If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date23 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 25,00,000
Costs
EMD
₹ 25,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_948454_1Bid Award Id
ViewTender No
EDCA-04/2024-25Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
-
-
-
PCC/ST poles 8.5/11 Mtr.
122
-
-
Erection of double pole on following poles including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
-
-
-
PCC/ST poles 8.5/11 Mtr.
54
-
-
Installation & fixing of 11 KV TPMO.
24
-
-
(a) Erection & Grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work.
150
-
-
(b) Providing and fixing of stay insulator.
150
-
-
Laying, sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
-
-
-
ACSR Weasal Conductor.
21600
-
-
ACSR Dog/Rabbit Conductor.
2100
-
-
ABC Conductor 3x50+1x35+1x16 Sq.mm./3x95+1x70+1x16 Sq.mm./ 3x120+1x95+1x16 Sq.mm.
1900
-
-
Grouting of PCC/ST poles 8.5/11 Mtr. Long as per RESPO norms
260
-
-
Making the plinth of Steel poles.
32
-
-
Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel, Stone pad. as per specification of UPPCL construction manual including including loading and unloading at the both ends.
300
-
-
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work.
260
-
-
Chopping of tree branches which are touching to HT/LT lines.
120
-
-
Erection of section Tee pole including fixing of all fittings as per RESPO norms.
30
-
-
Providing & Fixing of Clamps of LT, Cross Arm Holding, F-Clamp, Stay Clamp, Danger board clamp with Nut & Bolts.
310
-
-
Providing of Fixing of LT shackle insulator.
75
-
-
Providing/Fixing of missing Nut bolts and washer
75
-
-
Carriage & Mounting from site to Store/store to site following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
-
-
-
10/16 KVA T/F
16
-
-
25 KVA T/F
31
-
-
63 KVA T/F
15
-
-
100 KVA T/F
5
-
-
Safe carriage of LT distribution box (three phase) from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms.
30
-
-
Fixing of 3x70/3x120/3X185 Sq.mm. 11 KV XLPE heat shrinkable cable jointing kits indoor & outdoor type including the cost of labour T&P carrier etc for proper completion of work.
22
-
-
Fixing of 3x300 Sq.mm. 33 KV XLPE heat shrinkable cable jointing kits indoor & outdoor type including the cost of labour T&P carrier etc for proper completion of work.
7
-
-
Safe carriage of 3x70/3x120/3X185/3x300 Sq.mm.33 KV/11 KV XLPE Cable from Store Center to respective site of work including loading & unloading at both ends for proper completion of work.
620
-
-
Laying of 3x70/3x120/3X185/3x300 Sq.mm.33 KV/11 KV under ground cable by straight through after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost.
600
-
-
Guarding of 11 KV Line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work.
360
-
-
Carriage & Installation of 33KV/11 KV CT-PT Pole Mounted metering unit on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). The M.S. Strip & earth rod shall be included in the scope of work.
12
-
-
Safe carriage & Installation of 33KV/11 KV pilfer proof metering cubicle from store centre, Sarsol to site of work.
12
-
-
Providing & Fixing Wearing GI pipe 6” dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 KV feeder cable with boxes on the feeder double pole structure and making connections including supply.
6
-
-
Road Restoration charges for pucca road crossing.
25
-
-
Road Cutting for laying 33KV/11 KV under ground (Size 3x70/3x120 /3X185/3x300 Sq.mm) inside pipe after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost.
25
-
-
Installation of extra “T”on the old erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc. required for proper completion of work. The “T”pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.
26
-
-
Complete chemical earthing of 11/0.4 KV, Distribution Transformer by digging pits 6” dia upto 3 mtr. deep including chemical filled pipe in between (pipe-in-pipe) ISI mark B Grade & connecting with G.I strip of size 50mm X 6mm with neutral/body of 11/0.4 KV distribution transformer to above pipe-in-pipe (PIP) and filling of chemical crystalline conductive mixture containing highly conductive material around the (pipe-in-pipe) up to 3 Mtr. including making of chamber at the top of the earthing. Other details are as below:-
1. Earth pipe material – mild steel, Galvanized.
2-Main Electrode diameter – 42.4mm.
3-Auxiliary Electrode pipe, Diameter – 76mm. 4-Wall Thickness of main Electrode: - 2.6mm.
5-Wall thickness of auxiliary hole: - 3.2mm.
6- Length of earthing electrode (PIP):- 3 Meter.
6
-
-
Dismantling and carriage of existing conductor/poles from the various area preparing their coils and then stacking in the respective JE’s (Store)/Lal Diggi, Aligarh as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
-
-
-
ACSR Weasal/Dog Conductor.
950
-
-
ABC Conductor 3x50+1x35+1x16 Sq.mm./3x95+1x70+1x16 Sq.mm./ 3x120+1x95+1x16 Sq.mm.
200
-
-
PCC/ST poles 8.5/11 Mtr.
20
-
-
Demounting & carriage of following capacity transformer due to damage of PCC poles in storm including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
-
-
-
25 KVA T/F
3
-
-
63 KVA T/F
3
-
-