Cane Development And Sugar Industry Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Cane Development And Sugar Industry Tender
Civil And Construction
Road Construction
Eprocure
Opening Date9 Sep 2022
Closing Date28 Sep 2022
Tender AmountRefer Documents
Costs
EMD
₹ 78,300Document Cost
₹ 1,590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_CDSI_727132_2Bid Award Id
ViewTender No
333C DATE 06/09/2022 PILIBHITTender Authority
Cane Development And Sugar Industry ViewPurchaser Address
-Website
http://http://upcane.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying Cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and T&P etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation
7.08
-
6384
... More
40 mm cement concrete flooring 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate of size 12.50mm and below) laid over base concrete and finished with floating coat of neat cement (without base concrete to be paid seperately)
332.7
-
422.75
... More
R.C.C. work with cement approved coarse sand and 2cm (3/4'') gauge approved srone ballast in the proportion 1:1.5.3 (1Cement: 4.5aggregate) in Lintel band excluding supply of reinforcement and its bending but including its fixing and binding the same necessary with 24BWG binding wire and including necessary centering and shuttering etc. and also including supply of materials labour and tools and plants etc. required for proper completion of the work, strength of the concrete shall not be less than M-150.
1.98
-
8003.75
... More
M-150 brick work in 1:6 cement and coarse sand of 2.25 coarseness modulus mortar in super-structure. Above plinth level up to floor two level (up to two storey) including necessary cutting and molding of brick work as required and also including honey combed brick work in thickness of wall more than 12cms.
5.11
-
5510
... More
Mild steel or iron work in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & over lapping & hooks.
2.28
-
8426.5
... More
12 mm cement plaster in single coat on rough side of single or brick wall for interior plastering up to floor two level including internal rounded angles not exceeding 80 mm in girth and finshed even and smooth. (1) 1 cement :4 fine sand. (ICeiling)l
251.68
-
184.3
... More
12mm cement plaster in single coat on fair side of single or brick wall for exterior plastering up to floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80mm in girth and finished even and smooth no extra for mixing any additive. (1)1 cement : 4 fine sand. Outer & Inner Wall
1036.37
-
166.25
... More
M.S. or Iron work of small sizes and sections such as holding down bolts, hold fast tie rods, gratings etc. wrought to required from including supply of steel bolts, nuts wastage etc and fixing required for proper completion of the work. Providing & fixing of hold fasts.
40
-
85.5
... More
M.S. or Iron work of small sizes and sections such as holding down bolts, hold fast tie rods, gratings etc. wrought to required from including supply of steel bolts, nuts wastage etc and fixing required for proper completion of the work. Z-Section steel windows (openable)
352.8
-
80.75
... More
M.S. or Iron work of small sizes and sections such as holding down bolts, hold fast tie rods, gratings etc. wrought to required from including supply of steel bolts, nuts wastage etc and fixing required for proper completion of the work. Door Frame (40x40x6)
280
-
88.45
... More
Providing, Suppling and fixing flush doors, Commercial Quality cenferming 2202 part I (1983) includingh fixing of wooden cleats and stopper and adjustemt of hinges, bolts, locks, handles springs, fitting the necessary screws complition of the work (ii) 35mm thick
15.12
-
1372.75
... More
Providing and fixing fly proof galvanized M.S. wire gauge to windows and clerestory windows using wire gauge with average width of aperture 1.4 mm in both directions with wire of dia 0.63 mm all complete.With 12 mm mild steel U beading
41.8
-
771.4
... More
General Repairing of roof work of samiti central khad godown and samiti office roof proper supply of roof treatment material labour and all labour proper complition of work.
3
-
23750
... More
General repairing of electric work in central godown pilibhit
1
-
19000
... More
Construction of rounded chabutra and mild steel grill mild steel work …. As per attached detail mesurement and cost
1
-
50296.88
... More
Providing and fixing of rain water pipe in samiti khad godown building. Supply of all materials and T&P etc…….. Completion of work
36
-
104.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements