Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Electrical and Electronics
Eprocure
Opening Date11 Jan 2024
Closing Date24 Feb 2024
Tender Amount₹ 2,10,000
Costs
EMD
₹ 2,100Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_880088_1Bid Award Id
ViewTender No
52/EDC(O)/W/2023-24Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
11 KV/0.440 63 KVA T/F New
5
-
-
... More
ACSR Weasel Conductor
6726
-
-
... More
3 Phase Do Fuse Set
5
-
-
... More
G.I. wire 10 swg
112
-
-
... More
Stay wire G.I. 8/7/10 swg
150
-
-
... More
Stay Set Galvanised
30
-
-
... More
11 KV TPMO with Polymer Insulator
6
-
-
... More
Other line Item as - M.S. Dropper Channel, Number Plate, Stone Pad, M.S Top Channel, 11 KV Stay Clamp For PCC Pole, Earthing Rod, 11 KV DP Clamp, T/F Base Angle, Danger Board, Disk Fitting, F Clamp, Polymer Disk Insulator, V-Type Steel X-Arm, 11 KV Composite Polymer Pin Insulator, X-Arm Clamp, M.S Office Channel, 11 KV Stay Loop Insulator, Barbed wire, Earthing Complete, Holding clamp with N&B etc as per estimate.
1
-
-
... More
PART-B
-
-
-
... More
Erection of the following supports after making of pits as per RESSPO norms & filling of pits by concrete of ratio 1:4:8 (cement brick balast & sand). Fitting of all accessories as M.S. Dropper Channel, Number Plate, Stone Pad, M.S Top Channel, 11 KV Stay Clamp For PCC Pole, Earthing Rod, 11 KV DP Clamp, T/F Base Angle, Danger Board, Disk Fitting, F Clamp, Polymer Disk Insulator, V-Type Steel X-Arm, 11 KV Composite Polymer Pin Insulator, X-Arm Clamp, M.S Office Channel, 11 KV Stay Loop Insulator, Barbed wire, Earthing Complete, Holding clamp with N&B Plinthing of support above 300mm ground level by concrete of ratio 1:4:8 (cement brick balast & sand) will be done at the time of erection of pole. Painting of PCC Pole structure as per RESSPO norms also (all type of paints, red oxide primer, nut, bolts & grouting material etc. will be provided by contractor).
-
-
-
... More
PCC Pole 8.5 mtr long with earthing, grouting, concreting of support & stay with all required fitting as per resspo norms.
52
-
-
... More
Energization of 63 kva 11/0.4 T/F New with all fitting including earthing as per resspo norms.
5
-
-
... More
Sagging of ACSR Weasel Conductor as per resspo norms.
6726
-
-
... More
3 Phase Do Fuse Set per resspo norms.
5
-
-
... More
G.I. wire 10 swg per resspo norms.
112
-
-
... More
Stay wire G.I. 8/7/10 swg per resspo norms.
150
-
-
... More
Stay Set Galvanised per resspo norms.
30
-
-
... More
11 KV TPMO with Polymer Insulator per resspo norms.
6
-
-
... More
Clearing of the line route by cutting of tree branches during erection of line and also upto the time of energisation of site incharge
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements