Dakshinanchal Vidyut Vitran Nigam Limited Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Civil And Construction
Eprocure
Opening Date13 Jan 2021
Closing Date19 Jan 2021
Tender Amount₹ 2,00,000
Costs
EMD
₹ 2,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_DVVNL_544642_2Bid Award Id
ViewTender No
EDCA-39/2020-21Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
20
-
-
... More
Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
-
-
-
... More
PCC poles 8.5 Mtr./ST pole 11 Mtr.
11
-
-
... More
Erection of 11 KV line double pole on PCC/ST pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
-
-
-
... More
PCC poles 8.5 Mtr./ST pole 11 Mtr.
4
-
-
... More
Installation & fixing of 11 KV TPMO
3
-
-
... More
Laying , sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
-
-
-
... More
ACSR Weasal Conductor/GI Wire
814
-
-
... More
ACSR Dog Conductor
60
-
-
... More
Erection of section Tee pole including fixing of all fittings as per RESPO norms.
1
-
-
... More
Installation of extra “T”on the old erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc. required for proper completion of work. The “T”pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.
4
-
-
... More
Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work
16
-
-
... More
Providing and fixing of stay insulator.
27
-
-
... More
Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel. as per specification of UPPCL construction manual including including loading and unloading at the both ends.
31
-
-
... More
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour
30
-
-
... More
Grouting of PCC/ST poles as per RESPO norms including cost of grouting material (cement: sand: brick ballast) size 1500x450x450 mm).
8
-
-
... More
Chopping of Tree Branches which are touching to 11 KV/LT lines.
35
-
-
... More
Safe carriage of XLPE cable of size 3x70/120/185 Sq.mm. from store to respective site of work including loading unloading at both ends.
347
-
-
... More
Laying of 3x70/120/185 Sq.mm. 11 KV under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost.
347
-
-
... More
Providing and filling of 3x70/120/185 Sq.mm. 11 KV XLPE heat shrinkable cable jointing kits outdoor/indoor type including the cost of labour T&P carrier etc for proper completion of work.
2
-
-
... More
Safe carriage & installation of transformer from Store Center or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging etc. and also including the cost of labour, T&P and carrier etc. required for proper completion of work. (Distance 0 to 50 Km..
-
-
-
... More
25 KVA T/F
3
-
-
... More
63 KVA T/F
4
-
-
... More
Providing and fixing Clamp LT/V-Cross arm with nut & bolts asper RESPO Norms.
11
-
-
... More
Guarding of old 11 KV line damaged due to storm by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work.
30
-
-
... More
Demounting & carriage of site to Store of following capacity transformer due to damage of PCC poles including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
-
-
-
... More
63 KVA T/F
1
-
-
... More
Re-sagging of loose HT/LT line conductor as per direction of supervising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work.
-
-
-
... More
ACSR Weasal/GI wire Conductor
300
-
-
... More
Making the plinth of ST pole 11 Mtr.
2
-
-
... More
Safe carriage of 11 KV pilfer proof metering cubicle from store centre, Sarsol to site of work including loading and unloading at both ends. Average distance approx. 0 km to 50 km.
1
-
-
... More
Erection & grouting of 11 KV pilfer proof metering cubicle making connections with bus bar, tapping with Empire Tape with existing earthing. The above work includes the cost of labour, T&P, carrier & material etc. required for proper completion of work except cost of 11 KV VCBs.
1
-
-
... More
Safe carriage of 11 KV CT/PT pole mounting unit of any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, T&P and carrier etc. required for proper completion of work.
1
-
-
... More
Installation of 11 KV CT-PT combined metering unit on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). The M.S. Strip & earth rod shall be included in the scope of work.
1
-
-
... More
Dismentling of old and damaged pole with all accessories:-
-
-
-
... More
Double pole
1
-
-
... More
Safe carriage of old damaged ST pole from site to Store Lal Diggi, Aligarh.