If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender

Works
Eprocure
Opening Date29 Apr 2020
Closing Date6 May 2020
Tender Amount₹ 3,30,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removal of existing ACSR Weasel conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.

3200

-

-

... More
Removal of existing ACSR Dog/Raccon conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.

500

-

-

... More
Removal of Arial Bunch Conductor 3x50 sq mm. existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.

100

-

-

... More
Removal of Arial Bunch Conductor 3x95/120 sq mm. existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.

100

-

-

... More
Replacement of 9/8.5 Mtrs. Long damaged PCC pole by opening of all existing accessories from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. required for proper completion of work.

92

-

-

... More
Replacement of 11/13 Mtrs. Long damaged ST pole by opening of all existing accessories from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. required for proper completion of work.

16

-

-

... More
Replacement of 8.5/9 Mtrs. Long damaged PCC Duoble Pole by opening of all existing Accessories, T/F from damaged Double pole properly and removal of damaged poles and Erection of New Double Pole at same place including fixing of all existing accessories on the New Double Pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. required for proper completion of work.

2

-

-

... More
Replacement of 11/13 Mtrs. Long damaged ST Duoble Pole by opening of all existing Accessories, T/F from damaged Double pole properly and removal of damaged poles and Erection of New Double Pole at same place including fixing of all existing accessories on the New Double Pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. required for proper completion of work.

2

-

-

... More
Mounting of 25 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.

2

-

-

... More
Mounting of 63 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.

2

-

-

... More
Mounting of 100 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.

2

-

-

... More
Installation of stay set with grouting and Nuzzling etc. as per RESPO drawing /norms along with all routine material to be used for such works.

8

-

-

... More
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.

6

-

-

... More
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasel conductor in 11 KV/ LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work

3200

-

-

... More
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Dog/Raccon Conductor in 11 KV/33KV lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work

500

-

-

... More
Laying, sagging and stringing and jumpering / binding etc. of new & old Arial Bunch Conductor 3x50 sq mm. in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work

100

-

-

... More
Laying, sagging and stringing and jumpering / binding etc. of new & old Arial Bunch Conductor 3x95/120 sq mm. in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work

100

-

-

... More
Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.

4

-

-

... More
Guarding of 33 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.

4

-

-

... More
Chopping of Tree branches to Clear the line route to give horizontal and vertical clearance to the line including cost of labour T&P etc.

16

-

-

... More
Re-sagging of loose 11 KV./L.T. line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work.

8

-

-

... More
Re-sagging of loose 33 KV line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work.

6

-

-

... More
Re-nuzzling of old stay set by opening old binding for better straightening of pole and re-sag the existing conductor of H.T/L.T line properly as per direction of supervising engineer.

6

-

-

... More
Straightening of 8.5/9 Mtr. Long PCC/ST/Rail Pole tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work.

2

-

-

... More
Carriage of 11/13 Mtrs. long Damaged ST pole from Pit Site to J.E. Store/Store Center Mathura through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)

20

-

-

... More
Videography/Photography of work site before & after completion of work.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.