Cane Development And Sugar Industry Tender
... More
The Cane Development And Sugar Industry has issued a formal invitation for competitive bids for Construction Of Naurangabad Road To Aili Ganna Krya Kendra Road in Lakhimpur Kheri, Uttar Pradesh, with an estimated contract value of Rs. 22,52,000. The bid opening date for this tender is 23-09-2019 and the last date for bid submission is 30-09-2019. Interested bidders for Cane Development And Sugar Industry tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Cane Development And Sugar Industry Tender
Eprocure
Opening Date23 Sep 2019
Closing Date30 Sep 2019
Tender Amount₹ 22,52,000
Costs
EMD
₹ 2,25,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_CDSI_383309_2Tender No
250/c dated 19-09-2019Tender Authority
Cane Development And Sugar Industry ViewPurchaser Address
-Website
http://http://upcane.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Tack coat-Providing and applying tack coat with Bitumen V.G.-10 using emulsion distributor at the rate of 0.35 kg/sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 502 Sr. 5.2(iii)
1743.75
2203
1.26
... More
Earth work on shoulders -Construction of embankment with approved material obtained from borrow pits(carted earth) with a lift upto 1.5m & lead up to 1000 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 . as per Technical Specification clause 301.5
381.3
30833
80.86
... More
Brick Soling (C) Brick soling with straight over burnt bricks laid on edge and dry labour only including preparation of sub-grade to prescribed camber filling joints with local earth spreading blinding coat 1 cm. 3/8" depth of 'local earth over the entire surface and including cost of material, labour and T&P etc. required for proper completion of the work. as per MORD specification 412 sl no 4.18
372
137826
370.5
... More
CARTAGE OF MAXPHALT (B) Cartage of empty drums maxphalt from site to godown.
4.29
158
36.93
... More
Road Furniture(A) Direction Sign Board of 4'x3' size having 18 gauge sheet with the post of 1-1/4" dia. white & Red alternate Painted Pipe incl. fixing in c.c. of 1:2:4 cement, c.sand & stone grit with piller.
1
4750
4750
... More
Cement Treated Base( For C.B.R. 5% To 8% )-Provding laying and spreading material on a prepared subbase, adding cement @4% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of Base.
130.78
675846
5167.81
... More
CARTAGE OF MAXPHALT (A) Cartage of maxphalt from godown to site.
4.29
792
184.63
... More
Premix carpet-Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
1743.75
208113
119.35
... More
Bituminous Course-Supply of Bitumen V.G.-10 for Tack coat, P.C. & Seal Coat @ (0.35+1.46+0.68) Kg./m2. .
4.29
136662
31856
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements