Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Civil And Construction
Excavation
Eprocure
Opening Date9 Jan 2025
Closing DateCancelled
Tender Amount₹ 7,40,000
Costs
EMD
₹ 7,500Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DVVNL_991702_1Tender No
74/EDC-I(M)/2024-25Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Carriage of 25/63 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends
5
-
-
... More
Carriage of 10/16 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends
2
-
-
... More
Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
72
-
-
... More
Erection of single pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
118
-
-
... More
Erection of single pole structure 9/11/13 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
12
-
-
... More
Erection of Double pole structure 8.5 Mtrs Long PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
6
-
-
... More
Erection of Double pole structure 9/11/13 Mtrs Long ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
1
-
-
... More
Construction of “T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work.
13
-
-
... More
Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
23
-
-
... More
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
107
-
-
... More
Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
11171
-
-
... More
Laying, sagging stringing and binding of ACSR Dog Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
126
-
-
... More
Laying, sagging stringing and binding of Arial Bunch Conductor 3x50/95/120 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual.
1250
-
-
... More
Laying of 11 KV XLPE Cable size 3x70/120/185 sq.mm. on single pole structure for proper completion of work as per direction of supervising engineer.
360
-
-
... More
Laying, sagging stringing and binding of LT PVC Cable on the erected PCC pole/STP including jumpering as per RESPO manual.
90
-
-
... More
Providing & fixing of G.I. Pipe size 6" Dia for rising of XLPE Cable 3x70/120/185 sqmm witl clamp as per direction by supervising engineer.
12
-
-
... More
Providing & Fixing of 11 KV Cable Indoor/Outdoor Jointing Kit of size 3x70/120/185 sq.mm Outdoor including removal of insulation, semi-conductor of the cable end and filling of cable box complete work as per direction of supervising engineer.
12
-
-
... More
Mounting of 25/63 KVA Transformer on the Double pole/Plinth structures and connections thereof.
5
-
-
... More
Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material.
139
-
-
... More
Cutting of CC Road for making depth foundation for erection of pole.
123
-
-
... More
Making of 11 KV Guarding by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.
10
-
-
... More
Chopping of Tree branches to Clear the route properly.
309
-
-
... More
Fixing of meter pilfer box (service connection meter holding capacity) including its carriage from Electricity Store Centre Mathura to site of work including grouting of meter pillar box in ratio 1:4:8 cement, sand and brick ballast as per standard norms.
1
-
-
... More
Installation of 11 KV CT/PT Combined metering unit on existing double pole structure of large & heavy, power consumers to avoid possibility of theft of energy & 11 KV feeders at 33/11 KV sub- station including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage of New 11 KV CT/PT combined metering unit from Store Center Mathura to Site of work.)
1
-
-
... More
Installation of 11 KV Drop Out Fuse Set as per RESPO Norms.
4
-
-
... More
Fixing of Distribution Box on the erected pole.
20
-
-