Cane Development And Sugar Industry Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Cane Development And Sugar Industry Tender

Works
Civil Works Buildings
Eprocure
Opening Date24 Dec 2019
Closing Date30 Dec 2019
Tender Amount₹ 5,71,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation of foundation ordinary soil (Loam,clay or sand ) including lift up to 1.50M and laed upto 30M. And including filling watering and ramming of excavated earth etc.

139.34

-

82

... More
Concrete with 4cm Guage brick ballast fine sand of 1.25 FM. And cement in proportion of 1:6:12 in foundation labour tool and palns complition of work.

1.9

-

2600

... More
M-150 B/W one cement and fine sand mortar 1:5 in foundation and plinth including supply of all materials labour tools & plan etc . Requir of proper coplition of work up to plinth

6.46

-

3600

... More
2.5cm. Thick Damep proof Course with app. Grit cement and approved coarse sand 1:1.5:3 with and including water proofing as ordered by the Engineer incharge in the proprtion as specification by the manufacturer including supply all materials labour

4.52

-

275

... More
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km from the site of work and including watering, dressing etc. required the proper completion of the work.

30.24

-

380

... More
M-150 B/W as in item no.4 above but 1:5 super structure including necessary cutting & moulding of bricks as reqired thickness of walls not to above items.

5.07

-

3780

... More
R.C.C. work with cement app. Coarse sand & 2cm. Gauge approved stone grit in proprtion of 1:1.5:3 in R.C.C. column and beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W. G.G.I. binding wire and including necessary cement and shuttering etc.

1.61

-

6600

... More
R.C.C. work with cement app. Coarse sand & 2cm. Gauge approved stone grit in proprtion of 1:1.5:3 ratio reinforcement and its bending but including its fixing and binding the same with supply all materials labour , tool&plants etc.

2.96

-

6050

... More
M.S. ( for steel or plain ) in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage bend hooks and authorised overlaping shall be measured and including cost of binding wire.

3.58

-

5600

... More
12cm thick plaster with cement and fine sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm. including supply of all materials labour tools & plants etc.

85.31

-

154

... More
2.50cm. Thick 1:2:4 pain cement concrete floor with cement approved coarse sand and 2cm. Graded approved stone grit laid in panels finished with 3mm. Floating coat of neat cement and marble dust in supply all matrials labour, tool & plants etc.

291.82

-

480

... More
20mm th. 1:3 C:C/s roof treatment

2.97

-

175

... More
Prooviding and fixing glass sttrips 4 mm. thickness and skirting at the time of laying labour.

14

-

15

... More
S/F Mosquito Jali Supply all materials labour, Tool nd Plant etc.

14.04

-

600

... More
Painting two coat over priming coat

39

-

58

... More
Distempint (First coat) with oil bound distemper of approved brand and manufacture and required shade.

619.7

-

66

... More
Dismentaling of old reinforcement concrete

1.47

-

316

... More
Supply and Fixing 100 mm dia rain water pipe all matrials and labours.

15.6

-

175

... More
Earth work filling in soil with cartidge 2 km.

90

-

137.7

... More
Laying of brick soling (M-150) class brick laid

100

-

345

... More
Providing and Laying Brick Coba 12 mm.

66.47

-

865

... More
Supply and Fixing New door fully plywood including wood panels.

15.44

-

4550



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.