Directorate Of Industries Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Industries Tender
Furnitures and Fixtures
Eprocure
Opening Date10 Apr 2018
Closing Date25 Apr 2018
Tender AmountRefer Documents
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_UPDOI_186984_1Bid Award Id
ViewTender No
29(M)SPS-7/RC DT 14-03-2018Tender Authority
Directorate Of Industries ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
R.C.C. work 1:1½:3 cement sand and 12-20 mm gauge stone grit in piles including supply of material & labour etc. complete.
2.1
13534
6444.9
Plinth Beam
-
-
-
Reinforcement for RCC work in plinth beam including straightening cutting, bending, placeing in position and binding all complete. (TMT Bar FE-500)
1.5
10290
6860
R.C.C. work 1:1½:3 cement sand and 12-20 mm gauge stone grit in plinth beam including supply of material & labour etc. complete.
1.25
9776
7821.02
Earth filling in plngth including supply of necessary quantity of earth from a distance not to exceed 2.0 Km. From the site of work and including watering, dressing, ramming etc. rates including cost of materials, labour T&P etc. required for proper completion of work.
5
1325
265
20 thick DPC with cement and approved coarse sand 1:2 including 5% water proofing materials or in the proportion as specified by the manufactures including curing and shuttering complete.
4.09
905
221.3
Ist class brick work in 1:6 cement local sand mortor in super structure including necessary cutting and moulding of brick as required and also including/Honey comb. Brick work thickness of wall including supply of all material labour T&P etc.
15.04
88984
5916.49
Supply & fixing of door & window angle frame Chaukhat 45x45x5m with MS sheet leaf (10 mm thick) including its fixing with grill.
5.5
41310
7511
R.C.C. work with cement coarse sand and 12-20 mm gauge approved stone grit in proportion on 1:1½:3 ( lintals, sun shades Slab.) and including necessary centering and shuttering supply of all materials labour, T&P etc. required for proper completion of work.
3.6
30971
8603.1
Reinforcement for plain work such as R.B. or R.C.C. work (when not included in over all rates) wrought to a required shapes as necessary including bending for proper completion of the work including supply of steel and wastage. (TMT Bar FE-500)
2.5
17150
6860
Rolled steel joints fixed in position including cost of joints and labour in handling and hoisting etc. complete. (200mmx200mmx100mm size).
3
6605
2201.7
12 mm thick plaster with cement and local sand in 1:6 over brick work minimum thickness not to be less than 12 mm including supply of all materials, labour T&P etc.
130
19253
148.1
25 mm thick P.C.C. in floor with 1:1½:3 cement, coarse sand and 12-20 mm thick gauge approved stone ballast laid in pannels with 3 mm floating coast of neat cement and including 75 mm thick local sand and 25-40 mm brick ballast in proportion 1:4:8 giving uniform finishing including supply of all labour T&P and material etc. complete.
30
15852
528.4
Painting or varnishing on new iron, work of new wood with one coat of primary and two coats of approved paints or varnish including supply of materials, labour, T&P etc. complete.
18
2367
131.5
White washing three coats including supply of all materials labour T&P etc.
70
948
13.55
Snowcem washing two coats with approved colour over one coat of primer including supply of all materials labour T&P etc.
80
4520
56.5
Provide and fix RCC jaillies of 30x30 cm. Size including supply of all materials labour T&P etc.
2
150
75
Add GST @ 12% of Item No.-01 to 15
1
34281
34281
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements