Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date28 Jul 2024
Closing Date5 Aug 2024
Tender Amount₹ 20,00,000
Costs
EMD
₹ 40,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Summary
20/edck/2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_941730_1Tender No
20/EDCK/2024-25Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Carriage of 100/63/25/16/10 KVA T/F from store center or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work
30
-
-
Erection of P.C.C Double pole including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
25
-
-
Grouting of P.C.C Double pole. The support shall be grouted with cement, sand and brick ballast/stone ballast In ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.
25
-
-
Erection of S.T.P Double pole including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
10
-
-
Grouting of S.T.P Double pole. The support shall be grouted with cement, sand and brick ballast/stone ballast In ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.
10
-
-
Erection of P.C.C Single pole including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
90
-
-
Grouting of P.C.C Single pole. The support shall be grouted with cement, sand and brick ballast/stone ballast In ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.
90
-
-
Erection of S.T.P Single pole including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
50
-
-
Grouting of S.T.P Single pole. The support shall be grouted with cement, sand and brick ballast/stone ballast In ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.
50
-
-
Erection and grouting of stay set including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work.
80
-
-
Dismentling of Rusted Weasal/Racoon /DOG conductor wire and G.I Wire as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work.
1
-
-
Laying, Sagging, Stringing, Binding and Jumpering etc. of Weasal/Racoon /DOG conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work.
35
-
-
Mounting of 100/63/25/16/10 KVA T/F on the double pole / plinth structure and connection thereof
30
-
-
Laying of 11 KV XLPE 3X185/3X120/ 3X70 SqMM As per respo manual
800
-
-
Safe carriage from panki store to site and Installation and grouting of meter Pilfer unit as per respo manual
15
-
-
Supply & erection of X-Arm Holding / Holding clamp with N&B as per RESPO Norms.
180
-
-
Supply & erection of F- Bracket with N&B as per RESPO Norms.
80
-
-
Safe carriage from panki store to site and Installation of CTPT Double metering unit on double pole of large and heavy consumer as per respo manual
15
-
-
Supply & erection of 11 KV I/D & O/D cable jointing kit suitable for 3X120/3X185 Sqmm (Indoor/Outdoor) with proper Termination as per RESPO Norms.
17
-
-
Supply & erection of 33 KV I/D & O/D cable jointing kit suitable for 3X300 SqMM Sqmm (Indoor/Outdoor) with proper Termination as per RESPO Norms.
8
-
-
Guarding of 11 K.V. Line Crossing
30
-
-
Trimming of Tree Branches in New 11 K.V Line.
7
-
-
Supply & Erection of G.I. Pipe 6" DIA
150
-
-
Fixing of earthing Rod as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work.
210
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements