If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date29 Apr 2020
Closing Date6 May 2020
Tender Amount₹ 3,30,000
Costs
EMD
₹ 3,300Document Cost
₹ 413Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_DVVNL_463768_1Bid Award Id
ViewTender No
01/EDC-I(M)/2020-21Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Removal of existing ACSR Weasel conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.
3200
-
-
Removal of existing ACSR Dog/Raccon conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.
500
-
-
Removal of Arial Bunch Conductor 3x50 sq mm. existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.
100
-
-
Removal of Arial Bunch Conductor 3x95/120 sq mm. existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.
100
-
-
Replacement of 9/8.5 Mtrs. Long damaged PCC pole by opening of all existing accessories from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. required for proper completion of work.
92
-
-
Replacement of 11/13 Mtrs. Long damaged ST pole by opening of all existing accessories from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. required for proper completion of work.
16
-
-
Replacement of 8.5/9 Mtrs. Long damaged PCC Duoble Pole by opening of all existing Accessories, T/F from damaged Double pole properly and removal of damaged poles and Erection of New Double Pole at same place including fixing of all existing accessories on the New Double Pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. required for proper completion of work.
2
-
-
Replacement of 11/13 Mtrs. Long damaged ST Duoble Pole by opening of all existing Accessories, T/F from damaged Double pole properly and removal of damaged poles and Erection of New Double Pole at same place including fixing of all existing accessories on the New Double Pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. required for proper completion of work.
2
-
-
Mounting of 25 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
2
-
-
Mounting of 63 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
2
-
-
Mounting of 100 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
2
-
-
Installation of stay set with grouting and Nuzzling etc. as per RESPO drawing /norms along with all routine material to be used for such works.
8
-
-
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
6
-
-
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasel conductor in 11 KV/ LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
3200
-
-
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Dog/Raccon Conductor in 11 KV/33KV lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
500
-
-
Laying, sagging and stringing and jumpering / binding etc. of new & old Arial Bunch Conductor 3x50 sq mm. in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
100
-
-
Laying, sagging and stringing and jumpering / binding etc. of new & old Arial Bunch Conductor 3x95/120 sq mm. in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
100
-
-
Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.
4
-
-
Guarding of 33 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.
4
-
-
Chopping of Tree branches to Clear the line route to give horizontal and vertical clearance to the line including cost of labour T&P etc.
16
-
-
Re-sagging of loose 11 KV./L.T. line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work.
8
-
-
Re-sagging of loose 33 KV line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work.
6
-
-
Re-nuzzling of old stay set by opening old binding for better straightening of pole and re-sag the existing conductor of H.T/L.T line properly as per direction of supervising engineer.
6
-
-
Straightening of 8.5/9 Mtr. Long PCC/ST/Rail Pole tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work.
2
-
-
Carriage of 11/13 Mtrs. long Damaged ST pole from Pit Site to J.E. Store/Store Center Mathura through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
20
-
-
Videography/Photography of work site before & after completion of work.
2
-
-
Evaluation Notes How It Works ?