Central Warehousing Corporation Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Central Warehousing Corporation - CWC Tender

Goods
GEM
Opening Date14 Sep 2024
Closing Date5 Oct 2024
Tender Amount₹ 1,67,49,222 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ELWB TRANSPORATION , Transportation, toll tax, Octroi, State Entry tax, if applicable, packing, forwarding loading unloading and insurance etc. lump-sum for each center separately.

1

-

-

... More
ELWB , Cost of civil & electrical work (including construction of weighbridge foundation weighbridge cabin, ramp, Localized soil stabilization as per requirement etc.

1

-

-

... More
ELWB , Installation, commissioning and stamping charges of weigh bridge complete in all respect including integration with WMS other software.

1

-

-

... More
ELWB APPROCH ROAD , Cost of approach road for Sq. m. The area of road will be given by RM on case basis.

1

-

-

... More
ELWB MISC , Any other cost not envisaged above but required for the completion of turnkey job like cost involved for various types of soils i e black cotton soil, rocky soil or marine clay (where piling may be required) Rates for pilling may be quoted by the party for total pilling work.RM may decide the quantity of the running meter.

1

-

-

... More
ELWB AMC , Annual Maintenance of ELWB for Four (04) years from the date of expiry of defect liability guarantee period. Total AMC Cost

4

-

-

... More
ELWB , Electronic load cell type, pitless lorry weighbridge of capacity 60MT and platform of as above sizes respectively with other accessories. Platform complete with main girders, support sections, horizontal constraining arrangements and grouting parts as required. generally conforming to IS 2062 Load cells with integral cables and mountings for load cells.

1

-

-

... More
ELWB , Personal Computer (make HP DELL LENOVO ACER) should be of Intel i5 6th generation or above 2.8 GHz or more speed) equipped 104 keys alphanumeric Key board having memory of minimum. 100000 weighments, 17 INCH LED or above Colour Monitor and Optical Mouse

1

-

-

... More
ELWB , Electrical and electronic parts comprising of Junction boxes, Cable between junction box and weigh cabin, Digital Weight Indicator, Constant voltage stabilizer. Dot Matrix 80 col. Ticket Printer (make EPSON TVS WIPRO HCL) compatible with PC, U.P.S. and Jumbo display unit.

1

-

-

... More
ELWB TRANSPORATION , Transportation, toll tax, Octroi, State Entry tax, if applicable, packing, forwarding loading unloading and insurance etc. lump-sum for each center separately.

1

-

-

... More
ELWB , Cost of civil & electrical work (including construction of weighbridge foundation weighbridge cabin, ramp, Localized soil stabilization as per requirement etc.

1

-

-

... More
ELWB , Installation, commissioning and stamping charges of weigh bridge complete in all respect including integration with WMS other software.

1

-

-

... More
ELWB APPROCH ROAD , Cost of approach road for Sq. m. The area of road will be given by RM on case basis.

1

-

-

... More
ELWB MISC , Any other cost not envisaged above but required for the completion of turnkey job like cost involved for various types of soils i e black cotton soil, rocky soil or marine clay (where piling may be required) Rates for pilling may be quoted by the party for total pilling work.RM may decide the quantity of the running meter.

1

-

-

... More
ELWB AMC , Annual Maintenance of ELWB for Four (04) years from the date of expiry of defect liability guarantee period. Total AMC Cost

4

-

-

... More
ELWB , Electronic load cell type, pitless lorry weighbridge of capacity 60MT and platform of as above sizes respectively with other accessories. Platform complete with main girders, support sections, horizontal constraining arrangements and grouting parts as required. generally conforming to IS 2062 Load cells with integral cables and mountings for load cells.

1

-

-

... More
ELWB , Personal Computer (make HP DELL LENOVO ACER) should be of Intel i5 6th generation or above 2.8 GHz or more speed) equipped 104 keys alphanumeric Key board having memory of minimum. 100000 weighments, 17 INCH LED or above Colour Monitor and Optical Mouse

1

-

-

... More
ELWB , Electrical and electronic parts comprising of Junction boxes, Cable between junction box and weigh cabin, Digital Weight Indicator, Constant voltage stabilizer. Dot Matrix 80 col. Ticket Printer (make EPSON TVS WIPRO HCL) compatible with PC, U.P.S. and Jumbo display unit.

1

-

-

... More
ELWB TRANSPORATION , Transportation, toll tax, Octroi, State Entry tax, if applicable, packing, forwarding loading unloading and insurance etc. lump-sum for each center separately.

