Dakshinanchal Vidyut Vitran Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender

Works
Civil And Construction
Civil Works Others
Electrical and Electronics
Electrical Works
Eprocure
Opening Date7 Nov 2024
Closing Date13 Nov 2024
Tender Amount₹ 2,79,390.09 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete with 2cm gauge approved hard stone ballast, coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 3:1.5:1 including supply of all materials, labour,side shuttering if required and T&P etc. required for proper completion of work (CSI No. 5.21)

12.5

7426

92825

... More
Concrete with 4 cm gauge brick ballast obtained from breaking brick bats (brick bats supplied by the department free of cost) in proportion of 12:6:1 in foundation and under floors and supply of all materials, labour, and T&P etc. required for proper completion of work (NSI)

0.5

2498

1249

... More
First class brick work in 1:6 cement and coarse sand (F.M.1.8 to 2.5) mortar in foundation and plinth including supply of all materials, labour & T&P etc. required for proper completion of work. (CSI No. 6.01)

1

5472

5472

... More
First class brick work in 1:6 cement and coarse sand (F.M.1.8 to 2.5)mortar in Super structure of one Brick thick including supply of all materials, labour & T&P etc. required for proper completion of work (CSI No. 6.01+6.07+6.08)

1

6167

6167

... More
Brick work in foundation & plinth with old dismantled bricks (supplied by department free of cost) and coarse sand of F.M. 1.8 to 2.5 mortar in 1:6 including supply of all other materials, labour, removing mortar & cleaning of old & used bricks,T&P etc complete.(CSI No. 6.18)

0.5

2905

1452.5

... More
Removal of cement mortar from dismantled bricks and stacking in countable position at place as directed by the Engineer in charge, including cost of all labour and T&P required for proper completion of work. (CSI No. 6.22)

0.27

1357

366.39

... More
Mild Steel or Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof work gates etc. wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor. (CSI No. 9.01)

0.4

98843

39537.2

... More
TMT/Tor steel in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bend, hooks and authorized overlapping shall be measured. (Steel shall be arranged by the contractor) (CSI No. 9.03)

0.5

87899

43949.5

... More
12 mm thick plaster with cement mortar consisting of one part of cement & four part of coarse sand (1:4), minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work. (CSI No. 11.07)

25

197

4925

... More
12 mm thick plaster with cement mortar consisting of one part of cement & six part of coarse sand(1:6),minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work. (CSI No. 11.09)

30

187

5610

... More
S/Mixing approved water proofing compound (CICO,DR. FIXIT etc.) in cement mortar in plaster or concrete work in the proportion as recommended by the manufacturer.(CSI No. 11.15)

98

47

4606

... More
4.0 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC (CSI No. 12.04)

4

405

1620

... More
Providing and fixing glass strips of 3.15 mm thickness & 25mm depth in joints of floor and skirting at the time of laying floors, flush with floor level including supply of all materials, labour& T&P etc. required for proper completion of work. (CSI No. 12.13)

6

29

174

... More
Painting or varnishing new iron work in small areas or new wood work with one coat of ready mixed priming paint and one coat of approved superior quality ready mix paint "Luxol" or equivalent brand or varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S. 103-1950. (CSI No. 13.01)

5

77

385

... More
As in item 13.01 above but every coat after the first coat. (CSI No. 13.02)

5

36

180

... More
As in item 13.01 above but for every coat on previously painted old wood or iron work including its sand papering,rubbing and cleaning as required, for proper completion of work. (CSI No. 13.03)

25

49

1225

... More
One priming coat and one coat oil bound distemper on new work including supply of all materials,labour and T&P etc. required for proper completion of the work. (CSI No. 13.08)

350

69

24150

... More
As in item 13.08 but for every coat after the first coat. (CSI No. 13.09)

350

28

9800

... More
As in item 13.08 but for every coat on previously old oil bound distemper surface.(CSI No. 13.10)

10

35

350

... More
Applying Birla or equivalent putty on previousaly brila smoothen surface over one coat of water based cement primer of ICI or equivalent brand for smoothening and levelling of the surface as per requirement and direction of Engineer I/C including cost of all material, labour, T & P etc required for proper completion of work. (CSI No. 13.21)

30

43

1290

... More
Finishing walls with water proof exterior emulsion paint of ACE (ASIAN) or equivalent brand on already well prepared new wall surfaces with one coat of primer (ICI) followed by two coats of ACE exterior empulsion paint to give an even shade including thorough washing with water including as per direction of E/I direction of including cost of all materials, labour, T&P etc requried for proper completion of the work (NSI)

10

68

680

... More
Finishing walls with water proof exterior emulsion paint of ACE (ASIAN) or equivalent brand on already well prepared old wall surfaces with one coat of primer (ICI) followed by two coats of ACE exterior empulsion paint to give an even shade including thorough washing with water including as per direction of E/I direction of including cost of all materials, labour, T&P etc requried for proper completion of the work (NSI)

204

51

10404

... More
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metres.(CSI No. 15.01)

1

575

575

... More
Dismantling reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed by the Engineer-Incharge within a distance of 60 metres. (CSI No. 15.03)

0.5

1277

638.5

... More
Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materials as directed by the Engineer In-charge within a distance of 60 metres. (CSI No. 15.05)

5

66

330

... More
Dismantling existing plaster including disposal of refuse as directed by the Engineer-I/C within a distance of 60 M. (CSI No. 15.11)

10

47

470

... More
Renewing panes of 4.8 to 5.7 mm glass including supply of glass with putty and brads including supply of all materials, labour and T&P etc. required for proper completion of the (b) glass of 4 mm thick. (CSI No. 20.04)

5

838

4190

... More
Easing door and windows. (CSI No. 20.05)

10

98

980

... More
Fixing panes of glass with and including putty brads and including supply of all materials,labour and T&P etc. required for proper completion of the work but excluding cost of glass. (CSI No. 20.07)

5

255

1275

... More
Labour for fixing door bolts or hinges or tower bolts or hasp and staples or handles etc.to doors and window. (CSI No. 20.10)

6

29

174

... More
Disposal of rubbish / debris out side the UPPCL area as per direction of Er/in- charge including cartage, labour and materials, T&P etc. required for proper completion of the work. (No. deduction for voids shall be made). (CSI No. 20.16)

2

370

740

... More
Supply and replacing of following chromium polished iron fittings including cost of nuts, bolts etc.complete (CSI No. 20.17) (c) Tower bolts 10 mm dia x 100 mm long.

12

64

768

... More
Supply and replacing of following chromium polished iron fittings including cost of nuts, bolts etc.complete (CSI No. 20.17) (d) Iron hinges 100 mm size.12 gauge.thick

18

77

1386

... More
Supply and replacing of following chromium polished iron fittings including cost of nuts, bolts etc.complete (CSI No. 20.17) (f) M.S.handles 100 mm size

12

39

468

... More
Supply and replacing of following chromium polished iron fittings including cost of nuts, bolts etc.complete (CSI No. 20.17) (h) L-drop 16 mm dia x 200 mm long.

8

149

1192

... More
Providing and fixing of 110 mm dia PVC pipe 4Kg/ Sq.cm for with special such as Tee, bend, socket, elbow etc including supply of all labour,material,T & P etc complete required for proper completion of work. (CSI No. 26.18)

18

189

3402



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.