Dedicated Freight Corridor Corporation Of India Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Dedicated Freight Corridor Corporation Of India Limited - DFCCIL Tender

Goods
Electrical and Electronics
Ireps
Opening Date30 Jul 2024
Closing Date20 Aug 2024
Tender Amount₹ 2,01,62,665 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cleaning of Tension tower Insulators of 220KV Transmission line on Towers (per unit=01 string)

4234

458

1941839.42

... More
Regular Tower to Tower ground/top monthly patrolling, detection of defects, like missing/theft tower 1 members, removal of bird nest from the tower insulator, checking of hot point by thermovision Camera, puncture insulator disc, dislocation of vibration dampers/damaged conductor/earth wire, checking of foundation & position of trees in the corridor of 50 mtr, patrolling shall be done on monthly basis

10563

432

4567758.09

... More
Lopping, chopping and cutting of tree branches above 0.5 mtr birth in 50 mtr corridor line and stacking of above cuttings at proper place for from the site

540

230

124297.2

... More
Tree cutting in the 50 mtr corridor of above line up to diameter of 0.5 mtr birth

540

95

51489

... More
Emergency patrolling of above during tripping to defect the exact fault location & type of Fault or as per direction of Engineer in charge

108

524

56687.04

... More
Fabrication & fixing of missing/damaged tower members including cartage of steel angles from S/S store, punching holes for proper placement tightening of nuts & bolts punching & chamfering at different tower location

540

264

143019

... More
Tack welding of new nut & bolts

5400

7

38988

... More
Back filling of earth across the tower foundation wherever required including cost of material, labour T & P etc and its transportation up to the site

1080

235

254836.8

... More
Repairing of foundation, coping, wherever required including cost of material, labour T & P etc and its transportation up to the site

216

626

135218.16

... More
Replacement of damaged insulator/punctured insulator strings (Suspension string for 132 kV) at different towers where required at different tower location including cartage of material from store to work site of the above line. All the manpower and T & P shall be arranged by the contractor

14

1832

25655.98

... More
Replacement of damaged insulator/punctured insulator strings (Tension string for 132kV ) at different towers where required at different tower location including cartage of material from store to work site of the above line. All the manpower and T & P shall be arranged by the contractor

8

2094

16755.6

... More
Replacement of damaged insulator/punctured insulator strings (Suspension string for 220 kV) at different towers where required at different tower location including cartage of material from store to work site of the above line. All the manpower and T & P shall be arranged by the contractor

10

3060

30604

... More
Replacement of damaged insulator/punctured insulator strings (Tension string for 220 kV) at different towers where required at different tower location including cartage of material from store to work site of the above line. All the manpower and T & P shall be arranged by the contractor

10

3497

34977.4

... More
Tightening/ Fixing of missing /displaced damper /arcing horn etc on 132 KV TR Line

51

937

47816.07

... More
Tightening/ Fixing of missing /displaced damper /arcing horn etc on 220 KV TR Line

133

1562

207827.13

... More
Strengthening of earth wire including replacement/tightening of suspension clamp/copper bond as per site requirement

108

1439

155500.56

... More
Supply of single Earth Electrode

29

4426

128367.63

... More
Erection of single earth electrode

29

1102

31981.78

... More
Supply of Phase plate

19

443

8420.8

... More
Erection of Phase plate

19

180

3426.65

... More
Supply of Danger plate

15

516

7751.1

... More
Erection of Danger plate

15

99

1498.05

... More
Supply of Circuit plate

29

588

17077.23

... More
Erection of Circuit plate

29

119

3458.83

... More
Supply of number plate

29

294

8527.74

... More
Erection of number plate

29

99

2896.23

... More
Supply of anti climbing device for Tower

12

8850

106202.28

... More
Erection of anti climbing device for Tower

12

1002

12035.28

... More
Supply of Bird Guard

12

1342

16105.2

... More
Erection of Bird Guard

12

54

649.44

... More
Dismantling of old 132 kV TR Line circuit

1

6572

6572.43

... More
Dismantling of old 132kV & 220kV TR Line Towers

2.16

6288

13583.74

... More
Transportation of released material

1800

23

42282

... More
Extra on erection of work under shut down for erection of panther/Zebra/wolf conductor

1

13181

13181.6

... More
Hardware (without Insulator) 9 unit suspension string.

