Dakshinanchal Vidyut Vitran Nigam Limited Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date15 Jan 2025
Closing Date23 Jan 2025
Tender Amount₹ 2,50,000
Costs
EMD
₹ 2,500Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_980161_4Bid Award Id
ViewTender No
16/SE/EDCCKT/2024-25Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
DEAD END CLAMP WITH NUT AND BOLT
6
-
-
... More
DISTRIBUTION 3 PHASE (Provided by the Dept.)
2
-
-
... More
11 MTR LONG STP (Provided by the Dept.)
3
-
-
... More
100KVA, 11/0.44 KV T/F (Provided by the Dept.)
2
-
-
... More
ACSR WEASEL CONDUCTOR FOR JUMPERING (Provided by the Dept.)
15
-
-
... More
PCC POLE 8.5 MTR LONG (Provided by the Dept.)
9
-
-
... More
11 KV JOINTING KIT O/D 3X185SQMM
4
-
-
... More
STONE PAD 300X300X75 MM (Provided by the Dept.)
12
-
-
... More
LT XLPE CABLE 3.5X240SQMM (Provided by the Dept.)
16
-
-
... More
CONCERETING OF STAY
4
-
-
... More
LT CLAMP
10
-
-
... More
DISTRIBUTION 1 PHASE (Provided by the Dept.)
8
-
-
... More
Fencing of Tranformer for T/F including of first class brick sand cement & Iron material etc. As per RESSPO manual
1
-
-
... More
PIN INSULATOR WITH PIN (Provided by the Dept.)
3
-
-
... More
CONCERETING OF POLES
12
-
-
... More
I-HOOK
10
-
-
... More
250KVA, 11/0.44 KV T/F (Provided by the Dept.)
1
-
-
... More
11 KV FUSE SET (Provided by the Dept.)
1
-
-
... More
PEARCING CONNECTOR
24
-
-
... More
Work of increasing the capacity of distribution transformers of different capacities and installing additional distribution transformers under the Business Plan Year 2024-25 (Part-2) under EDD-Karwi Chitrakoot.
-
-
-
... More
11 KV XLPE CABLE 3X185SQMM (Provided by the Dept.)
60
-
-
... More
M.S. DROPPER CHANNEL 100X50X2028MM, With CLAMP and BOLT & NUT
1
-
-
... More
STAY SET COMPLETE (ROD+WIRE) WITH BOLT & NUT
6
-
-
... More
Fixing & Commisioning of Pipe Earthing of Transformer By 2" Dia 6 Meter length G.I. Pipe (body+netural) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (all material shall be arranged by contractor)
2
-
-
... More
LT XLPE CABLE 3.5X150SQMM (Provided by the Dept.)
8
-
-
... More
M.S. TOP CHANNEL 125X65X2240MM, With CLAMP and BOLT & NUT
1
-
-
... More
EARTHING COMPLETE
12
-
-
... More
Construction of new T/F Plinth Size 2x2x1.5 Mtr. including of first class brick sand cement etc. As per RESSPO manual
1
-
-
... More
DISC INSULATOR WITH FITHING (Provided by the Dept.)
3
-
-
... More
D/POLE CLAMP
6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements