Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Hiring of Vehicles
Eprocure
Opening Date23 Sep 2024
Closing Date28 Sep 2024
Tender AmountRefer Documents
Costs
EMD
₹ 15,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Summary
Tender No 08/2024-2025
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_951201_4Bid Award Id
ViewTender No
Tender no 08/2024-2025Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Stay Set
88
-
-
Stay Wire
528
-
-
Top Channel M.S 100x50x2240mm
13
-
-
Dropper Channel M.S 100x50x2000mm
1
-
-
Number Plate
52
-
-
Danger Board with Clamp
52
-
-
Barbed Wire
130
-
-
Aluminium Lug
40
-
-
Aluminium Paint
5
-
-
Ston pad 300x300x75mm
65
-
-
Clamp With Nut & Bolts
160
-
-
X Bracing MS Angle
12
-
-
PG Clamp
72
-
-
11KV V Type X Arm
39
-
-
T Off Channel with Clamp
12
-
-
F Bracket for PCC Pole 8.5 Mtr
42
-
-
F Bracket for STP Pole 11 Mtr
23
-
-
X Arm Clamp for PCC Pole 8.5 Mtr
42
-
-
X Arm Clamp for STP Pole 11 Mtr
23
-
-
I/D & O/D Cable Jointing kit 3*185mm
4
-
-
Guarding Angle
20
-
-
Guarding Clamp
20
-
-
Guarding Wire
440
-
-
Nut & Bolt Off Size
1
-
-
Part B:- Carriage of following from Site Store to work site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. (Distance 00-50Kms.) ST pole 11/13 Mtr. long
23
-
-
PCC pole 8.5 Mtr. Long
42
-
-
3X120MM 11kv Xlpe Cable
50
-
-
11KV XLPE Cable 3x185sqmm
220
-
-
11Kv Pilfer Proof meterring Cubicle
1
-
-
11KV VCB O/G CTR 200/100/5A
1
-
-
Line material viz. Aerial bunch conductor/Weasal conductor/Dog and other line material etc.
5
-
-
Erection of single pole 11 Mtr. long STP pole including fixing of accessories for 11Kv line as per RESPO Norm.
23
-
-
Erection of 8.5 Mtr. long PCC pole including fixing of accessories for 11 Kv line as per RESPO Norm.
42
-
-
Grouting of PCC Pole and STP Pole, including fixing of accessories for 11 Kv line as per RESPO Norm.
65
-
-
Guarding of HT line
20
-
-
Erection of double pole on 8.5 Mtr. long PCC poles including fixing of accessories for double pole as per RESPO norm.
42
-
-
Erection of double pole on 11 Mtr. long STP poles including fixing of accessories for double pole as per RESPO norm.
23
-
-
Erection of stays 11 KV line and grouting in 1:2:4 ratio (Cement sand, and bricks blast) as per RESPO norms.
88
-
-
Earthing of pole as per RESPO norms.
52
-
-
Laying sagging stringing and binding and jumpering etc of ACSR Weasal conductor as per santion Estimate in supervisioning of Engineer
6304
-
-
Laying sagging stringing and binding and jumpering etc of 3X120MM 11kv Xlpe Cable
50
-
-
Laying sagging stringing and binding and jumpering etc of 11KV XLPE Cable 3x185sqmm
220
-
-
Installation of 11Kv Pilfer Proof meterring Cubicle as per santion Estimate in supervisioning of Engineer.
1
-
-
Installation of 11KV VCB O/G CTR 200/100/5A 350MVA as per santion Estimate in supervisioning of Engineer
1
-
-
Testing & Commisioning of 11KV VCB O/G CTR 200/100/5A 350MVA
1
-
-
Chemical Earthing of 11 KV VCB
1
-
-
Making Connection of I/D & O/D Cable Jointing kit 3*120 and 3*185mm
2
-
-
Carrige of old Dismantal material of 11 Kv LT line from Site to store.
1
-
-
Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.
12
-
-
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
20
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements