Dakshinanchal Vidyut Vitran Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date10 Dec 2024
Closing Soon26 Dec 2024
Tender Amount₹ 7,72,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Stay Set Complete

2

-

-

... More
T/F Base Angle fo Tail Less Unit

2

-

-

... More
Copper Flat Strips

8

-

-

... More
Part-B (Erection work) Cartiage of 250 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)

3

-

-

... More
Cartiage of 33 KV RMU Unit with Power pack 200 KVA to 1000 KVA (2 WAY) from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)

2

-

-

... More
Cartiage of 33 KV 3x185 sqmm Jointing Kit I/D & 33 KV 3x185 sqmm Jointing Kit O/D from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)

16

-

-

... More
Cartiage of 33 KV 3x185 sqmm XLPE Cable from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)

60

-

-

... More
Cartiage of LT XLPE Cable 1x400 sqmm, LT XLPE Cable 3.5/x240 sqmm & 1x400 sqmm Al. Cable from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)

136

-

-

... More
Cartiage of S.T. Pole 11 Mtr. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)

6

-

-

... More
Cartiage of PCC Pole 8.5 Mtr. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)

4

-

-

... More
Cartiage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) Line material viz. Aerial bunch conductor/Weasal conductor/Dog/ Rabbit, G.I. wire, earth wire, Top Channel, cross arm, angle, channel, insulators, clamps, Dist. Box, and other line material, if required in Estimate/Package.

50

-

-

... More
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 11 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.

2

-

-

... More
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Double Pole 11 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.

2

-

-

... More
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Doube Pole 8.5 Mtr. PCC including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.

2

-

-

... More
Laying of LT XLPE Cable 1x400 sqmm & LT XLPE Cable 3.5x240 sqmm as per RESPO Norms and direction by superivising by Engineer.

136

-

-

... More
Installation of 250 KVA T/F on newly constructed Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work

3

-

-

... More
Laying sagging stringing and binding and jumpering of ACSR Weasel Conductor at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.

460

-

-

... More
Laying sagging stringing and binding and jumpering of ABC3x120 sqmm at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.

40

-

-

... More
Filling of 33 KV 3x185 sqmm Indoor Jointing Kit and making connection as per direction of supervising engineer.

8

-

-

... More
Filling of 33 KV 3x185 sqmm Outdoor Jointing Kit and making connection as per direction of supervising engineer.

8

-

-

... More
Installation of 11 KV D.O. Fuse set as per RESPO norms and direction by superivising Engineer.

3

-

-

... More
Fixing of LT Protection SYS for 250 KVA T/F Tail Less Unit on Distribution T/Fs as per Site requirment and RESPO Norms & Direction by superivising Engineer.

2

-

-

... More
Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.

2

-

-

... More
Installation Testing & Commissoning of 33 KV RMU 02 WAY including fixing of all accessories, T&P and Labour as per RESPO Norms and direction by supervising Engineer.

2

-

-

... More
Fixing of earthing rod as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.

6

-

-

... More
Laying and dressing of 33 KV under ground cable of size 3x 185 sqmm in the trench 450 mm fine sand cushion beneath and 150 mm fine sand cushion above the cable. The cable shall be duly protected by 1" class brick two on either side and third on top of the cables. Laid in series one after the other. The work includes supplying of fine sand & bricks refilling and ramming of the left out soil closing the trench and leveling Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cables laying work includes unroling cutting / megaring & sealing both ends of the cable.

60

-

-

... More
Construction of new plinth for 250 KVA T/F of size 5' * 5 * 4' above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. .(All material provided by the contractor at his own cost)

3

-

-

... More
Net Fencing for 250 KVA T/F Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut ..(All material provided by the contractor at his own cost)

3

-

-

... More
for the work of Chemical Body/Neutral Earthing for 250 KVA T/Fs as per RESPO Manual.(All material provided by the contractor at his own cost)

6

-

-

... More
Construction of new plinth for 33 KV RMU T/F of size 6' *6 * 3' above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. .(All material provided by the contractor at his own cost)

4

-

-

... More
Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6/8 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.