Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date22 Apr 2024
Closing Date1 May 2024
Tender Amount₹ 15,00,000
Costs
EMD
₹ 15,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_922511_2Bid Award Id
ViewTender No
EUDC/F/T-48/2023-24Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
STP 11 Mtr.IS410 SP-33
6
-
-
... More
STP 9 Mtr.IS410 SP-33
6
-
-
... More
A- ACSR Weasel Conductor - 70 Mtr.
B- 11 KV XLPE 3x70 sqmm. - 40 Mtr.
C- Cable LT ABC (3x95+1x70+1x16) Sqmm - 400 Mtr.
1
-
-
... More
LT XLPE CABLE AL 1*400SQMM- 1443 Mtr.
LT XLPE CABLE AL 1*240SQMM- 40 Mtr.
LT XLPE CABLE AL 1*120 SQMM- 2127 Mtr.
1
-
-
... More
DROPPER CHANNEL 100*50 MM- 5 No. 11 KV DISC INSULATOR WITH FITTING -09 No.
11 KV PIN INSULATOR WITH PIN -09 No.
STAY SET 16*1800 MM COMPLETE -02 No.
MS ANGLE 75*75*6*2028 MM FOR SUB STATION -06 No.
MS TOP CHANNEL 125*60*2240 MM -03 No.
MS CHANNEL 125*65*1300 MM (T-OFF) -05 No.
11 KV TPMO -01 No.
CABLE JOINTING KIT 3x70sqmm 11 kv -02 No.
1
-
-
... More
Supply of the Following Material.
-
-
-
... More
al lug long barrel 1*120 sqmm
100
-
-
... More
Al lug long barrel 1*240sqmm
8
-
-
... More
Al lug long barrel 1*400sqmm
310
-
-
... More
Tail less Unit
32
-
-
... More
DO FUSE SET - 28 No.
CLAMP WITH NUT WITH BOLT FOR STP -05 No.
STONE PAD 300*300*75 MM -12 No.
HOLDING CLAMP FOR TOP CHANNEL TPMO & FUSE SET -28 No.
LT INCOMING PANEL WITH FUSE UNIT -03 No.
DANGER BOARD BARBED WIRE Inc. Jumper -10 No.
SUSPENSION CLAMP WITH EYE HOOK -12 No.
DEAD END CLAMP WITH EYE HOOK -06 No.
LT PIERCING CONNECTOR FOR 95 MM -50 No.
LT DISTRIBUTION BOX 3PHASE -14 No.
LT DISTRIBUTION BOX MOUNTING CLAMP -24 No.
1
-
-
... More
Dismentalling and removal of the following transformers from various 11/0.4 KV substation, under the jurisdiction of Electricity Urban Distribution Division [II] Firozabad, and their cartage from site to Centre Store Asfabad (Firozabad) through Kaccha Pakka road as per direction of supervising engineer, including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, T&P, carrier etc required for proper completion of work. (Distance 00-20 Kms.)
-
-
-
... More
16 KVA Transformer
1
-
-
... More
25 KVA Transformer
1
-
-
... More
63 KVA Transformer
1
-
-
... More
100 KVA Transformer
22
-
-
... More
Installation of the Following new transformers at various 11/0.4 KV substation, under the jurisdiction of Electricity Urban Distribution Division [II] Firozabad, in proper alignment and direction and making proper HT/LT connection as per instruction of Supervising Engineer after carriage the same from Centre Stores, Asfabad including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, T&P, carrier etc required for proper completion of work.
-
-
-
... More
25 KVA Transformer
1
-
-
... More
63 KVA Transformer
1
-
-
... More
100 KVA Transformer
4
-
-
... More
250 KVA Transformer
22
-
-
... More
Laying of the following cable.
-
-
-
... More
A- ACSR Weasel Conductor - 70 Mtr.
B- 11 KV XLPE 3x70 sqmm. - 40 Mtr.
C- Cable LT ABC (3x95+1x70+1x16) Sqmm - 400 Mtr.
1
-
-
... More
LT XLPE CABLE AL 1*400SQMM- 1443 Mtr.
LT XLPE CABLE AL 1*240SQMM- 40 Mtr.
LT XLPE CABLE AL 1*120 SQMM- 2127 Mtr.
1
-
-
... More
Erection of 11 M long STP Double Pole Structure including duly grouted in cement, sand and brick ballast in ratio 1:2:4, including work of fitting of all accessories, stone pad and clamps suitable for AB cable. Work will be carried out as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
3
-
-
... More
Erection of 9/11 M long STP Single Pole including duly grouted in cement, sand and brick ballast in ratio 1:2:4, including work of fitting of all accessories, stone pad and clamps suitable for AB cable. Work will be carried out as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
6
-
-
... More
Chemical Earthing of Distribution T/F including all required materail including all required materail as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
10
-
-
... More
Fixing of earthing rod for pole earthing as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
12
-
-
... More
Erection and grouting of stays as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
2
-
-
... More
Installation of Tail Less unit for 250 KVA 11/.4 KV Transformers
32
-
-
... More
Concreting of pole 0.880 cu. M. each including all required materail per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
12
-
-
... More
Constructionof Distribution Transformer plinth including all required materail of size 2’x2’x1.5’ at various places under the jurisdiction of EUDD-II, Firozabad. The size of plinth shall be of 4’ above the ground level. At the bottom there shall be brick ballast pad of size 5x6’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast properly hammered and rammered as per direction of supervising engineer. On the top of the wall there shall be mesh of 12 mm thick iron rod at distance of 9’’ and RCC work in ratio 1:3:6 [Cement, Sand and grit stone] There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer., and also including the cost of arrangement of labourer, T&P etc required for proper completion of work.
2
-
-
... More
Fencing of 250 kva Distribution Transformers including all required materail in proper alignment as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
2
-
-
... More
Carriage of dismantle material i.e. poles and other accessories of 33 KV, 11 KV and LT line as mentioned above from site to Centre store Asfabad (10 Kms.)
50
-
-