Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date22 Apr 2024
Closing Date14 Jun 2024
Tender AmountRefer Documents
Costs
EMD
₹ 9,100Document Cost
₹ 1,000Tender Fee
Refer Documents
Summary
55/ewc(k)/2023-24
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_922867_1Bid Award Id
ViewTender No
55/EWC(K)/2023-24Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Structure for LA with P&F
1
-
-
Structure for 33 KV VCB with P&F
1
-
-
Structure for CT with P&F
1
-
-
Strcuture for 33 KV fuse set
1
-
-
90 lbs Rail pieces for T/F
6.92
-
-
Power T/F Plinth 3.46x4.46 meter having
1
-
-
Chemical Pipe earthing as add. (for T/f, LA, CT & PT) with GI Strip (50x6) mm
9
-
-
Rubber Mat
2
-
-
Control cable 4x2.5 sqmm
100
-
-
Control cable 2x2.5 sqmm
100
-
-
Indoor earthing
0.5
-
-
Painting of S/s structure
1
-
-
11 KV Fuse set with fixing clamps
1
-
-
M.S Top channel 100x50x6 mm 2240mm long
1
-
-
M.S Top channel 100x50x6 mm 2028mm long for TPMO & fuse set
3
-
-
Grouting of 8.5 Mtr PCC Pole
2
-
-
Danger Board
2
-
-
Safe Carriage Following Item From Any Store Center & Local Authorized Supplier ( Under Juridiction of DVVNL) To Site Store With Loading Unloading At Both End Respectively
-
-
-
Structure of Bus Isolator
1
-
-
Structure of Post Insulator
2
-
-
Structure of Lightning Arrester
1
-
-
Structure of 33 KV VCB
1
-
-
Structure of CT
1
-
-
Structure of 33 KV Fuse Set
1
-
-
90 lbs Rail Pieces for T/F
6.92
-
-
Chemical Pipe Earthing as. Add. ( for T/F,, LA, CT & PT)
9
-
-
Rubber Matt
2
-
-
11 KV Cable Box Mounted with S/G & T/F
6
-
-
11 KV Cable Box 3x185 sq.mm cable H/S J/K Indoor
1
-
-
11 KV Cable Box 3x185 sq.mm cable H/S J/K Outdoor
1
-
-
Control Cable 4x2.5 sq.mm
100
-
-
Control Cable 2x2.5 sq.mm
100
-
-
11 KV Fuse Set with Fixing Clamp
1
-
-
MS Top Channel 100x50x6 mm 2240mm long
1
-
-
MS Top Channel 100x50x6 mm 2028mm long for TPMO & Fuse Set
3
-
-
Indoor Earthing
0.5
-
-
Danger Board
2
-
-
33 KV bus Isolator
1
-
-
33 KV Post Insulator
6
-
-
33 KV LA
3
-
-
33 KV VCB 800 A,750 MVA
1
-
-
33 KV Control Pannel for Single T/F
1
-
-
33 KV CT 200/100/1 A
3
-
-
33 KV Fuse Set
1
-
-
PG Clamp for Dog to Dog
12
-
-
ACSR Dog Conductor
50
-
-
11 KV VCB I/C CTR 600/300/5 A, 350 MVA
1
-
-
11 KV VCB out going 200/100/5 A
2
-
-
11 KV Bus Coupler 350 MVA
1
-
-
11 KV 3x300 XLPE Cable
160
-
-
11 KV 3x185 sq.mm XLPE Cable
70
-
-
8.5 mtr PCC Pole
2
-
-
11 KV TPMO with Fixing Clamp
1
-
-
Earthing of Pole by MS Earthing Rod 20x2500 mm & 6 SWG Earthing Wire
2
-
-
Power T/F Plinth
-
-
-
Making of power T/F plinth suitable for 5 MVA with 1:2:4 CC Sand ratio, thereafter CC work on top in size of 3.46x4.46 Mtr having 0.5 Mtr below Groung level and 0.4 Mtr above ground level thereafter plastering all around the open portion.
1
-
-
Fitting of 3.46 mtr. Long 2 No. rail piece on power T/F plinth during erection of power transformer.
6.92
-
-
Dismentalling of following power T/F including draining of T/F oil from radiators if necessary dismentalling of all accessories, as Radiators, vent pipe conservator Tank from main Tank of T/F (Either one or all) and its proper stacking.
-
-
-
5 MVA, 33/11/6.6 KV T/Fwith 2 No crane
2
-
-
Shifting of T/F Tank Empty/filled by dragging or by crane of following running/damaged T/F from unloading point to plinth of T/F or from T/F plinth to shifting/loading point distance upto 25 meters and its placing in proper alignment on plinth of Transformer.
