If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Advertisement Services
Eprocure
Opening Date28 Mar 2023
Closing Date5 Apr 2023
Tender AmountRefer Documents
Costs
EMD
₹ 4,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
Edch-140/2022-23
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_DVVNL_790856_1Bid Award Id
ViewTender No
EDCH-140/2022-23Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
INCOMING OF 600/300//05 AMP 350 MVA
1
-
-
... More
OUT GOING OF 200/100/5 AMP 350 MVA
3
-
-
... More
11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps Abc Bunch and other required line material, if any.
20
-
-
... More
Safe Carriage of following from Electricty Store center Hathras to Pit Site of Work through the Kacha and Pakka road loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-70 Kms.)
-
-
-
... More
100 KVA T/F
4
-
-
... More
250 KVA T/F
3
-
-
... More
Dismentling of damaged following accessories
-
-
-
... More
OLD INCOMING OCB
1
-
-
... More
OLD OUTGOING OCB
3
-
-
... More
100/63KVA T/F
4
-
-
... More
Errection of following Poles including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
-
-
-
... More
8.5/9 Mtr Long PCC Pole
7
-
-
... More
STP (SP-33) 9.0/11 /13Mtr.
2
-
-
... More
Double pole complet fitting
4
-
-
... More
Fixing INCOMING OF 600/300//05 AMP 350 MVA
1
-
-
... More
Fixing OUT GOING OF 200/100/5 AMP 350 MVA
3
-
-
... More
Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
21
-
-
... More
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
16
-
-
... More
Laying, sagging and stringing and Nozzling / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
-
-
-
... More
ACSR Dog / Racoon Conductor
299
-
-
... More
LT PVC Cable 3.5*400
55
-
-
... More
LT ABC Cable 3*120 sqmm
345
-
-
... More
Fixing of Following Material
-
-
-
... More
TPMO
3
-
-
... More
Fuse Set
3
-
-
... More
Distributions Box
5
-
-
... More
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
40
-
-
... More
Safe Installation of following New/Repaired cousted T/F on newly constructed double pole in proper alignment direction & making all HT/LT connection.
-
-
-
... More
100 KVA T/F
4
-
-
... More
250 KVA T/F
4
-
-
... More
Construction of New plinth of size 5' * 5 * 4' above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand.
3
-
-
... More
Pipe earthing of medium Power Transformers cost of Matarial and labour which requrired for completion of work.
6
-
-
... More
Net Fencing Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut
3
-
-
... More
Construction of round plinth around the S.T. Poles / RS Joists / Rails/PCC will be done with cement, sand and concrete in 1:3:6 ratio of size 450 mm. dia & 600 mm height (300 mm. under the ground + 300 mm. the ground). The plinth should be plastered with ½ inch thick cement and sand of ratio 1:4 & taper rounding the upper most part of the plinth. The rate will include all cost of material, labour and T&P etc. for completion of the above work which will be provided by the contractor at his own cost.
7
-
-
... More
Installation of extra ''T'' on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc, required for proper completion of work. The "T" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material.
8
-
-
... More
Back Cartage from Dump Side to Store Center Hathras
-
-
-
... More
SCRAP OF OLD INCOMING OCB
1
-
-
... More
SCRAP OF OLD OUTGOING OCB
3
-
-
... More
100/63 KVA T/F
3
-
-
... More
Line Meterial Scrape Cable
120
-
-
Evaluation Notes How It Works ?