Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date28 Aug 2024
Closing Date4 Sep 2024
Tender AmountRefer Documents
Costs
EMD
₹ 5,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
Edch-24/2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_949907_1Bid Award Id
ViewTender No
EDCH-24/2024-25Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
LT Clamp
12
-
-
Shackle Insulator
12
-
-
F Bracket
130
-
-
Dead End Clamp
2
-
-
Suspension Clamp
11
-
-
Earthing Complete
18
-
-
Pearcing Clamp
20
-
-
Nut, Bolt & Washer
10
-
-
Scope of work
-
-
-
Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)
-
-
-
ST Pole 11 Mtr. Long
3
-
-
Pcc Pole 8.5 Mtr. Long
15
-
-
16 KVA T/F
7
-
-
Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
-
-
-
ST Pole 11 Mtr. Long
3
-
-
Pcc Pole 8.5 Mtr. Long
15
-
-
Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work
-
-
-
Stone Pad
6
-
-
Holding Clamp
229
-
-
LT Clamp
12
-
-
Shackle Insulator
12
-
-
F Bracket
130
-
-
Dead End Clamp
2
-
-
Suspension Clamp
11
-
-
Pearcing Clamp
20
-
-
Nut, Bolt & Washer
10
-
-
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
18
-
-
Installation of following T/F on old/newly constructed pole in proper alignment direction & making HT/LT connection.
-
-
-
16 KVA T/F
7
-
-
Safe Dismenteling of old and used following T/F from Pole with opening of all HT/LT Jumpers, all works which required for dismentling of T/F and carriage it up to Store Hathras/ J.E Store all cost of labour and T&P which required for completion of work
-
-
-
10 KVA T/F
7
-
-
Safe Dismenteling of old 5 MVA T/F from Foundation with opening of all HT Jumpers, opening of radiators, draining of oil all works which required for dismentling of power T/F and carriage it from switch yard to out side boundary all cost of labour and T&P which required for completion of work
1
-
-
Construction of Plinth and foundation Suitable for 5 MVA T/F above ground level 0.4 Mtr & below the ground level of 0.5 Mtr After Exavation of 4 "earth brick ballast shall be provided and remaining will be done properly After ballast shall be provided a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand.
1
-
-
Earthing of power T/F
3
-
-
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
20
-
-
Back Cartage of Following Matarial
-
-
-
ACSR Conductor Scrap
170
-
-
Iron/steel Scrap
208
-
-