-
-
-
5 MVA, 33/11/6.6 KV T/F with 2 No crane
2
-
-
Erection & welding of neutral support structure with the help of welding including earthing in proper alignment and all related work and fixing of flexible copper bond
3
-
-
Erection and grouting of neutral support structure with 1 : 4 : 8 CC ratio in proper alignment and plinth 15 Cm. above ground level and smooth finish
3
-
-
Erection of Cable Support Structure for 11 KV 3x300 sq.mm. with proper Connection to T/F LV side.( as per Norms) (Material will be provided by working agency)
3
-
-
Erection and grouting of Cable Support Structure structure with 1 : 4 : 8 CC ratio in proper alignment and plinth 15 Cm. above ground level and smooth finish (Material will be provided by working agency)
3
-
-
Digging of trench for laying of cable in different situations as per site requirement.
100
-
-
Laying of 11 KV 3x300 sq.mm XLPE cable in above digged trench covering with bricks and back filling and proper ramming.
160
-
-
Laying of 11 KV 3x185 sq.mm XLPE cable in above digged trench covering with bricks and back filling and proper ramming.
70
-
-
Making indoor/outdoor joints of 11 KV 3x300 sq.mm. Cable where the cable is being laid. Jointing Kit will be provided by the TKC
6
-
-
Making indoor/outdoor joints of 11 KV 3x185 sq.mm. Cable where the cable is being laid. Jointing Kit will be provided by the TKC
2
-
-
Mounting of cable box on double pole/cable support structure.
1
-
-
Dismentalling of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection.
2
-
-
Connecting of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection.
3
-
-
Dismentalling of Neutral Support Structure
2
-
-
Dismentalling of Cable Support Structure
2
-
-
Making all control cable connection in C.T., VCB mechanism, C.T. Junction Box, Transformer Control relay panel D.C. Battery Charger, ACDB Transformer indication board 11KV switchgear including proper termination ferruling and dressing with related work whichever is required including T/F work.
1
-
-
Mounting of cable box on pole, Cable support structure or 11 kV panel with handling of concerning cable and its proper fixing. (Without Pipe)
1
-
-
Erection & Mounting of Bus Isolator on Structure
1
-
-
Erection & Mounting of LA on Structure
3
-
-
Erection & Mounting of CT on Structure
3
-
-
Erection & Mounting of Post Insulator on Structure
6
-
-
Erection & Mounting of 33 KV VCB on Structure
1
-
-
Erection & Mounting of 33 KV Fuse set on Structure
1
-
-
Installation of 33 KV Single T/F Control Pannel at Control Room
1
-
-
Painting of all new MS structures
1
-
-
Laying of Control Cable 4x2.5 sq.mm In trench with Sand
100
-
-
Laying of Control Cable 2x2.5 sq.mm In trench with Sand
100
-
-
Erection of Bus Isolator Structure with plinth & foundation
1
-
-
Erection of LA Structure with plinth & foundation
1
-
-
Erection of CT Structure with plinth & foundation
1
-
-
Erection of Post Insulator Structure with plinth & foundation
2
-
-
Erection of 33 KV VCB Structure with Plinth & Foundation
1
-
-
Erection 33 KV Fuse Set Structure with plinth & foundation
1
-
-
Shifting & Erection of 11 KV VCB out going 200/100/5 A at Control Room with proper connection (as per DVVNL rule)
2
-
-
Shifting & Erection of Bus Coupler, 350 MVA at Control Room with Proper Connection. (as per DVVNL rule)
1
-
-
Shifting & Erection of 11 KV VCB I/C CTR 600/300/5 A at Control Room with proper connection (as per DVVNL rule)
1
-
-
Erection Indoor Earthing complete (as per Norms)
0.5
-
-
Making Section Pole Complete with All. Acc.(TPMO,Fuse set etc.)
1
-
-
Concreting OF 8.5 Mtr PCC Pole
2
-
-
Earthing of LA, CT, Bus Isolator, Post Insulator, VCB & Fuse set etc structure with GI Strip 50x6 mm with chemical Pipe earthing & earth mat
7
-
-
Erection of Chemical Pipe Earthing 80mm Dia 3 Mtr long Pipe
9
-
-
Erection & Welding of Power T/F Body Earthing (2 No.) in Proper Alignment & All related works
3
-
-
Erection of Rubber matt
2
-
-
Erection of ACSR Dog Conductor from Gantry to T/f alongwith with Protectin equipments
50
-
-
Erection of Connecting (Bus isolator, Post Insulator, LA And Bus Bar with Dog Conductor jumphering) Dog to Dog using PG Clamp
12
-
-
Making all joints through ACSR Dog Conductor as per Norms by DVVNL
1
-
-
Erection of Earthing of Pole by MS Earthing Rod 20x2500 mm & 6 SWG Earthing Wire
2
-
-