Chaudhary Charan Singh University Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Chaudhary Charan Singh University - CCSU Tender
Civil And Construction
Building Construction
Eprocure
Opening Date4 Jan 2023
Closing Date12 Jan 2023
Tender Amount₹ 15,45,000
Costs
EMD
₹ 1,54,518Document Cost
₹ 3,245Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_CCSUN_764386_1Bid Award Id
ViewTender No
Abhi/15/2022-23/ 50 Dt 28-12-2022Tender Authority
Chaudhary Charan Singh University ViewPurchaser Address
-Website
http://https://www.ccsuniversity.ac.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Finishing wall with water proof external paint (Apex/watercoat/dulux or similar) of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
1290
-
-
... More
Two coat painting or varnishing in small area old wood work & iron work including sand papering, rubbing cleaning for all material required for proper completion of the work
170
-
-
... More
12 mm. (1”)thick plaster with cement, coarse sand in the proportion 1:3 (1-cement, 3-coarse sand) on roof work including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
160
-
-
... More
Finishing wall with two coats of oil bond distemper including sand apering papering, priming & smooth finish by putty including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
710
-
-
... More
Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun reflectivity index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/10 Sqm. One cat of self-priming of elastomeric water proofing liquid (dilution with water in the ration of 3:1 ) and two coats of undiluted elastomeric water proofing liquid (dry film thickness of complete application/ system not less than 500 microns). The operation shall be carried out after scraping and properly cleaning the surface to remove loose particles with wire brushes, complete in all respects as per the direction of Engineer-in-charge.
200
-
-
... More
Paving of Ground with red sand stone 30mm thick with 40mm space in between and filling it with jeera Rodi, Coarse sand and cement & badarpur etc required at site including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
106.25
-
-
... More
P/F. 40 mm. thick fully paneled doors (India) commercial flush shutter including fixing & adjustment and stops & fixing of wooden cleats & stops & handle etc. including supply of all labour, material T&P. etc. required for proper completion of work.(Water proof)
4
-
-
... More
Approximate cost of ISI marked oxidized Aluminium fitting with screw for door & windows etc. (for estimating purpose only) & Stoper, Chutkni, etc including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
4
-
-
... More
Supply and fixing 6 mm.(1/4”) china white glazed tiles in skirting or dado laid with 1:3 cement and approved coarse and mortar finished with white cement slurry, jointing and polishing complete including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
60
-
-
... More
S/F Granite Stone ¾” to 1” thick on floor including preparation of base with 1:4 cement & badarpur etc required at site including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
10
-
-
... More
Repair of Door including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
4
-
-
... More
S/F. Mosquito proof zali heavy quality power loom 144 mesh with wooden beading/Gola including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
30
-
-
... More
M-150 Brick work in 1:3 (one cement & three fine sand of 1.25 F.M) mortar in superstructure including necessary cutting &moulding of bricks as required for wall of one brick thick, add for extra labour to the rate including supply of all labour, tools & plants etc. required for proper completion of the work.
32
-
-
... More
Grinding of floor including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
120
-
-
... More
Cement concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 3:1:5:1 including all labour, material and T&P. etc. required for proper completion of work.
1
-
-
... More
Excavation in foundation in ordinary soil(loam clay or sand) including lift upto (1.50 Ft.) & lead upto30 M.(100 ft.) and including fitting, watering, ramming of excavated earth into the trenches or into space between the building & the sides of foundation trenches or into the plinth and removal and disposal or surplus earth as directed by the Engineer-in-charge upto a distance of 30 M. (100 ft.) from the foundation trenches
10
-
-
... More
Dismantling of old window, Almirah, slabs & B/W including supply of all materials, labor, tools & plants etc. required for proper completion of the work
10
-
-
... More
Dismantling of old Floor, plaster and wall including supply of all materials, labour, tools & plants etc. required for proper completion
26
-
-
... More
Dismantling of Brick work or stone work in lime or cement mortar and including stacking ofmaterials as directed by the Engineer-in-charge.
25
-
-
... More
Concrete with 4 Cm. gauge stone ballast, fine sand of 1.25 F.M. & cement in proportion of 8:4:1 in foundation & floors including all labour, material and T&P. etc. req for proper completion of work.
18
-
-
... More
M-150 brick work in 1:6 (1-cement, 6-coarse sand) motar in foundation and plinth including supply of all materials, labor, tools & plants etc. required for proper completion of the work
4.5
-
-
... More
Making of half round granite stone double moulding including cutting, edging, polishing & using with adhesive material including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
20
-
-
... More
Making of false ceiling with tile 2'x2' & 4mm. of E-board Co., T channel with G.I. fitting 18 gauge. The rates include the cost of all materials, fixtures screws necessary beading including all labour and material complete with two coat of oil bound paint over false ceiling.
90
-
-
... More
M.S iron work in Heavy sizes such as trusses, built up gates, record racks, roof work, gates etc, including riveting or welding where necessary required from including supply of steel bolts. Nuts wastage etc. and their fixing required for proper completion of the work.
20
-
-
... More
R.C.C. work with cement approved coarse sand and 2 Cm.(3/4")gauge approved stone ballast in the proportion 1:12:3 in slab, excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 BWC GI binding wire & including necessary centering and shuttering etc. and also including supply of all materials, labour, tools & plants etc. required for proper completion of the work
0.5
-
-
... More
2.5 cm. thick Damp proof course with cement concrete consisting of 1 part cement, 1% parts approved coarse sand and 3 parts approved 10 mm. graded stone grit and including water proofing as ordered by the Engineer incharge in the proportion as specified by the manufacture including supply of all labour, tools & plants etc. required for proper completionof the work and including proper curing & shuttering as necessary
10
-
-
... More
S/F of color corrugated galvanized profile sheet fix with metro screw including supply of all materials, labor, tools & plants etc. required for proper completion of the work
90
-
-
... More
Making of sun shade frame with 50mm x 50mm pipe heavy quality pillar and truss and 40mm x 40mm pipe (heavy quality) purling with clit including supply of all materials, labor, tools & plants etc. required for proper completion of the work
40
-
-
... More
P/F. 8mm Polly carbonate sheet multi wall in multi colour fixed with and rubber required for fixing the shed and joint filled by silicon also including supply of all materials, labor, tools & plants etc. required for proper completion of the work
40
-
-
... More
Supply of rolling shutter of approved make made 80x125mm (3”x5”) cold rolled M.S lath inter locked throughout their entire length and joined together at the end by end locks and mounted on specially designed pipe shaft with brackets, side guides and arrangement for inside and outside locking with push and pull operation complete but excluding the cost of top cover and spring
30
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements