Dakshinanchal Vidyut Vitran Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender

Works
Civil And Construction
Civil Works Others
Electrical and Electronics
Electrical Works
Eprocure
Opening Date7 May 2020
Closing Date12 May 2020
Tender Amount₹ 5,00,000 
Notes
Download

Costs

Summary

For The Work Of Deviye Appda In Edd Bah Agra

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Carriage of following from 132 KV Taj Agra to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) 11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps and other required line material, if any.

20

-

-

... More
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.) a) 8.5 Mtr. long PCC Poles.

100

-

-

... More
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.)B) 9 Mtr. Long PCC Poles

10

-

-

... More
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.)C) 9/11 Mtr. ST Poles.

10

-

-

... More
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.)D) 11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps and other required line material, if any.

20

-

-

... More
Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.

5

-

-

... More
Replacement of damaged poles of LT Lines by digging of pits and dismantling of all 11KV/LT accessories from the existing / damaged pole and erection of single new pole including fitting all accessories.

10

-

-

... More
Replacement of damaged poles HT Lines by digging of pits and dismantling of all 11KV/33 KV accessories from the existing / damaged pole and erection & grouting of single new pole including fitting of all accessories.

90

-

-

... More
Replacement of damaged poles 33 KV Lines by digging of pits and dismantling of all 11KV/33 KV accessories from the existing / damaged pole and erection & grouting of single new pole including fitting of all accessories.

8

-

-

... More
Recostructions of damaged Double pole (Saction) on 11 KV Lines by dismantling of T/f, opening of all accessories of LT S/S then removing damaged poles by digging earth pit(s), erecting new poles then fixing of of LT S/S accessories such as Dropper channel, T/F base, Disc Insulators with fitting and other 11 KV accessories etc., required for proper completion of work.

10

-

-

... More
Replacement of damaged Double pole structure on 33 KV Lines dismantling of T/f, opening of all accessories of LT S/S then removing damaged poles by digging earth pit(s), erecting new poles then fixing of of LT S/S accessories such as Dropper channel, T/F base, Disc Insulators with fitting and other 11/33 KV accessories etc., required for proper completion of work.

1

-

-

... More
Erection and grouting of stays in 1:4:8 ratio cement, sand and stone ballst, its tightning, binding, nozelling etc. of stay wire with stay and stay clamp of pole as per requirement of work at site.

25

-

-

... More
Fixing of earthing rod as per RESSPO manual and as per direction of supervising engineer.

25

-

-

... More
Re- sagging and stringing of existing conductor in 11KV/ /LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Weasel Conductor.

125

-

-

... More
Re- sagging and stringing of existing conductor in 33 KV Lines line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Weasel Conductor.

15

-

-

... More
Replacement of damaged following 11 KV accessories along with Nut & Bolt and all other related accesoories :- A) 11 KV X-Arm

30

-

-

... More
B) 11 KV Disc Insulator with fitting

30

-

-

... More
C) 11 KV Pin insulator with pin

25

-

-

... More
D) F" Clamp/X-Arm Clamp/D.P.Clamp/L.T. Pin Clamp

30

-

-

... More
E) L.T. insulator

25

-

-

... More
Straightening of tilted single 8.5 Mtr. PCC Polesof existing lines by opening of line conductor, digging earth pit, straightning of pole, filling the earth pit after straightning then relaying the line conductor, as per direction of supervising engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.

30

-

-

... More
Straightening of tilted single 9/11 Mtr. ST Poles/R.S. Joyst in the existing lines by opening of line conductor, digging earth pit, straightning of pole, filling the earth pit after straightning then relaying the line conductor, as per direction of supervising engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.

20

-

-

... More
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer

300

-

-

... More
Guarding / Re-Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.

5

-

-

... More
Numbering of poles by suitable paint. Paint & Concerning material shall be provided by the contractor at his own cost.

170

-

-

... More
Vediography of All Poles Shall be made by the contractor of concerning site before starting the work and after the completion of work & the copy of vediography shall be submitted by the contractor at the time of Measuremnt/Payment.

1

-

-

... More
Removal of Damaged/Burned LT Distribution Boxes & Fixing a new already/Newly erected pole for giving supply to consumer by connecting consumer by connecting consumer cable by using appropriated aluminium lug tape N& B Provided By Contractor as per requirment.

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.