Chaudhary Charan Singh University Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Chaudhary Charan Singh University - CCSU Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date25 Jan 2023
Closing Date31 Jan 2023
Tender Amount₹ 5,21,000
Costs
EMD
₹ 52,125Document Cost
₹ 1,095Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_CCSUN_769234_1Bid Award Id
ViewTender No
Abhi/15/2022-23/ 45 Dt 19-01-2023Tender Authority
Chaudhary Charan Singh University ViewPurchaser Address
-Website
http://https://www.ccsuniversity.ac.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
M-150 Brick work in 1:3 (one cement & three fine sand of 1.25 F.M) mortar in superstructure including necessary cutting &moulding of bricks as required for wall of half brick thick, add for extra labour to the rate including supply of all labour, tools & plants etc. required for proper completion of the work
6
-
-
... More
12 mm. (1/2”)thick plaster with cement, coarse sand & fine sand in the proportion 1:1:3 (1-cement, 1-coarse sand, 3-fine sand) over plain brick work including supply of all materials, labour, tools & plants etc. required for proper completion of the work
60
-
-
... More
Mild steel, cold twisted tor steel or iron in plain work such as reinforced concrete or reinforced brick work(when not including in an over all rates)wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage, bend, hook and authorized over lapping shall be measured, cold twisted tor steel shall be used for bars above 8 mm. dia.
1
-
-
... More
P/F 40mm thick plywood flush shutter or other approved quality plywood flush shutter including supply and fixing of wooden cleat foot stooper and including fixing and adjustment of hings locks, handle, springs or other fitting but excluding their supply.
6
-
-
... More
P/F of Glazed window including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
2.4
-
-
... More
Dismantling of old birck work & plaster including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
2
-
-
... More
Approximate cost of oxidized fitting with screw for doors as per schedule including supply of all materials.
28
-
-
... More
P/F of curtain rod including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
15
-
-
... More
Repair of Door including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
7
-
-
... More
S/F. Mosquito proof zali heavy quality power loom 144 mesh with wooden beading/Gola including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
5
-
-
... More
S/F. 10 mm. thick vitrified tile size 24”x24” premier quality flooring or in skirting or dado laid with pidilite chemical finished with white cement & colour jointing and polishing including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
120
-
-
... More
4cm.(1½”) thick 1:2:4 plain cement concrete floor with cement approved coarse sand and 2 Cm. (1”)graded approved stone laid in panels finished with 3 mm. (1/8”) floating coat of neat cement and marble dust in ratio 5:1 as specified over and including 8 Cm. (3”) thick base concrete consisting of cement, fine sand of 1.25 finess modulas & brick ballast 4 Cm. (1½) gauge in the proportion of 1:4:8 & removing any over lapping mortar at the joints or the panels if any and giving them a uniform finish, including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
8
-
-
... More
S/F Galvanzied high profile sheet roofing 24 B.W.G. in position including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
10
-
-
... More
S/F. 5mm thick plain glass with wooden beading or with glass putty and breads including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
5
-
-
... More
Scraping old white of colour wash including disposal of refuse as directd by the Engineer-in-charge within a distance of 60 metre (200feet)
540
-
-
... More
One coat cement primer old/new surface including all material, labour tools & plants etc. required for proper completion of the work.
540
-
-
... More
Providing wall putty on old surface with approval quality material of berger/J.K. Birla or similar make 2 coats including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
540
-
-
... More
Finishing wall with two coats of oil bond distemper including sand apering papering, priming & smooth finish by putty including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
540
-
-
... More
Two coat enamel painting or varnishing sand papering and smooth surface by putty including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
540
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements