Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date5 Feb 2024
Closing Date11 Feb 2024
Tender AmountRefer Documents
Costs
EMD
₹ 7,870Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_889340_1Bid Award Id
ViewTender No
177/EDCE/2023-24Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Replacement of damaged PCC / ST pole by opening of all existing accessories from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories on the new pole etc. as per direction of Executive engineer. It including the cost of all labour, T&P etc. required for proper completion of work.
142
-
-
Replacement of PCC/STP Duoble Pole by opening of all existing Accessories, T/F from damaged Double pole properly and removal of damaged poles and Erection of New Double Pole at same place including fixing of all existing accessories on the New Double Pole etc. as per direction of Executive engineer. It including the cost of all labour, T&P etc. required for proper completion of work.
10
-
-
Removal of existing ACSR Weasel conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Executive Engineer.
3675
-
-
Removal of Arial Bunch Conductor existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Executive Engineer.
195
-
-
Mounting of 16/25 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
3
-
-
Mounting of 63 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
2
-
-
Mounting of 100 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
4
-
-
Installation and grouting of 11 KV stay set with nuzzling etc. as per RESPO norms.
39
-
-
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasel conductor in 11 KV/ LT lines as per RESPO manual and as per direction of Executive engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
27498
-
-
Laying, sagging and stringing and jumpering / binding etc. of new & old Arial Bunch Conductor in LT lines as per RESPO manual and as per direction of Executive engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
275
-
-
Re-sagging, stringing/Binding and Jumpering of loose ACSR Weasel/Dog/Raccon conductor as per direction of Executive engineer. It includes the cost of labour, T&P etc required for proper completion of work.
3600
-
-
Re-sagging, stringing/Binding and Jumpering of loose Arial Bunch Conductor as per direction of Executive engineer. It includes the cost of labour, T&P etc required for proper completion of work.
195
-
-
Re-nuzzling of old stay set by opening old binding for better straightening of pole and re-sag the existing conductor of H.T/L.T line properly as per direction of supervising engineer.
15
-
-
Straightening of Tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work.
90
-
-
Chopping of Tree branches to Clear the line route to give horizontal and vertical clearance to the line including cost of labour T&P etc.
3.5
-
-
Replacement of following broken/damaged/missing accessories by new accessories including opening of the same and refixing.
-
-
-
11 Kv X-Arm
112
-
-
11 KV pin insulator
281
-
-
11 KV disc insulator
134
-
-
11 Kv X-arm clamp, F clamp, DP clamp, LT pin clamp etc.
244
-
-
T/F Base angle
4
-
-
T-off channel
5
-
-
Videography/Photography of work site before & after completion of work.
1
-
-