Dakshinanchal Vidyut Vitran Nigam Limited Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender

Works
Electrical and Electronics
Eprocure
Opening Date22 Apr 2024
Closing Date7 Jun 2024
Tender Amount₹ 1,64,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Aluminium Lug

108

-

-

... More
M.S. Top Channel 125x65x2240 mm

185

-

-

... More
LT Shackle Insulator

153

-

-

... More
LT Shackle Insulator clamp

22

-

-

... More
M.S. Angle 75x75x6x2228 mm

350

-

-

... More
Suspension Clamp

512

-

-

... More
Suspension Clamp with eyehook

146

-

-

... More
Dead End Clamp

237

-

-

... More
I Hook

44

-

-

... More
D. Box Clamp

852

-

-

... More
M.S. Dropper Channel 100x50x2028 mm

193

-

-

... More
Stay Complete

735

-

-

... More
Al. Binding Wire 06mm

214

-

-

... More
F-bracket

163

-

-

... More
M.S. T-off Channel

43

-

-

... More
H.T. T complete

52

-

-

... More
Nut & Bolt for shackle Insulator

156

-

-

... More
Clamp with Nut & Bolt

383

-

-

... More
Clamp for T-Channel

32

-

-

... More
Danger Board with clamp

36

-

-

... More
11 KV V Type Cross Arm clamp

175

-

-

... More
11 KV Cross Arm holding clamp

340

-

-

... More
11 KV PCC Pole clamp

10

-

-

... More
H.T. T Channel

6

-

-

... More
MCCB Unit LT

3

-

-

... More
T/F clamp

21

-

-

... More
Part -B (Work/ Erection) Carriage of ST Pole 11 Mtr Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)

27

-

-

... More
Carriage of PCC Pole 8.5 Mtr. Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)

1168

-

-

... More
Carriage of 400 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)

7

-

-

... More
Carriage of 250 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)

72

-

-

... More
Carriage of 100 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)

76

-

-

... More
Carriage of 63 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)

33

-

-

... More
Carriage of 25 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)

69

-

-

... More
Carriage of 16 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)

95

-

-

... More
Cartiage of (LT cable 1x120 & 1x400 and LT XLPE cable 3.5x50sqm, 3.5x95/120/150/240 sqm) from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)

5885

-

-

... More
Cartiage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. Aerial bunch conductor/Weasal conductor/Dog/ Rabbit, G.I. earth wire, cross arm, angle, channel, insulators, clamps, Dist. Box, and other line material, if required in Estimate/Package.

200

-

-

... More
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 11 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.

27

-

-

... More
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) Single Pole on 8.5 Mtr. long PCC poles including fixing of all accessories, barbed wire for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.

896

-

-

... More
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) Double Pole on 8.5 Mtr. long PCC poles including fixing of all accessories, barbed wire for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.

136

-

-

... More
Laying sagging stringing and binding and jumpering of ACSR Weasel Conductor at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.

18720

-

-

... More
Laying sagging stringing and binding and jumpering of 3x50 sqmm ABC at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.

580

-

-

... More
Laying sagging stringing and binding and jumpering of 3x95 sqmm ABC at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.

22181

-

-

... More
Laying sagging stringing and binding and jumpering of 3x120 sqmm ABC at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.

610

-

-

... More
Laying of L.T. Cable size 1x120 sqmm & 1x400 sqmm LT XLPE cable 3.5x50sqm, 3.5x95/ 120/ 150/ 240 sqm as per RESPO Norms and direction by superivising by Engineer.

5885

-

-

... More
for the work of Chemical Earthing for 250 KVA/400 KVA T/Fs as per RESPO Manual.(All material provided by the contractor at his own cost)

146

-

-

... More
Construction of plinth of size 5' * 5 * 4' above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. .(All material provided by the contractor at his own cost)

73

-

-

... More
Net Fencing Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut ..(All material provided by the contractor at his own cost)

2336

-

-

... More
Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.

735

-

-

... More
Fixing of earthing rod as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.

566

-

-

... More
Fixing of Danger Boards With clamps (shock Proof, Rust Proofs) on Poles as per RESPO norms.

36

-

-

... More
Installation of 400 KVA T/F on existing Plinth proper alignment direction & making HT/LT connection.

7

-

-

... More
Installation of 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.

72

-

-

... More
Installation of 100 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.

76

-

-

... More
Installation of 63 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.

33

-

-

... More
Installation of 25 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.

69

-

-

... More
Installation of 16 KVA T/F on single/double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.

95

-

-

... More
Fixing of LT dustribution boxes on already errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement.

414

-

-

... More
Installation of 11 KV D.O. Fuse set as per RESPO NORMS

210

-

-

... More
Fixing of TPMO with Polymer insulator as per Site requirment and RESPO Norms.

174

-

-

... More
Fixing of Tellless Unit on Distribution T/Fs as per Site requirment and RESPO Norms.

16

-

-

... More
Making HT 'T' off connection on existing mains labour, T &P and carrier etc. required for proper completion of work.

52

-

-

... More
Fixing of MCCB Unit LT on Distribution T/Fs as per Site requirment and RESPO Norms.

3

-

-

... More
Removal and Cartiage of old & Used Material (10 KVA T/F-106, 16 KVA T/F 42, 100 KVA T/F 71 Nos, 160 KVA T/F-01 Nos & 250 KVA T/F- 01 Nos. (Apprx 00-70 KM)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.