Dakshinanchal Vidyut Vitran Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender

Works
Civil And Construction
Eprocure
Opening Date4 Dec 2024
Closing Date11 Dec 2024
Tender Amount₹ 10,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Safe cartage of line material viz. conductor, AB/XLPE cable, Jointing Kit, 11 KV Fuse Set, GI earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging.

80

-

-

... More
10/16/25/63 Transformer

20

-

-

... More
Erection of Single support 8.5M PCC Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.

101

-

-

... More
Erection of Single support 9/11 ST Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.

19

-

-

... More
Erection of Double Pole support 8.5M PCC Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.

20

-

-

... More
Grouting of Double Poles as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.

20

-

-

... More
Grouting of Single support PCC Poles as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.

101

-

-

... More
Grouting of Single support 9/11 ST Poles as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.

19

-

-

... More
Erection & Grouting of Stay set as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.

40

-

-

... More
Fixing of Earthing rod as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.

40

-

-

... More
Fixing of T-off Channel as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.

20

-

-

... More
Fixing of Top Channel as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.

10

-

-

... More
Fixing of Dropper Channel as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.

5

-

-

... More
Installation of 10/16/25/63 kv Transformers

20

-

-

... More
Laying & Sagging and Binding ACSR weasel conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.

14.5

-

-

... More
Laying, Sagging and Binding ABC 3x50/3x95/3x120 as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.

80

-

-

... More
Digging hard and Rocky pits for Pole and Stay as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.

20

-

-

... More
Laying of 11 kv XLPE cable 3x185/3x120/3x70 sq.mm XLPE cable as per ISS 1255/1983 of amendment there if by trench less Technology method by deep drilling system. The jop includes the cost of excavation of Earth, laying of cable inside it. The work is to be carried out as per Govt. approved Drg..

100

-

-

... More
Hosting of 11 kv cable on existing/erected support with provision of MS pipe 150mm dia 3 Mtr. Long suitable of 3x185/3x120/3x70 sq.mm cable fixing of proper support and its clamping, jumpering properly as per RESSPO Norms.(All material will be supplied by the contractor)

4

-

-

... More
Installation of Heat Shrinkable type cable jointing kit O/D end Termination suitable for 11 kv XLPE cable confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version thereof if any. (Jointing kit supplied by Dept.)

4

-

-

... More
Fabrication of Hardware materials

30

-

-

... More
11 KV Fuse Set Installation

4

-

-

... More
Guarding of Road crossing & Line

4

-

-

... More
Tree chopping

5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.