Dakshinanchal Vidyut Vitran Nigam Limited Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Electrical and Electronics
Eprocure
Opening Date22 Apr 2024
Closing Date7 Jun 2024
Tender Amount₹ 1,64,00,000
Costs
EMD
₹ 1,70,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_922817_1Bid Award Id
ViewTender No
93/EDCA/2023-24Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Aluminium Lug
108
-
-
... More
M.S. Top Channel 125x65x2240 mm
185
-
-
... More
LT Shackle Insulator
153
-
-
... More
LT Shackle Insulator clamp
22
-
-
... More
M.S. Angle 75x75x6x2228 mm
350
-
-
... More
Suspension Clamp
512
-
-
... More
Suspension Clamp with eyehook
146
-
-
... More
Dead End Clamp
237
-
-
... More
I Hook
44
-
-
... More
D. Box Clamp
852
-
-
... More
M.S. Dropper Channel 100x50x2028 mm
193
-
-
... More
Stay Complete
735
-
-
... More
Al. Binding Wire 06mm
214
-
-
... More
F-bracket
163
-
-
... More
M.S. T-off Channel
43
-
-
... More
H.T. T complete
52
-
-
... More
Nut & Bolt for shackle Insulator
156
-
-
... More
Clamp with Nut & Bolt
383
-
-
... More
Clamp for T-Channel
32
-
-
... More
Danger Board with clamp
36
-
-
... More
11 KV V Type Cross Arm clamp
175
-
-
... More
11 KV Cross Arm holding clamp
340
-
-
... More
11 KV PCC Pole clamp
10
-
-
... More
H.T. T Channel
6
-
-
... More
MCCB Unit LT
3
-
-
... More
T/F clamp
21
-
-
... More
Part -B (Work/ Erection)
Carriage of ST Pole 11 Mtr Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
27
-
-
... More
Carriage of PCC Pole 8.5 Mtr. Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
1168
-
-
... More
Carriage of 400 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
7
-
-
... More
Carriage of 250 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
72
-
-
... More
Carriage of 100 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
76
-
-
... More
Carriage of 63 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
33
-
-
... More
Carriage of 25 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
69
-
-
... More
Carriage of 16 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
95
-
-
... More
Cartiage of (LT cable 1x120 & 1x400 and LT XLPE cable 3.5x50sqm, 3.5x95/120/150/240 sqm) from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
5885
-
-
... More
Cartiage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. Aerial bunch conductor/Weasal conductor/Dog/ Rabbit, G.I. earth wire, cross arm, angle, channel, insulators, clamps, Dist. Box, and other line material, if required in Estimate/Package.
200
-
-
... More
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 11 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
27
-
-
... More
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) Single Pole on 8.5 Mtr. long PCC poles including fixing of all accessories, barbed wire for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
896
-
-
... More
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) Double Pole on 8.5 Mtr. long PCC poles including fixing of all accessories, barbed wire for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
136
-
-
... More
Laying sagging stringing and binding and jumpering of ACSR Weasel Conductor at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
18720
-
-
... More
Laying sagging stringing and binding and jumpering of 3x50 sqmm ABC at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
580
-
-
... More
Laying sagging stringing and binding and jumpering of 3x95 sqmm ABC at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
22181
-
-
... More
Laying sagging stringing and binding and jumpering of 3x120 sqmm ABC at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
610
-
-
... More
Laying of L.T. Cable size 1x120 sqmm & 1x400 sqmm LT XLPE cable 3.5x50sqm, 3.5x95/ 120/ 150/ 240 sqm as per RESPO Norms and direction by superivising by Engineer.
5885
-
-
... More
for the work of Chemical Earthing for 250 KVA/400 KVA T/Fs as per RESPO Manual.(All material provided by the contractor at his own cost)
146
-
-
... More
Construction of plinth of size 5' * 5 * 4' above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. .(All material provided by the contractor at his own cost)
73
-
-
... More
Net Fencing Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut ..(All material provided by the contractor at his own cost)
2336
-
-
... More
Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
735
-
-
... More
Fixing of earthing rod as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
566
-
-
... More
Fixing of Danger Boards With clamps (shock Proof, Rust Proofs) on Poles as per RESPO norms.
36
-
-
... More
Installation of 400 KVA T/F on existing Plinth proper alignment direction & making HT/LT connection.
7
-
-
... More
Installation of 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
72
-
-
... More
Installation of 100 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
76
-
-
... More
Installation of 63 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
33
-
-
... More
Installation of 25 KVA T/F on double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
69
-
-
... More
Installation of 16 KVA T/F on single/double pole in proper alignment direction & making HT/LT connection as per Site requirment and RESPO Norms.
95
-
-
... More
Fixing of LT dustribution boxes on already errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement.
414
-
-
... More
Installation of 11 KV D.O. Fuse set as per RESPO NORMS
210
-
-
... More
Fixing of TPMO with Polymer insulator as per Site requirment and RESPO Norms.
174
-
-
... More
Fixing of Tellless Unit on Distribution T/Fs as per Site requirment and RESPO Norms.
16
-
-
... More
Making HT 'T' off connection on existing mains labour, T &P and carrier etc. required for proper completion of work.
52
-
-
... More
Fixing of MCCB Unit LT on Distribution T/Fs as per Site requirment and RESPO Norms.
3
-
-
... More
Removal and Cartiage of old & Used Material (10 KVA T/F-106, 16 KVA T/F 42, 100 KVA T/F 71 Nos, 160 KVA T/F-01 Nos & 250 KVA T/F- 01 Nos. (Apprx 00-70 KM)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements