Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Civil And Construction
Excavation
Eprocure
Opening Date20 Jul 2024
Closing Date27 Jul 2024
Tender AmountRefer Documents
Costs
EMD
₹ 6,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_939459_1Bid Award Id
ViewTender No
05/EDC-I(M)/2024-25Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Carriage of 25 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends
1
-
-
Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
25
-
-
Erection of single pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
43
-
-
Erection of single pole structure 11/13 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
16
-
-
Erection of Double pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
4
-
-
Erection of Double pole structure 11/13 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
2
-
-
Construction of Section pole/“T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work.
4
-
-
Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
15
-
-
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
74
-
-
Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
6915
-
-
Laying, sagging stringing and binding of Arial Bunch Conductor 3x50 sqmm. including jumpering as per RESPO manual.
110
-
-
Laying of 11 KV XLPE Cable size 3x70/120/185 sq.mm. on single pole structure for proper completion of work as per direction of supervising engineer.
370
-
-
Chopping of Tree branches to Clear the route properly.
150
-
-
Mounting of 25 KVA Transformer on the Double pole/Plinth structures and connections thereof.
1
-
-
Fixing of Distribution Box on the erected pole.
2
-
-
Installation of 11 KV TPMO on already erected Double Pole as per direction of supervising engineer.
1
-
-
Installation of 11 KV CT/PT Combined metering unit on existing double pole structure of large & heavy, power consumers to avoid possibility of theft of energy & 11 KV feeders at 33/11 KV sub- station including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage of New 11 KV CT/PT combined metering unit from Store Center Mathura to Site of work.)
2
-
-
Fixing of meter pilfer box (service connection meter holding capacity) including its carriage from Electricity Store Centre Mathura to site of work including grouting of meter pillar box in ratio 1:4:8 cement, sand and brick ballast as per standard norms.
2
-
-
Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material.
59
-
-
Fixing of 11 KV Cable Indoor/Outdoor Jointing Kit of size 3x70/120/185 sq.mm Outdoor including removal of insulation, semi-conductor of the cable end and filling of cable box complete work as per direction of supervising engineer.
16
-
-
Erection of 11 KV Guarding to proper alignment of two nos. GI wire parallel and lacings (tilli) at a distance at 2-3 mtrs. As per RESPO manual. It includes the cost of labour T&P carriage etc required for proper completion.
30
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements