Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Electrical and Electronics
Eprocure
Opening Date31 Jan 2024
Closing DateCancelled
Tender Amount₹ 24,00,000
Costs
EMD
₹ 24,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_883799_1Tender No
EDCBNDA-64/2023-24Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Safely cartage of line material viz. conductor, cable, wire, x-arm, clamps, channels, angles, earthing rod, stay etc.
350
-
-
Erection & grouting of SP on PCC/ST Poles 8.5/9.0/11 Mtr. long with complete HT/LT fittings of all accessories as per direction of engineer incharge/RESSPO norms. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual sire requirement, including the cost of labour, T&P and carrier etc. required for proper completion of work.
616
-
-
Erection & grouting of DP structure on PCC/ST Poles 8.5/9.0/11 Mtr. long with complete HT/LT fittings of all accessories as per direction of engineer incharge/RESSPO norms. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual sire requirement, including the cost of labour, T&P and carrier etc. required for proper completion of work.
31
-
-
Erection of stay set complete at digging of pit including the cost of grouting with cement, sand and brick ballast/stone in ratio 1:4:8 as per RESSPO norms alongwith nozeling & binding of stay set, stay.
56
-
-
Laying, sagging, stringing, binding and jumpering of ACSR Weasel conductor on the newly erected poles with fitting of all related accessories as per direction of supervising engineer/RESSPO manual.
99.23
-
-
Guarding of 11 KV over head Lines crossing by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr as per RESSPO Manual with supply of Gaurding angle with clamp & Nut-bolts (Arranged by contractor at his own cost)..
14
-
-
Supply & erection of Nut-Bolts & washers of suitable size (Arranged by contractor at his own cost).
60
-
-
Supply & Fixing of F-Bracket and X-Arm Holding clamps & Nut-Bolts alongwith fitting of all accessories as per RESSPO manual (Arranged by contractor at his own cost).
616
-
-
Fixing of earthing rod as per direction of supervising engineer/RESSPO manual, including the cost of labour, T&P etc. required for proper completion of work.
682
-
-
Chopping of tree branches coming in the vicinity of the lines during the executive of above work.
34
-
-