7

3174

22220.03

... More
Hardware (without Insulator) 9 unit duplicate suspension string

3

5442

16327.92

... More
Hardware (without Insulator) 10 unit duplicate tension string

3

5654

16964.52

... More
Hardware (without Insulator) 10 unit single tension string

5

3034

15171.95

... More
Accessories for Panther/Wolf conductor-Mid span joint

12

815

9791.52

... More
Accessories for Panther/Wolf conductor- Repair sleeve

12

241

2903.04

... More
Accessories for Panther/Wolf conductor-PG Clamps

24

828

19886.16

... More
Accessories for Panther/Wolf conductor- Vibration Damper

12

756

9072

... More
Accessories for earth wire- Suspension assembly

12

876

10518.96

... More
Accessories for earth wire- Tension assembly

12

891

10700.88

... More
Accessories for earth wire- Mid span joint

12

150

1803.6

... More
Accessories for earth wire- Flexible earth bond

12

800

9609.48

... More
Safety Belt for TR Line

12

1434

17218.44

... More
Ending cone jumper for Panther/wolf conductor

12

568

6820.68

... More
PA Armour rod for panther/Wolf/Zebra Conductor

12

978

11746.68

... More
Vibration Damper for earth wire

12

776

9321.6

... More
Supply of TR line Discharge Rod

7

14731

103120.92

... More
Supply of Panther/Wolf conductor for 132 kV TR line

1

239504

239504.96

... More
Erection/Replacement of damaged Panther/wolf conductor 132kV TR line

5

4393

21969.35

... More
Supply of accessories for Panther/wolf Conductor

1

6689

6689.41

... More
Erection of accessories for Panther/wolf Conductor

1

267

267.72

... More
Supply of Ground wire

1

60486

60486.97

... More
Erection/stringing of broken Ground/earth wire

1

7024

7024.65

... More
Supply of accessories for earth wire

1

17360

17360.52

... More
Erection of accessories for earth wire

1

1102

1102.81

... More
Testing of Earth Electrode

720

770

554702.4

... More
Construction of Foundation/muff of TR Line Tower

24

14767

354427.92

... More
Supply & erection/replacement of barbed wire. The cost of nut/bolts has been paid in other SPS item

1200

16

20148

... More
Supply of structure/Angle/SPS/Nut Bolts etc for repairing/missing structure/Anti climbing etc

1.2

152414

182897.15

... More
Erection of structure/Angle/SPS/Nut Bolts etc for repairing/missing structure/Anti climbing etc

1.2

7468

8962.24

... More
Supply & erection of brick masonry & revetment

120

4615

553899.6

... More
Supply of a 9 unit single suspension string for 132kV Tr. Line including hardware

14

7924

110947.2

... More
Supply of a 10 unit single tension string for 132kV Tr Line including hardware

6

9405

56431.68

... More
Supply of a 10 unit double tension string for 132kV Tr Line including hardware

1

19963

19963.47

... More
Accessories for zebra conductor for 220kV - Mid span joint

12

1362

16351.8

... More
Accessories for zebra conductor for 220kV -Repair sleeve

12

404

4848.12

... More
Accessories for zebra conductor for 220kV - PG Clamps

21

1383

29058.33

... More
Accessories for zebra conductor for 220kV -Vibration Damper

12

1262

15150.24

... More
Dismantling of old 220 kV TR Line circuit

1

10975

10975.94

... More
Ending cone jumper for Zebra conductor for 220kV TR Line

12

949

11390.4

... More
Supply of Zebra ACSR conductor for 220 kV TR line

1

396810

396810.44

... More
Erection/Replacement of damaged Zebra conductor for 220 kV TR line

9

12793

115140.15

... More
Supply of Zebra ACSR conductor accessories for 220kV TR line

1

10360

10360.08

... More
Erection of Zebra ACSR conductor accessories for 220kV Tr Line

1

2052

2052.55

... More
Supply of a 14 unit single suspension string for 220kV TR Line including hardware

6

11553

69318.42

... More
Supply of a 14 unit duplicate suspension string for 220kV TR Line including hardware

3

23106

69318.39

... More
Supply of a 15 unit single tension string for 220kV TR Line including hardware

6

12275

73650.78

... More
Supply of a 14 unit duplicate tension string for 220kV TR Line including hardware

3

24550

73650.84

... More
Supply and erection of reinforcement for foundation

1

88518

88518.32

... More
Attending breakdown & damage to conductor/earth wire/hot spot etc.

7

19527

136692.36

... More
1% Contingency

1

199631

199631.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.