. DEFECT TO BE RECTIFIED

4

-

-

... More
DL NO: 205 SOUND POWER TELEPHONE SOUND POWER TELEPHONE NOT OPERATIONAL. DI/DR TO CARRIED OUT, QTY- 04 IN NOS

4

-

-

... More
DL NO: 206 TRANSFORMER RECTIFIER TRANSFORMER RECTIFIER NOT OPERATIONAL. DI/DR TO CARRIED OUT. QTY- 01 IN NO

1

-

-

... More
DL NO: 207 MAIN BROAD CAST MAIN BROADCAST NOT OPERATIONAL. DI/DR TO CARRIED OUT.

1

-

-

... More
DL NO: 208 SPLIT A/C SPLIT AC NOT OPERATIONAL. DI/DR TO CARRIED OUT.QTY- 01 IN NO

1

-

-

... More
DL NO: 210 VHF SET NOT GIVE OUT PUT. TO BE CHECKED

1

-

-

... More
DL NO: 211 MOTORS CARRY OUT OVERHAULING OF FOLLOWING EQUIPMENTS (A) STEERING MOTOR 02 NOS. (B) AIR COMPRESSORMOTOR 02 NOS. (C) FIRE PUMP MOTOR 01 NOS. (D) FRESH WATER PUMP MOTOR 02 NOS. (E) SEA WATER PUMP MOTOR 02 NOS. (F) ENGINE ROOM SUPPLY FAN MOTOR (G) ENGINE ROOM EXHAUST FAN MOTOR (H) STP PUMP MOTOR

12

-

-

... More
DL NO; 212 PANEL CARRY OUT MAINTENANCE ROUTINE OF FOLLOWING STARTING PANELS (A) DA STARTING PANEL (B) BOTH ENGINE STARTING PANEL (C) NAVIGATION LIGHTS PANEL (D)BOTH SRP COOLING PUMP PANEL (E)BOTH SRP COOLING PUMP PANEL (F)WHEEL HOUSE AND SRP ROOM CANSOLE PANEL (G)MCR ALARM PANEL

11

-

-

... More
DL NO: 213 GENERAL LIGHTING MASTER CABIN , ENGINE DRIVER ROOM, GALLEY, WHEEL HOUSE, MAIN LOBBY,ENGINE ROOM AND NAVIGATION LIGHTS TO BE CHECKED AND REPLACE AS NECESSARY.

1

-

-

... More
DL NO: 214 STARTERS CARRY OUT OVERHAULING OF FOLLOWING EQUIPMENTS STARTERS (A) STEERING MOTOR STARTER 02 NOS. (B) AIR COMPRESSOR MOTOR STARTER 02 NOS. (C) FIRE PUMP MOTOR STARTER 01 NOS. (D) FRESH WATER PUMP MOTOR STARTER 02 NOS. (E) SEA WATER PUMP MOTOR STARTER 02 NOS. (F) ENGINE ROOM SUPPLY FAN MOTOR STARTER (G) ENGINE ROOM EXHAUST FAN MOTOR STARTER (H) STP CONTROL STARTER

14

-

-

... More
DL NO: 215 24V EMERGENCY LIGHTING 24V EMERGENCY LIGHTING NOT OPERATIONAL. DEFECT TO BE RECTIFIED.

1

-

-

... More
DL NO: 216 SENSORS AND INDICATORS FOLLOWING SENSORS AND INDICATORS NOT WORKING. DI/DR TO BE CARRIED OUT. (A)BOTH FRESH WATER AND BUNKER TANK FUEL INDICATOR (B)OWS ELECTRONIC SENSOR (C)SRP(STBD) LUBE OIL LEVEL SENSOR (D)STBD M/E LUBE OIL AND FRESH WATER TEMPERATURE SENSOR

7

-

-

... More
DL NO: 217 FIRE MAIN PORT AND STBD FIRE MAIN PUMP DISCHARGE NOZZLE AT BRIDGE TOP NOT WORKING FROM REMOTE POSITION. DI/DR TO BE CARRIED OUT.

2

-

-

... More
DL NO: 218 MOTORS OVERHAULING OF FOLLOWING MOTORS TO BE CARRIED OUT (A) FOAM GUN ROTATING MOTOR 02 IN NOS. (B) ANCHOR WINDLASS MOTOR 01 IN NO. (C) CAPSTAN MOTOR 01 IN NO. (D) SRP ROOM SUPPLY FAN 01 IN NO.

5

-

-

... More
DL NO: 219 STARTERS CARRY OUT OVERHAULING OF FOLLOWING STARTERS (A) STEERING MOTOR STARTERS 02 IN NOS. (B) AIR COMPRESSOR MOTOR STARTERS 02 IN NOS. (C) FOAM GUN ROTATING MOTOR STARTERS 02 IN NOS. (D) ANCHOR WINDLASS MOTOR STARTER 01 IN NO. (E) FIRE PUMP MOTOR STARTER 01 IN NO. (F) FRESH WATER PUMP MOTOR STARTERS 02 IN NOS. (G) SEA WATER PUMP MOTOR STARTERS 02 IN NOS. (H) ENGINE ROOM SUPPLY FAN MOTOR STARTER 01 IN NO. (J) ENGINE ROOM EXHAUST FAN MOTOR STARTER 01 IN NO. (K)STP PUMP MOTOR STARTER 01 IN NO. (L)CAPSTAN MOTOR STARTER 01 IN NO.

16

-

-

... More
DL NO: 220 WHEATHER DECK LIGHTINGS ALL WHEATHER DECK LIGHT AND FITTING TO BE CHECKED AND REPLACED

1

-

-

... More
DL NO: 221 BUNK LIGHTS BUNK LIGHTS DEFECTIVE IN VARIOUS PLACES TO BE REPLACED WITH NEW ONE

1

-

-

... More
DL NO: 222 LIGHTING SOCKETS LIGHTING SOCKETS IN VARIOUS PLACES DEFECTIVE .TO BE REPLACED.

1

-

-

... More
DL NO: 223 NAVIGATIONAL LIGHT CONTROL PANEL OVERHAULING OF NAVIGATIONAL LIGHT CONTROL PANEL TO BE CARRIED OUT. ALL NAVIGATIONAL LIGHTS AND FITTINGS TO BE TO BE CHECKED AND REPLACED.

1

-

-

... More
DL NO: 224 GALLEY RANGE OVERHAULING OF GALLEY RANGE CONTROL PANEL TO BE CARRIED OUT. HOT PLATE ELEMENT TO BE REPLACED WITH NEW ONE.

1

-

-

... More
DL NO: 225 FLOOD LIGHTS 05 IN NO. FLOOD LIGHTS DEFECTIVE.TO BE REPLACED

5

-

-

... More
DL NO: 226 LIGHT FITTINGS LIGHT FITTINGS IN VARIOUS PLACES CORRODED & DEFECTIVE TO BE REPLACED WITH NEW ONE

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.