1

-

-

... More
ELWB , Cost of civil & electrical work (including construction of weighbridge foundation weighbridge cabin, ramp, Localized soil stabilization as per requirement etc.

1

-

-

... More
ELWB , Installation, commissioning and stamping charges of weigh bridge complete in all respect including integration with WMS other software.

1

-

-

... More
ELWB APPROCH ROAD , Cost of approach road for Sq. m. The area of road will be given by RM on case basis.

1

-

-

... More
ELWB MISC , Any other cost not envisaged above but required for the completion of turnkey job like cost involved for various types of soils i e black cotton soil, rocky soil or marine clay (where piling may be required) Rates for pilling may be quoted by the party for total pilling work.RM may decide the quantity of the running meter.

1

-

-

... More
ELWB AMC , Annual Maintenance of ELWB for Four (04) years from the date of expiry of defect liability guarantee period. Total AMC Cost

4

-

-

... More
ELWB , Electronic load cell type, pitless lorry weighbridge of capacity 60MT and platform of as above sizes respectively with other accessories. Platform complete with main girders, support sections, horizontal constraining arrangements and grouting parts as required. generally conforming to IS 2062 Load cells with integral cables and mountings for load cells.

1

-

-

... More
ELWB , Personal Computer (make HP DELL LENOVO ACER) should be of Intel i5 6th generation or above 2.8 GHz or more speed) equipped 104 keys alphanumeric Key board having memory of minimum. 100000 weighments, 17 INCH LED or above Colour Monitor and Optical Mouse

1

-

-

... More
ELWB , Electrical and electronic parts comprising of Junction boxes, Cable between junction box and weigh cabin, Digital Weight Indicator, Constant voltage stabilizer. Dot Matrix 80 col. Ticket Printer (make EPSON TVS WIPRO HCL) compatible with PC, U.P.S. and Jumbo display unit.

1

-

-

... More
ELWB TRANSPORATION , Transportation, toll tax, Octroi, State Entry tax, if applicable, packing, forwarding loading unloading and insurance etc. lump-sum for each center separately.

1

-

-

... More
ELWB , Cost of civil & electrical work (including construction of weighbridge foundation weighbridge cabin, ramp, Localized soil stabilization as per requirement etc.

1

-

-

... More
ELWB , Installation, commissioning and stamping charges of weigh bridge complete in all respect including integration with WMS other software.

1

-

-

... More
ELWB APPROCH ROAD , Cost of approach road for Sq. m. The area of road will be given by RM on case basis.

1

-

-

... More
ELWB MISC , Any other cost not envisaged above but required for the completion of turnkey job like cost involved for various types of soils i e black cotton soil, rocky soil or marine clay (where piling may be required) Rates for pilling may be quoted by the party for total pilling work.RM may decide the quantity of the running meter.

1

-

-

... More
ELWB AMC , Annual Maintenance of ELWB for Four (04) years from the date of expiry of defect liability guarantee period. Total AMC Cost

4

-

-

... More
ELWB , Electronic load cell type, pitless lorry weighbridge of capacity 60MT and platform of as above sizes respectively with other accessories. Platform complete with main girders, support sections, horizontal constraining arrangements and grouting parts as required. generally conforming to IS 2062 Load cells with integral cables and mountings for load cells.

1

-

-

... More
ELWB , Personal Computer (make HP DELL LENOVO ACER) should be of Intel i5 6th generation or above 2.8 GHz or more speed) equipped 104 keys alphanumeric Key board having memory of minimum. 100000 weighments, 17 INCH LED or above Colour Monitor and Optical Mouse

1

-

-

... More
ELWB , Electrical and electronic parts comprising of Junction boxes, Cable between junction box and weigh cabin, Digital Weight Indicator, Constant voltage stabilizer. Dot Matrix 80 col. Ticket Printer (make EPSON TVS WIPRO HCL) compatible with PC, U.P.S. and Jumbo display unit.

1

-

-

... More
ELWB TRANSPORATION , Transportation, toll tax, Octroi, State Entry tax, if applicable, packing, forwarding loading unloading and insurance etc. lump-sum for each center separately.

1

-

-

... More
ELWB , Cost of civil & electrical work (including construction of weighbridge foundation weighbridge cabin, ramp, Localized soil stabilization as per requirement etc.

1

-

-

... More
ELWB , Installation, commissioning and stamping charges of weigh bridge complete in all respect including integration with WMS other software.

1

-

-

... More
ELWB APPROCH ROAD , Cost of approach road for Sq. m. The area of road will be given by RM on case basis.

