Directorate Of Local Bodies Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Local Bodies Tender
Civil And Construction
Road Construction
Eprocure
Opening Date19 May 2025
Closing Soon26 May 2025
Tender Amount₹ 37,20,846.9545 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 79,600Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DOLBU_1040325_1Tender No
99/N.P.BHARAT BHARI 2025-26 DATE 17.05.2025Tender Authority
Directorate Of Local Bodies ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Sand filling in already excavated
trenches including supply of
necessary quantity of sand from a
distance not exceeding 10 km. from
the site of work and including
watering, dressing etc. include all
materials of the work. Volumn of sand filling 90 mm dia Deduction of pipe volumn
90 mm dia
24.63
875
21551.25
... More
Supply of the 90 mm dia HDPE Pipe
PN-6 (O. D.) PE-100 sizes of pipes
confirming to I.S. 4984:1995, I.S.-
8329/2000 latest relevant of I.S.S
with couplers etc complete in all
respect F.O.R. destination including
all taxes and insurance.
169
546
92358.5
... More
Supply of D.I. K-7/HDPE specials
confirming to relevent ISS suitable
for above HDPE pipes F.O.R.
Destination including all taxes and
linsurance
1e-11
1
1e-34
... More
HDPE Pipe PN-6 (O. D.)PE-100
16.9
545
9218.949999999999
... More
DI Pipe K-7
2.5
1358
3395
... More
Carting from the store up to 10
HDPE Pipe PN-6 (O. D.)PE-100, 90
mm dia sizes of pipe and specials to
the site of work lowering them in to
trenches and laying true to alignment
and gradient including jointing,
testing of pipeline and including
supply of jointing material such as
nut & bolts, rubber insertion, white
lead etc. complate but excluding cost
of trenching and cutting of pipes etc.
For making of lengths but including
making joints.
169
65
11089.78
... More
Supply and Fixing of air valves 25 mm,
size as per I.S. 780/1969 class-1 working
including taxes and insurance.
1
11229
11229.2
... More
Carting of Air Valves fittings of 25
mm sizes to the site of works
lowering them into already prepared
trenches and fixing them in position
including supply of jointing materials
such as bolt nut, rubber insertion
white lead complete with excluding values and specials required but
including the testing etc. complete
excluding values and specials
required but including the testing etc.
complete.
1
929
929.5
... More
Supply and construction of Air
Valves as per type design including
supply of all materials labour, T & P
letc. com.
1
12900
12900
... More
Supply and construction of modern
as per type single tap pillar type
stand post all materials, labour
complete.
2
14500
29000
... More
Crossing of Road for laying pipe line
including supply materials labour,
T&P etc. complete. 3.5 M wide Road
1
19500
19500
... More
Provision of House connection with
20MM (O.D.) HDPE pipe in distribution
line including cast of ferrule, saddle, cost
of G.I. pipe, juction, T wuth Labour
T&P etc. complete as per instructions of
Engineer -in - charge. (drawing no.D-12)
12
4946
59352
... More
Earth work in Execavation of foundation
in ordainary soil including lift up to 1.5
mt and lead up under foul position.
RW
diran
111.03
150
16654.5
... More
Concrete with 4 cm gauge B/B, fine
sand of 1.25 fm fineness modules and
cement in the proportion 1:4:8 in
foundation including supply of all
materials, labour tools and plants comp.
RW
diran
37.011
700
25907.7
... More
Class 150 sub class A brick work in 1:3
cement and course sand mortor in
foundation and plinth including supply
of all materials, labour and tools and
plants etc all complete at site.
RW
diran
diran
140.17
520
72888.4
... More
12 mm thick plaster with cement and c/s
mortor 1:3 on brick work including
raking the joint washing and cleaning
with water proofing materials and supply
of all materials labours tools and plants
etc all complete at site.
RW
diran
219.7
70
15379
... More
PCC work with cement.course sand 2
cm. gauge stone grit in the proportion on
1:1/2:3 in top side of Nali and floor of
nali includind all materials labour tools
and plants complete.
RW
diran
7.77
980
7614.599999999999
... More
Construction of GSB by Providing
coarse graded material spreading in
uniform layers with motor grader on
prepared surface mixing by mix in place method with rotavator at OMC, and
compacting with smooth wheel roller to
achieve the desired density complete as
per technical cluse- 401.
59.995
5829
349752.8515
... More
Providing, laying, WBM Grade-3 with 22.4-53mm size Stone Ballast, spreading
and compacting stone aggregates of specific sizes to water bound macadam
specification including spreading in
uniform thickness, hand packing, rolling
with 3 wheeled static roller and fill up
the interstices of coarse aggregate,
watering and compacting to the required
dencity G-3 as per TSC 405.3
35.997
6012
216413.964
... More
Supply and laying of 80 mm gauge interlocking tile including loading,
staking unloadind, westage, cartage all
taxes comp
83.66
8250
690195
... More
Filling of local sand in joints including all
5.0193
150
752.8950000000001
... More
Shifting and fixing of pole at
sitencluding supply and materials
labour etc all complete at site.
2
27500
55000
... More
Provision of labour kits kudal, belcha,
gaita, gharu all com
1
2000
2000
... More
Diversion of Road including all
complete at site.
1
45000
45000
... More
Diversion of house water nali including
all complete.
1
45000
45000
... More
Baricating of road including all complete
at site.
1
45000
45000
... More
Supply of 40 mm Brick Ballast including
staking charge, loading, unloading, toll
tax etc all complete at site
46.34
2750
127435.00000000001
... More
Supply of local sand including cost of
sand, staking, loading, unloading, etc all
complete at site
28.18
2645
74536.1
... More
Supply of Cement 50 kg Bags including
cost of cement, staking, loading, unloading, etc all complete at site
608.05
415
252340.74999999997
... More
Supply of course sand including cost of
course sand, staking charge, loading,
unloading, toll tax all complete.
44.64
4826
215432.64
... More
Supply of Brick 150 sub class A
including cost of Brick staking charge,
loading charge, unloading charge
complete
49.477
9350
462609.94999999995
... More
Supply of 20 mm gauge stone grit
including cost of 20 mm size stone grit,
staking, loading unloading charge, comp
7
5335
37345.700000000004
... More
Provision of Shifting of material for pwd
road to site with tracter trally and head
load of material at site of cost total cost
at ten pe. including etc all complete at
site.
1
153787
153787.18
... More
(+) Add GST @ 18 % For Total Project Cost
1
581315
581315.539
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%