If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Civil And Construction
Excavation
Eprocure
Opening Date17 Jan 2025
Closing Soon22 Jan 2025
Tender Amount₹ 8,90,000
Costs
EMD
₹ 9,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DVVNL_991683_2Tender No
72/EDC-I(M)/2024-25Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Carriage of 25/63 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends
8
-
-
... More
Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
28
-
-
... More
Erection of single pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
134
-
-
... More
Erection of single pole structure 11 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
6
-
-
... More
Erection of Double pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
8
-
-
... More
Erection of Double pole structure 11 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
3
-
-
... More
Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
20
-
-
... More
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
75
-
-
... More
Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
4500
-
-
... More
Laying, sagging stringing and binding of Arial Bunch Conductor 3x50/95/120 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual.
2900
-
-
... More
Laying, sagging stringing and binding of LT PVC Cable on the erected PCC pole/STP including jumpering as per RESPO manual.
120
-
-
... More
Chopping of Tree branches to Clear the route properly.
180
-
-
... More
Cutting of CC Road for making depth foundation for erection of pole.
15
-
-
... More
Mounting of 250 KVA Transformer on the Double pole/Plinth structures and connections thereof.
3
-
-
... More
Mounting of 25/63 KVA Transformer on the Double pole/Plinth structures and connections thereof.
8
-
-
... More
Construction of plinth of 250 KVA T/f size 5’x5’x4’ above ground level and one. Ft. below the ground level of 9’’ after excavation of 4 earth brick ballast shall be provided and hammering will be done properly. After that a retaining wall of 9 width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. after this brick ballast shall be provided upto 6 from the earth level and proper hammering shall be done. One No. Jall of 12 mm. MS tore shall be fixed in the hollow of plinth and one. Ft. thick RCC in ration of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm. thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work.
3
-
-
... More
Body and neutral earthing of 250 KVA transformers by digging pits 6” dia up to 3 mtr deep including inserting lowering 80mm dia G.I. and insert 50mm G.I. pipe chemical filled pipe (Pipe in pipe earthing) I.S.I. Mark B-Grade connecting with G.I. flat 50x6 mm Power Transformer to 80mm dia G.I. pipe and filling of chemical mixture around the G.I. pipe up to 3mtr. Including making of chamber.
6
-
-
... More
Making of wire mesh fencing around constructed 250 KVA T/f plinth 4mtr. x 3 mtr. with proper grouting Erection and construction of Toe-wall around the transformer plinth including digging of pits and making wall 9 inch wide & 30 cm. under the ground level and 30 cm. up to the ground level and making pocket Filling the concreting for grouting of wire mesh fencing and plastering around the wall in ratio 1:4 cement and sand providing of one no. main gate in the wire mesh fencing for shifting the transformer size of gate 8 ft. x 4ft. including fixing of dandala for locking system, (Size of angle iron 50x50x6mm. and size of wire mesh fencing 1.5x2 sq. inch wire gauge 10 SWG.) All material/labour will be arranged by the contractor.
3
-
-
... More
Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material.
120
-
-
... More
Construction of “T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work.
18
-
-
... More
Installation of 11 KV Fuse Set as per RESPO Norms.
8
-
-
... More
Fixing of Distribution Box on the erected pole.
43
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%