1

-

-

... More
ELWB MISC , Any other cost not envisaged above but required for the completion of turnkey job like cost involved for various types of soils i e black cotton soil, rocky soil or marine clay (where piling may be required) Rates for pilling may be quoted by the party for total pilling work.RM may decide the quantity of the running meter.

1

-

-

... More
ELWB AMC , Annual Maintenance of ELWB for Four (04) years from the date of expiry of defect liability guarantee period. Total AMC Cost

4

-

-

... More
ELWB , Electronic load cell type, pitless lorry weighbridge of capacity 60MT and platform of as above sizes respectively with other accessories. Platform complete with main girders, support sections, horizontal constraining arrangements and grouting parts as required. generally conforming to IS 2062 Load cells with integral cables and mountings for load cells.

1

-

-

... More
ELWB , Personal Computer (make HP DELL LENOVO ACER) should be of Intel i5 6th generation or above 2.8 GHz or more speed) equipped 104 keys alphanumeric Key board having memory of minimum. 100000 weighments, 17 INCH LED or above Colour Monitor and Optical Mouse

1

-

-

... More
ELWB , Electrical and electronic parts comprising of Junction boxes, Cable between junction box and weigh cabin, Digital Weight Indicator, Constant voltage stabilizer. Dot Matrix 80 col. Ticket Printer (make EPSON TVS WIPRO HCL) compatible with PC, U.P.S. and Jumbo display unit.

1

-

-

... More
ELWB TRANSPORATION , Transportation, toll tax, Octroi, State Entry tax, if applicable, packing, forwarding loading unloading and insurance etc. lump-sum for each center separately.

1

-

-

... More
ELWB , Cost of civil & electrical work (including construction of weighbridge foundation weighbridge cabin, ramp, Localized soil stabilization as per requirement etc.

1

-

-

... More
ELWB , Installation, commissioning and stamping charges of weigh bridge complete in all respect including integration with WMS other software.

1

-

-

... More
ELWB APPROCH ROAD , Cost of approach road for Sq. m. The area of road will be given by RM on case basis.

1

-

-

... More
ELWB MISC , Any other cost not envisaged above but required for the completion of turnkey job like cost involved for various types of soils i e black cotton soil, rocky soil or marine clay (where piling may be required) Rates for pilling may be quoted by the party for total pilling work.RM may decide the quantity of the running meter.

1

-

-

... More
ELWB AMC , Annual Maintenance of ELWB for Four (04) years from the date of expiry of defect liability guarantee period. Total AMC Cost

4

-

-

... More
ELWB , Electronic load cell type, pitless lorry weighbridge of capacity 60MT and platform of as above sizes respectively with other accessories. Platform complete with main girders, support sections, horizontal constraining arrangements and grouting parts as required. generally conforming to IS 2062 Load cells with integral cables and mountings for load cells.

1

-

-

... More
ELWB , Personal Computer (make HP DELL LENOVO ACER) should be of Intel i5 6th generation or above 2.8 GHz or more speed) equipped 104 keys alphanumeric Key board having memory of minimum. 100000 weighments, 17 INCH LED or above Colour Monitor and Optical Mouse

1

-

-

... More
ELWB , Electrical and electronic parts comprising of Junction boxes, Cable between junction box and weigh cabin, Digital Weight Indicator, Constant voltage stabilizer. Dot Matrix 80 col. Ticket Printer (make EPSON TVS WIPRO HCL) compatible with PC, U.P.S. and Jumbo display unit.

1

-

-

... More
ELWB TRANSPORATION , Transportation, toll tax, Octroi, State Entry tax, if applicable, packing, forwarding loading unloading and insurance etc. lump-sum for each center separately.

1

-

-

... More
ELWB , Cost of civil & electrical work (including construction of weighbridge foundation weighbridge cabin, ramp, Localized soil stabilization as per requirement etc.

1

-

-

... More
ELWB , Installation, commissioning and stamping charges of weigh bridge complete in all respect including integration with WMS other software.

1

-

-

... More
ELWB APPROCH ROAD , Cost of approach road for Sq. m. The area of road will be given by RM on case basis.

1

-

-

... More
ELWB MISC , Any other cost not envisaged above but required for the completion of turnkey job like cost involved for various types of soils i e black cotton soil, rocky soil or marine clay (where piling may be required) Rates for pilling may be quoted by the party for total pilling work.RM may decide the quantity of the running meter.

1

-

-

... More
ELWB AMC , Annual Maintenance of ELWB for Four (04) years from the date of expiry of defect liability guarantee period. Total AMC Cost

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.